Preferred Language
Articles
/
bsj-2627
The construction of Complete (kn,n)-arcs in The Projective Plane PG(2,5) by Geometric Method, with the Related Blocking Sets and Projective Codes
...Show More Authors

A (k,n)-arc is a set of k points of PG(2,q) for some n, but not n + 1 of them, are collinear. A (k,n)-arc is complete if it is not contained in a (k + 1,n)-arc. In this paper we construct complete (kn,n)-arcs in PG(2,5), n = 2,3,4,5, by geometric method, with the related blocking sets and projective codes.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Dec 28 2020
Journal Name
Journal Of Physical Education
Time of Motor Response To Stimuli (Auditory and Visual) and Its relationship with Blocking Accuracy In Volleyball
...Show More Authors

The research aim at identifying the time of motor response to auditory and visual stimuli as well as identifying the accuracy of blocking and finding the relationship between motor repose time and blocking accuracy. The community was (7) primer soccer league of 2019 – 2020 and the subjects were (24) volleyball players from Al Jaish and Al Shorta clubs ten players from Al Shorta club performed the pilot study. The researchers used the descriptive method and the data was collected and treated using SPSS. The results showed a significant relationship between response time and blocking accuracy. The researchers recommended concentrating on applying scientific principles for developing time of motor response in a manner suitable for bl

... Show More
Crossref
Publication Date
Fri May 01 2020
Journal Name
International Journal Of Psychosocial Rehabilitation
Relationship of some fitness elements with the performance of lifting the iron ball (weight) by gliding method
...Show More Authors

AS Muhsen, International Journal of Psychosocial Rehabilitation (1475-7192), 2020 - Cited by 1

View Publication
Publication Date
Sat May 11 2013
Journal Name
Journal Of Arts Of Thiqar
Mistranslation of Sex-related Euphemistic Expressions with reference to the Translations of the Qur'an
...Show More Authors

Publication Date
Thu Jan 15 2015
Journal Name
Journal Of Education For Pure Science
Synthesis and Characterization of New Conjugated Systems Derived from Piperazine-2,5-dione with antimicrobial screening
...Show More Authors

Publication Date
Thu Jan 24 2019
Journal Name
Journal Of Al-qadisiyah For Computer Science And Mathematics
On strongly E-convex sets and strongly E-convex cone sets
...Show More Authors

              -convex sets and -convex functions, which are considered as an important class of generalized convex sets and convex functions, have been introduced and studied by Youness [5] and other researchers. This class has recently extended, by Youness, to strongly -convex sets and strongly -convex functions. In these generalized classes, the definitions of the classical convex sets and convex functions are relaxed and introduced with respect to a mapping . In this paper, new properties of strongly -convex sets are presented. We define strongly -convex hull, strongly -convex cone, and strongly -convex cone hull and we proof some of their properties.  Some examples to illustrate the aforementioned concepts and to cl

... Show More
View Publication
Crossref
Publication Date
Sun Sep 04 2016
Journal Name
Baghdad Science Journal
The Importance and Interaction Indices of Bi-Capacities Based on Ternary-Element Sets
...Show More Authors

Grabisch and Labreuche have recently proposed a generalization of capacities, called the bi-capacities. Recently, a new approach for studying bi-capacities through introducing a notion of ternary-element sets proposed by the author. In this paper, we propose many results such as bipolar Mobius transform, importance index, and interaction index of bi-capacities based on our approach.

View Publication Preview PDF
Crossref
Publication Date
Fri Jun 29 2018
Journal Name
Journal Of Engineering
Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects
...Show More Authors

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identi

... Show More
View Publication Preview PDF
Crossref (17)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Wed Dec 27 2023
Journal Name
Journal Of Planner And Development
The impact of infrastructure planning of complete street elements on the urban environment
...Show More Authors

In contemporary cities, the expansion of the use of vehicles has led to the deterioration of the urban environment. To counter this, many concepts and strategies emerged that attempted to regulate mobility in cities and limit its effects. The concept of a "complete street" is one of the modern trends concerned with diversifying means of transportation and reducing the disadvantages of mechanical transportation methods This paper discusses the role that complete streets can play in developing the urban environment in the Alyarmok District of Baghdad, which suffers from traffic congestion and its associated problems.In this study, 104 people were surveyed in the Alyarmok region, and the linear regression method was used to analyze their op

... Show More
View Publication Preview PDF