A (k,n)-arc is a set of k points of PG(2,q) for some n, but not n + 1 of them, are collinear. A (k,n)-arc is complete if it is not contained in a (k + 1,n)-arc. In this paper we construct complete (kn,n)-arcs in PG(2,5), n = 2,3,4,5, by geometric method, with the related blocking sets and projective codes.
The current research aims to examine the effect of the rapid learning method in developing creative thinking among second-grade female students in the subject of history. Thus, the researcher has adopted an experimental design of two groups to suit the nature of the research. The sample of the study consists of (36) randomly selected students from Al-Shafaq Secondary School for Women, which are divided randomly into two groups. The first group represents the experimental; it includes (31) students who studied the subject of history using the quick learning method. The second group, on the other hand, is the control group, which consists of (32) students, who studied the same subject using the traditional way. Before starting with the exp
... Show MoreThis research deals with unusual approach for analyzing the Simple Linear Regression via Linear Programming by Two - phase method, which is known in Operations Research: “O.R.”. The estimation here is found by solving optimization problem when adding artificial variables: Ri. Another method to analyze the Simple Linear Regression is introduced in this research, where the conditional Median of (y) was taken under consideration by minimizing the Sum of Absolute Residuals instead of finding the conditional Mean of (y) which depends on minimizing the Sum of Squared Residuals, that is called: “Median Regression”. Also, an Iterative Reweighted Least Squared based on the Absolute Residuals as weights is performed here as another method to
... Show MoreIn this paper, a new approach was suggested to the method of Gauss Seidel through the controlling of equations installation before the beginning of the method in the traditional way. New structure of equations occur after the diagnosis of the variable that causes the fluctuation and the slow extract of the results, then eradicating this variable. This procedure leads to a higher accuracy and less number of steps than the old method. By using the this proposed method, there will be a possibility of solving many of divergent values equations which cannot be solved by the old style.
The research Aim is to provide support to small enterprises by providing tools that enable measurement and test their performance and identifying weaknesses and work on them is determined by the problem of searching using traditional assessment methods for small projects with only financial performance measurement standards that do not provide a complete picture of the performance of these projects so use the balanced scorecard the four pillars (financial, customer, learning and growth, and internal processes) and identify deviations and work on them through the use of the outputs of the programme (probe), PROmoting Business Excellence-PROBE), which It is a model of performance evaluation, with which you can deve
... Show MoreBackground: Patients with decompensated cirrhosis are often given therapeutic and prophylactic drugs. Polypharmacy raises both the likelihood of prescription errors and the complications associated with drugs. Clinical pharmacists are excellent at recognizing, addressing, and preventing clinically significant drug-related problems.
Objectives: Identification types of pharmacist interventions to address drug-related problems in patients with decompensated cirrhosis and assess the acceptance/implementation of these recommendations. And identify patient factors associated with accepting pharmacist recommend
... Show More5-fluorouracil (5-FU) is a is Pyrimidine analogue widely used in the treatment of various malignancies It belongs to the antimetabolites family that acts during the S-phase of the cell cycle thus it prevents DNA synthesis.N-acetylcysteine is nutritional complement acts as antioxidant.The purpose of the current study is to investigate whether there is a protective role of N-acetylcystein against intestinal toxicity induced by 5-fluorouracil in albino rats.18 healthy adult rats were distributed into 3 groups of 6 rats for each. Group A as a control group.Group B injected with 5-FU (20 mgs dissolved in 2ml normal saline per kilogram body weight intraperitoneally for 7 successive days while Group C received N-acetylcy
... Show MoreThis study was carried out to measure the percentage of heavy metals pollution in the water of the Diyala river and to measure the percentage of contamination of these elements in the leafy vegetables grown on both sides of the Diyala river, which are irrigated by the contaminated river water (celery, radish, lepidium, green onions, beta vulgaris subsp, and malva). Laboratory analysis was achieved to measure the ratio of heavy element contamination (Pb, Fe, Ni, Cd, Zn and Cr) using flame atomic absorption spectrophotometer during the summer months of July and August for the year 2017. The study showed that the elements of zinc, chromium, nickel and cadmium were high concentrations and exceeded. The maximum concentration of these
... Show MoreA new method for construction ion-selective electrode (ISE) by heating reaction of methyl orange with ammonium reineckate using PVC as plasticizer for determination methyl orange and determination Amitriptyline Hydrochloried drug by formation ion-pair on electrode surface . The characteristics of the electrode and it response as following : internal solution 10-4M , pH (2.5-5) ,temperature (20-30) and response time 2 sec. Calibration response for methyl orange over the concentrationrange 10-3 -10-9 M with R=0.9989 , RSD%=0.1052, D.O.L=0.315X10-9 MEre%=(-0.877- -2.76) , Rec%.=(97.230 -101.711) .
Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Cent
... Show More