In this work the design and construction of optical pumping system was presented. The parameters of the pumping source to obtain discharge current density sufficient to shift the flash lamp spectrum towards uv portion of spectrum were measured.The current density was supplied to the flash lamp must be greater than 4000Amp./cm2 to obtain the spectral range wavelength lies between 0.2 and 0.35?m. The current density was obtained by a capacitor 50?F, at 7KV discharge voltage. The applied electrical energy to the flash lamp was more than 1200 J, and the current density was around 5000 Amp./cm2.The electrical parameters of the flash lamp were calculated. The impedance parameters(K0) from the voltage and the peak current pulse was measured in range equal to 57, while the damping factor(?) was 1.3. The energy of the flash lamp was around 75% from the input electrical energy. The external trigger circuit was limited the increase the applied voltage, which is responsible for the damping factor.
Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreTotal quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. &n
... Show MoreScenes of love constitute a large space within the orbit of the movies, so that there is almost no film (no matter what kind) void of these scenes, as they are associated with many dimensions and they constitute a major attraction for viewers, and thus the direction solutions and their connection to the director's vision constitute a large part in the process of employing signs to highlight what should be highlighted or to refer to it symbolically on the grounds that the director does not have full freedom in the transfer of scenes of love at all levels as they are in reality. The research included three sections within the theoretical framework:The first section: the concept of image and its rhetorical importance. This section discussed
... Show MoreConstruction joints serve as interruption points in the concrete placement process, which is necessary because it is often not feasible to pour concrete continuously in many structures. The quantity of concrete that can be poured at a single instance depends on the batching and mixing capacity, as well as the strength of the formwork. An effective construction joint must ensure sufficient flexural and shear continuity across the junction. Many studies investigated the construction joints in the reinforced concrete (RC) normal beams, but there are no studies investigating the effect of construction joints on the behavior of the RC deep beams. This study was prepared to show the behavio
The effect of adding different volume of coumarin dye (5, 15, 25 and 35) ml on optical properties of Poly (Methyl Meth Acrylate) was studied. Films of pure PMMA and PMMA with different volume of coumarin dye (5, 15, 25 and 35) ml were prepared using the casting technique. Transmission and absorption of the films were measured by using UV-VIS spectrometer technique type (100 Conc), in order to assess the type of transmission which was found an indirect transition. An optical energy gap of pure PMMA is (4.95e v) and after adding coumarin with volume (25, 35) ml, the energy gap for PMMA decrease by (0.05) compere to pure PMMA films and addition energy gap appear equal to (4.1 e v). It was found that the absorption coefficient, extinction coeff
... Show MoreAutomated clinical decision support system (CDSS) acts as new paradigm in medical services today. CDSSs are utilized to increment specialists (doctors) in their perplexing decision-making. Along these lines, a reasonable decision support system is built up dependent on doctors' knowledge and data mining derivation framework so as to help with the interest the board in the medical care gracefully to control the Corona Virus Disease (COVID-19) virus pandemic and, generally, to determine the class of infection and to provide a suitable protocol treatment depending on the symptoms of patient. Firstly, it needs to determine the three early symptoms of COVID-19 pandemic criteria (fever, tiredness, dry cough and breat
... Show MoreThe icon and the symbol represent the constituents of the communication process, through their intellectual and philosophical concepts that have been addressed by the current research that it has touched upon their importance in conveying the design idea for the recipient and showing the specificity of each one of them in the communication process. The research problem has been limited by the following question: what are the communication roles that the symbol and the icon present for the user in designing the industrial product?
The research objective is to reveal the theoretical visualization that describes the icon and the symbol in the industrial product and its importance in the communication process through stating the of simil