This study is to evaluate plasma levels of several cytokines in preeclamptic pregnancies compared to those of healthy pregnancies. Ninety pregnant women with preeclampsia (37 mild & 53 severe) and thirty healthy pregnant women were enrolled in the study. Blood samples were taken and plasma levels of IL-8, IL-10, and IFN-? were measured by enzyme-linked immunosorbent assay (ELISA). Preeclamptic women and their severe cases but not mild cases had significantly (P<0.05) increased levels of plasma IL-8, and IFN-? as compared with healthy pregnancies. By contrast, plasma levels of IL-10 was significantly (P<0.05) increased in healthy pregnant women as compared to all groups of preeclampsia. Preeclampsia is associated with an imbalance between pro-inflammatory cytokines (IL-8, IFN-?) and anti-inflammatory cytokines (IL-10), and these support our suggestion of altered immune response in preeclampsia.
In this experimental study, the use of stone powder as a stabilizer to the clayey soil studied. Tests of Atterberg limits, compaction, fall cone (FCT), Laboratory vane shear (LVT), and expansion index (EI) were carried out on soil-stone powder mixtures with fixed ratios of stone powder (0%, 5%, 10%, 15%, and 20%) by the dry weight. Results indicated that the undrained shear strength obtained from FCT and LVT increased at all the admixture ratios, and the expansion index reduced with the increase of the stone powder.
This paper presents stochastic analysis using the perturbation method to model the structure of a container to verify the distributions of probability of maximum and minimum axial forces reactions in piles. The proposed simulation of a container port terminal under 11 scenarios of load combinations was presented. The probability distributions for live loads are assigned according to the input parameters of simulation data. Part of the load itself is implicitly combined such as vertical live load which includes the weight of equipment and containers and wind load. The structural model was simulated in the software STAAD Pro., while the statistical analyses were performed with MATLAB. The results demonstrated that, the most significant extern
... Show MoreThe general assumption of linear variation of earth pressures with depth on retaining structures is still controversial; investigations are yet required to determine those distributions of the passive earth pressure (PEP) accurately and deduce the corresponding centroid location. In particular, for rigid retaining walls, the calculation of PEP is strongly dependent on the type of wall movement. This paper presents a numerical analysis for studying the influence of wall movement on the PEP distribution on a rigid retaining wall and the passive earth thrust location. The numerical predictions are remarkably similar to existing experimental works as recorded on scaled test models and ful
Water pollution is one of the global challenges that the society must address in the 21st century aiming to improve the water quality, reduce human pollutants and ecosystem health impacts. In phytotoxicity test, the plant of Iresine herbstii was exposed to remove nickel from simulated wastewater using two different ratios (mass of plant to the mass of nickel) (,Rp/Ni) for 21 days with sub-surface batch system. During the exposure period, the removal of Ni concentrations (2, 5 and 10 mg/L) for two mass ratio (2,800 and 34,000) were (83.6%, 77.2%, 78.0%) and (86.8%, 97% and 95.6%), respectively. final result of the rate was found that the highest removal occurred, 97%, at a mass ratio of 34,000 and
... Show MoreThis research was based on two pillars. The first is a comparison between of research done and the result of a particular variable of research indebendently in the united state, and second, knowledge and determine the effect of managers practices on the contributions of personnel. The manager and staff are considered to be the most important elements in the organization and all of them have a duty towards the others which governed by the relationship rules of procedure of the ministry researched, on the one hand and the interests of the organization and hence employees , whether executives or employees within management formations that the availability of an acceptable level of good pract
... Show MoreA program in Visual Basic language was designed to calculate the time interval of radio storm by predict their type at specific Local Time (LT) from Baghdad location, such storms result from the Central Meridian Longitude (CML) of system ΙΙΙ for Jupiter and phase of Io’s satellite (ФIo). These storms are related to position of Io (Io- A,B,C,D). The input parameters for this program were the observer’s location (longitude), year, month and day. The output program results in form of tables provide the observer information about the date and the LT of beginning and end of each type of emitted storm. The year 2011 was taken to apply the results within twelve month; the results of the time interval of radio storm were between (0.08h-5
... Show More An experimental and computational study is conducted to analyze the thermal performance of heat sinks and to pick up more profound information in this imperative field in the electronic cooling. One important approach to improve the heat transfer on the air-side of the heat exchanger is to adjust the fin geometry. Experiments are conducted to explore the impact of the changing of diverse operational and geometrical parameters on the heat sink thermal
performance. The working fluid used is air. Operational parameters includes: air Reynolds number (from 23597 to 3848.9) and heat flux (from 3954 to 38357 W/m
2 ). Conformational parameters includes: change the direction of air flow and the area of conduct
This paper deals with prediction the effect of soil remoulding (smear) on the ultimate bearing capacity of driven piles. The proposed method based on detecting the decrease in ultimate bearing capacity of the pile shaft (excluding the share of pile tip) after sliding downward. This was done via conducting an experimental study on three installed R.C piles in a sandy clayey silt soil. The piles were installed so that a gap space is left between its tip and the base of borehole. The piles were tested for ultimate bearing capacity
according to ASTM D1143 in three stages. Between each two stages the pile was jacked inside the borehole until a sliding of about 200mm is achieved to simulate the soil remoulding due to actual pile driving. T