Preferred Language
Articles
/
bhbxBIcBVTCNdQwC_C1O
Photovoltaic system DC series arc fault: a case study
...Show More Authors

<p>Photovoltaic (PV) systems are becoming increasingly popular; however, arc faults on the direct current (DC) side are becoming more widespread as a result of the effects of aging as well as the trend toward higher DC voltage levels, posing severe risk to human safety and system stability. The parallel arc faults present higher level of current as compared with the series arc faults, making it more difficult to spot the series arc. In this paper and for the aim of condition monitoring, the features of a DC series arc fault are analyzed by analysing the arc features, performing model’s simulation in PSCAD, and carrying out experimental studies. Various arc models are simulated and investigated; for low current arcs, the heuristic model is used where a set of parameters established. Moreover, the heuristic model’s simulated arc has been shown to be compatible with the experimental data. The features of arc noise in the electrode separation region and steady-arcing states with varied gap widths are investigated. It has been discovered that after an arc fault occurs, arc noise increases, notably in the frequency range below 50 kHz; where this property is useful for detecting DC series arc faults. Besides that, variations in air gap width are more sensitive to frequencies under 5 kHz.</p>

Scopus Crossref
View Publication
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Simulation and Experimental Investigation of Performance and Flow Behavior for Steam Ejector Refrigeration System
...Show More Authors

The ejector refrigeration system is a desirable choice to reduce energy consumption. A Computational Fluid Dynamics CFD simulation using the ANSYS package was performed to investigate the flow inside the ejector and determine the performance of a small-scale steam ejector. The experimental results showed that at the nozzle throat diameter of 2.6 mm and the evaporator temperature of 10oC, increasing boiler temperature from 110oC to 140oC decreases the entrainment ratio by 66.25%. At the boiler temperature of 120oC, increasing the evaporator temperature from 7.5 to 15 oC increases the entrainment ratio by 65.57%. While at the boiler temperature of 120oC and

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Fme Transactions
FAT-based adaptive backstepping control of an electromechanical system with an unknown input coefficient
...Show More Authors

This paper is focused on orthogonal function approximation technique FAT-based adaptive backstepping control of a geared DC motor coupled with a rotational mechanical component. It is assumed that all parameters of the actuator are unknown including the torque-current constant (i.e., unknown input coefficient) and hence a control system with three motor control modes is proposed: 1) motor torque control mode, 2) motor current control mode, and 3) motor voltage control mode. The proposed control algorithm is a powerful tool to control a dynamic system with an unknown input coefficient. Each uncertain parameter/term is represented by a linear combination of weighting and orthogonal basis function vectors. Chebyshev polynomial is used

... Show More
View Publication
Scopus (6)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
apply Six Sigma in improving the quality of projects added expert system )Applied research(
...Show More Authors

Construction projects need methods and techniques to ensure the level of quality and commensurate with the level required and documented in the project contract. The quality of the project is affected by the quality of the inputs and accompanying procedures in the construction of the project.

Al-Rumaitha residential project found that the quality of the concrete for the ceilings in the research sample (the roof of the third floor of buildings A25 and A26) and (roof of the second floor of buildings A27, A28, A29, A30, A31, A32 and A33) and roof of buildings A15 and A16 A19)) is not the required quality level.

The idea of the research came after the need to improve the performance o

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Dec 06 2018
Journal Name
Iraqi Journal Of Pharmaceutical Sciences ( P-issn 1683 - 3597 E-issn 2521 - 3512)
Formulation and Characterization of Bromocriptine Mesylate as Liquid Self-Nano Emulsifying Drug Delivery System
...Show More Authors

Bromocriptine mesylate is a semisynthetic ergot alkaloid derivative with potent dopaminergic activity, used in the treatment of pituitary tumors, Parkinson's disease (PD), hyperprolactinaemia, neuroleptic malignant syndrome, and type 2 diabetes ,the oral bioavailability is  approximately 6%, therefore aim  its  prepare and evaluate bromocriptine mesylate  as liquid self nano emulsifying drug delivery system to enhance its solubility , dissolution and stability . Solubility study was made in different vehicles to select the best excipients for dissolving bromocriptine mesylate. Pseudo-ternary phase diagrams were constructed at 1:1, 2:1, 3:1 and 4:1 ratios of surfactant and co-surfactant, four formulations were pre

... Show More
View Publication Preview PDF
Scopus (19)
Crossref (10)
Scopus Crossref
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Critical Success factors of Strategic Information system and it's relation with Strategic Decisions Effectiveness
...Show More Authors

The organization uses many techniques and methods to ensure that they will succeed and adapted with velocity change in the internal and external environment by decision taking, especially strategic decisions.

Strategic decisions are very important for organization success because it can predict the future and deal with uncertainty, in this circumstances they need accurate and comprehensive information to make effective strategic decision.

To achieve that purpose it must owned successful Strategic Information System ( SIS ) and determined the critical success factors for this system ,which can assisted the worker to focus on the important activities to develop it.

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Global NAVIGATION Satellite System Contribution for Observing the Tectonic Plate Movements: Status and Perspectives
...Show More Authors

The long-term monitoring of land movements represents the most successful application of the Global Navigation Satellite System (GNSS), particularly the Global Positioning System. However, the application of long term monitoring of land movements depends on the availability of homogenous and consistent daily position time series of stations over a period of time. Such time series can be produced very efficiently by using Precise Point Positioning and Double Difference techniques based on particular sophisticated GNSS processing softwares. Nonetheless, these rely on the availability of GNSS products which are precise satellite orbit and clock, and Earth orientation parameters. Unfortunately, several changes and modifications have been mad

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 08 2002
Journal Name
Iraqi Journal Of Laser
Laser Detection and Tracking System Using an Array of Photodiodes with Fuzzy Logic controller
...Show More Authors

In this work laser detection and tracking system (LDTS) is designed and implemented using a fuzzy logic controller (FLC). A 5 mW He-Ne laser system and an array of nine PN photodiodes are used in the detection system. The FLC is simulated using MATLAB package and the result is stored in a lock up table to use it in the real time operation of the system. The results give a good system response in the target detection and tracking in the real time operation.

View Publication Preview PDF
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
...Show More Authors

Abstract

          The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the     life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's  management  experience is how to achieve thes

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Jan 28 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of accounting system in the recovery from the impact of financial crisis
...Show More Authors

          This study aims to identify the concepts of financial crisis and its reasons of creation , also explain the effects of the accounting disclosure and the International Accounting Standards in current financial crisis, In addition to,  indicate the role of accounting in the reform of the financial system from the impact of financial crisis.      

       The  methodology of this study orientied to two main aspects, the first is an identifying approach through exploring the opinion of financial experts, the second aspect is based on an analytical approach to satisfy the requirements  of experts to get there opi

... Show More
View Publication Preview PDF
Publication Date
Mon Dec 31 2012
Journal Name
Al-khwarizmi Engineering Journal
Field Programmable Gate Array (FPGA) Model of Intelligent Traffic Light System with Saving Power
...Show More Authors

In this paper, a FPGA model of intelligent traffic light system with power saving was built. The intelligent traffic light system consists of sensors placed on the side's ends of the intersection to sense the presence or absence of vehicles. This system reduces the waiting time when the traffic light is red, through the transition from traffic light state to the other state, when the first state spends a lot of time, because there are no more vehicles. The proposed system is built using VHDL, simulated using Xilinx ISE 9.2i package, and implemented using Spartan-3A XC3S700A FPGA kit. Implementation and Simulation behavioral model results show that the proposed intelligent traffic light system model satisfies the specified operational req

... Show More
View Publication Preview PDF