A compact microstrip six-port reflectometer (SPR) with extended bandwidth is proposed in this paper. The design is based on using 16-dB multi-section coupled line directional couplers and a multi-section 3-dB Wilkinson power divider operating from 1 to 6 GHz. The proposed SPR employs only two calibration standards: a matched load and an open load. As compared to other dielectric substrates, fabricating the proposed SPR involves using a low-cost (FR4) substrate. A novel algorithm is also proposed to estimate the complex reflection coefficient over the frequency ranges at which the standard performance of the circuit components is not fully satisfied. The new algorithm is based on the circles’ intersection points, which have been derived from basic SPR equations, to estimate the complex reflection coefficient. To validate the SPR performance, a multiband microstrip patch antenna has been measured and the resulted reflection coefficient is compared with those obtained using a vector network analyzer (VNA). Results show that the proposed SPR provides a good estimation of the complex reflection coefficient within the frequency range of 1 GHz to 8 GHz. Owing to its compact size and ease of fabrication, the proposed reflectometer is suitable for various microwave broadband applications.
مع ان افلاطون في الفصلين السابع والعاشر من جمهوريته يعري المسرح بوصفه عالما زائفا يعج بالأخيلة التي يتوجب على المرء ان ينبذها ويتمسك بعالم الحقيقة، الا إن هذا لا يعدم الأثر البالغ الذي تركتهُ أرائهُ على المسرح، قديمهُ وحديثهُ،تجربهً وتنظيرا .إن حكايته الإستعارية للكهف ،والتي تعد مسرحةً للأفكارِ، إن هي إلا وسيلة ينفذ من خلالها الى جوهر المسرح. لذا فان مسرحية ونظرية الكهف قد اصبحت حجر الزاوية في ما قد اص
... Show MoreConstruction projects need methods and techniques to ensure the level of quality and commensurate with the level required and documented in the project contract. The quality of the project is affected by the quality of the inputs and accompanying procedures in the construction of the project.
Al-Rumaitha residential project found that the quality of the concrete for the ceilings in the research sample (the roof of the third floor of buildings A25 and A26) and (roof of the second floor of buildings A27, A28, A29, A30, A31, A32 and A33) and roof of buildings A15 and A16 A19)) is not the required quality level.
The idea of the research came after the need to improve the performance o
... Show MoreThe problem of the research came through the following question (what is the effectiveness of active design in contemporary industrial products), and it emphasized the importance of research to make society with its members in a positive state of activity, and what can help the industrial product design to achieve this, but the goal of the study is (determining the characteristics and principles of design Active and its effectiveness in the industrial product), and the study was determined by industrial products related to daily, recreational and sports activity, The researcher relied on a form to determine the axes of analysis for the sample models, in order to reach the results of the research, the most important of which are: Realiz
... Show MoreActive worms have posed a major security threat to the Internet, and many research efforts have focused on them. This paper is interested in internet worm that spreads via TCP, which accounts for the majority of internet traffic. It presents an approach that use a hybrid solution between two detection algorithms: behavior base detection and signature base detection to have the features of each of them. The aim of this study is to have a good solution of detecting worm and stealthy worm with the feature of the speed. This proposal was designed in distributed collaborative scheme based on the small-world network model to effectively improve the system performance.
This research presents a model for surveying networks configuration which is designed and called a Computerized Integrated System for Triangulation Network Modeling (CISTNM). It focuses on the strength of figure as a concept then on estimating the relative error (RE) for the computed side (base line) triangulation element. The CISTNM can compute the maximum elevations of the highest
obstacles of the line of sight, the observational signal tower height, the contribution of each triangulation station with their intervisibility test and analysis. The model is characterized by the flexibility to select either a single figure or a combined figures network option. Each option includes three other implicit options such as: triangles, quadri
In light of increasing demand for energy consumption due to life complexity and its requirements, which reflected on architecture in type and size, Environmental challenges have emerged in the need to reduce emissions and power consumption within the construction sector. Which urged designers to improve the environmental performance of buildings by adopting new design approaches, Invest digital technology to facilitate design decision-making, in short time, effort and cost. Which doesn’t stop at the limits of acceptable efficiency, but extends to the level of (the highest performance), which doesn’t provide by traditional approaches that adopted by researchers and local institutions in their studies and architectural practices, limit
... Show MoreThis paper deals with a Twin Rotor Aerodynamic System (TRAS). It is a Multi-Input Multi-Output (MIMO) system with high crosscoupling between its two channels. It proposes a hybrid design procedure that combines frequency response and root locus approaches. The proposed controller is designated as PID-Lead Compensator (PIDLC); the PID controller was designed in previous work using frequency response design specifications, while the lead compensator is proposed in this paper and is designed using the root locus method. A general explicit formula for angle computations in any of the four quadrants is also given. The lead compensator is designed by shifting the dominant closed-loop poles slightly to the left in the s-plane. This has the effect
... Show More