Evaluation of the Main Causes of Diesel Engine Injector Failure using Fault Tree Analysis
...Show More Authors

The maintenance of the diesel engine parts in any electric power station contains many problems that lead to stopping. Several reasons lead to such problems; these reasons should be analyzed and evaluated in order to eliminate their effects. This paper is based on evaluation of the main causes that lead to diesel engine injector failure as a main part of electric power stations, using fault tree analysis (FTA). The FTA is the most broadly utilized strategies in the industrial area to perform reliability analysis of complex designing frameworks. A fault tree is a logical representation of the relationship of basic events that lead to a given unwanted event (i.e., top event).

Starting with introducing the FTA and how it could be utilized in analyzing the reasons of main issues that lead to that the injector stops working, in which the probability of occurrence of each issue is calculated. The application of the root cause analysis principle of diesel engine injector failure in diesels Haditha station is chosen as a case under study. According to the probabilities’ evaluation by using the FTA based on of the causes under the top event its value was (0.80). It is concluded from the analysis that the three largest values of the occurrence of a problem with the diesel engine injector are 0.50 for fuel problems, 0.20 for overloads, and 0.18 for nozzle head corrosion. Plant management can define a specific plan with taking into consideration the calculated value of each cause in order to reduce their impacts and to avoid long downtime hours compared to operating hours. Finally, recommandations are suggested to overcome these causes.

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP
...Show More Authors

Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering.  Elemental estimation, which in the early stage, estimates the construction costs depending on  . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Baghdad Science Journal
Study the Quality of Nasopharyngeal plans Using Evaluation Indexes of IMRT and VMAT Treatment planning Techniques
...Show More Authors

Radiation treatment has long been the conventional approach for treating nasopharyngeal cancer (NPC) tumors due to its anatomic features, biological characteristics, and radiosensitivity. The most common treatment for nasopharyngeal carcinoma is radiotherapy. This study aimed to assess the better quality of radiotherapy treatment techniques using intensity-modulated radiotherapy (IMRT) and volumetric-modulated arc therapy (VMAT). The VMAT and IMRT are comparative techniques. Forty patients with nasopharyngeal carcinoma and forwarded for radiotherapy were treated with both advanced techniques, IMRT and VMAT, using eclipse software from Varian. The x-ray energy was set at 6 MV. The total prescribed dose was 70 Gy. The results show that the

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Sat Mar 01 2014
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Strategic Performance Evaluation Using Benchmarking Technique: Applied Research In The Sample Of Offices Of Inspectors General
...Show More Authors

In light of the rapid changes in the business environment and the entry of administrative leaders in the challenges of the atheist and twenty- increasing competition between sectors and the desire to acquire the skills, the traditional methods are no longer viable, which requires doing evaluates performance according to a more holistic, rather than limiting the performance evaluation on the financial hub that has not longer enough alone, as well as benchmarking method that has proven successful in developed countries as a way to develop and improve products and services.

I've touched your search to the development of indicators evaluating the performance and preparation of a mechanism for making comparisons of reference between o

... Show More
View Publication Preview PDF
Publication Date
Sun Dec 27 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation the profitability of public commercial banks using liquidity indicators: A comparison of the Rafidain and Rasheed study
...Show More Authors

The issue of liquidity, profitability, and money employment, and capital fullness is one of the most important issues that gained high consideration by other authors and researchers in their attempts to find out the real relationship and how can balance be achieved, which is the main goal of each deposits.

For the sake of comprising the study variables, the research has formed the problem of the study which refers to the bank capability to enlarge profits without dissipation in liquidity   of the bank which will negatively reflect on the bank's fame as well as the customers' trust. For all these matters, the researcher has proposed a set of aims, the important of which is the estimation of the bank profitability; liquid

... Show More
View Publication Preview PDF
Publication Date
Fri Dec 01 2017
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Integration between value chain analysis and balanced scorecard to for performance evaluation
...Show More Authors

The performance evaluation process requires a set of criteria and for the purpose of measuring the level of performance achieved by the Unit and the actual level of development of its activities, and in view of the changes and of rapid and continuous variables surrounding the Performance is a reflection of the unit's ability to achieve its objectives, as these units are designed to achieve the objectives of exploiting a range of economic resources available to it, and the performance evaluation process is a form of censorship, focusing on the analysis of the results obtained from the achievement All its activities with a view to determining the extent to which the Unit has achieved its objectives using the resources available to it and h

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Tue Jun 01 2010
Journal Name
Al-khwarizmi Engineering Journal
Study of NOx Emissions of S.I. Engine Fueled with Different Kinds of Hydrocarbon Fuels and Hydrogen
...Show More Authors

 

      Liquefied petroleum gas (LPG), Natural gas (NG) and hydrogen were used to operate spark ignition internal combustion engine Ricardo E6, to compare NOx emissions emitted from the engine, with that emitted from engine fueled with gasoline as a fuel.

      The study was done when engine operated at HUCR for gasoline, compared with its operation at HUCR for each fuel. Compression ratio, equivalence ratio and spark timing were studied at constant speed 25rps.

The results appeared that NOx concentrations will be at maximum value in the lean side near the stoichiometric ratio, and reduced with moving away from this ratio for mixture at both s

... Show More
View Publication Preview PDF
Publication Date
Tue Oct 23 2018
Journal Name
Journal Of Economics And Administrative Sciences
Processing of missing values in survey data using Principal Component Analysis and probabilistic Principal Component Analysis methods
...Show More Authors

The idea of ​​carrying out research on incomplete data came from the circumstances of our dear country and the horrors of war, which resulted in the missing of many important data and in all aspects of economic, natural, health, scientific life, etc.,. The reasons for the missing are different, including what is outside the will of the concerned or be the will of the concerned, which is planned for that because of the cost or risk or because of the lack of possibilities for inspection. The missing data in this study were processed using Principal Component  Analysis and self-organizing map methods using simulation. The variables of child health and variables affecting children's health were taken into account: breastfeed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed May 01 2019
Journal Name
Ieee International Electric Machines & Drives Conference (iemdc)
An Investigation of Short Translator Linear Machines for Use in a Free Piston Engine
...Show More Authors

Scopus (7)
Crossref (7)
Scopus Crossref
Publication Date
Thu Jul 21 2022
Journal Name
Energies
Dynamic Characteristics and Demonstration of an Integrated Linear Engine Generator with Alternative Electrical Machines
...Show More Authors

A linear engine generator with a compact double-acting free piston mechanism allows for full integration of the combustion engine and generator, which provides an alternative chemical-to-electrical energy converter with a higher volumetric power density for the electrification of automobiles, trains, and ships. This paper aims to analyse the performance of the integrated engine with alternative permanent magnet linear tubular electrical machine topologies using a coupled dynamic model in Siemens Simcenter software. Two types of alternative generator configurations are compared, namely long translator-short stator and short translator-long stator linear machines. The dynamic models of the linear engine and linear generator, validated

... Show More
View Publication Preview PDF
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2011
Journal Name
Journal Of Engineering
CONSTRUCTION DELAY ANALYSIS USING DAILY WINDOWS TECHNIQUE
...Show More Authors

Delays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious
issue. Several delay analysis methods are available but no one method can be universally used over another in
all situations. The selection of the proper analysis method depends upon a variety of factors including
information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. This paper presents computerized schedule analysis programmed that use daily windows analysis method as it recognized one of the most credible methods, and it is one of the few techniques much more likely to be accepted by courts than any other method. A simple case study has been implement

... Show More
View Publication Preview PDF
Crossref (2)
Crossref