Companies compete greatly with each other today, so they need to focus on innovation to develop their products and make them competitive. Lean product development is the ideal way to develop product, foster innovation, maximize value, and reduce time. Set-Based Concurrent Engineering (SBCE) is an approved lean product improvement mechanism that builds on the creation of a number of alternative designs at the subsystem level. These designs are simultaneously improved and tested, and the weaker choices are removed gradually until the optimum solution is reached finally. SBCE implementations have been extensively performed in the automotive industry and there are a few case studies in the aerospace industry. This research describe the use of trade-off curve as a lean tool to support SBCE process model in CONGA project, using NASA simulation software version 1.7c and CONGA demonstration program (DEMO program) to help designers and engineers to extract the design solution where it exists according to the customer requirement and to extract alternative nearest solutions from the previous project that meet customer requirement to achieve low noise engine at an aerospace company and also extract the infeasible region where the designers cannot make any prototype in this region before manufacturing process begin, that will lead to reducing rework, time and cost.
This paper aims at the fact that most organizations today suffer from a waste of time, effort, and cost, and they have difficulty in achieving the best performance situations and compete strongly. The researcher distributed 108 questionnaires as a statistical analyzable sample society where the sample intentionally consists of general managers, department head, and division head. The questionnaire was formulated according to the Likert scale. The use of personal interviews and observations are additional tools for data collection and a number of statistical methods is used for data analysis such as simple regression and correlation coefficient (Pearson). One of the most prominent conclusions is that the company has adequate and c
... Show MoreDarcy-Weisbach (D-W) is a typical resistance equation in pressured flow; however, some academics and engineers prefer Hazen-Williams (H-W) for assessing water distribution networks. The main difference is that the (D-W) friction factor changes with the Reynolds number, while the (H-W) coefficient is a constant value for a certain material. This study uses WaterGEMS CONNECT Edition update 1 to find an empirical relation between the (H-W) and (H-W) equations for two 400 mm and 500 mm pipe systems. The hydraulic model was done, and two scenarios were applied by changing the (H-W) coefficient to show the difference in results of head loss. The results showed a strong relationship between both equations with correlation coefficients of 0.999,
... Show MoreBACKGROUND: Mental health problems are reflected and linked to human behavior in many aspects. Medical students are susceptible to a wide variety of events that compromise their mental well-being, social life as well as their academic achievements. AIM: This study aimed to find the impact of social support on medical students’ behavior in Iraq via assessing their depression, anxiety, and stress status. METHODS: A cross-sectional online survey-based study targeted all medical students in Iraq. The employed questionnaires covered mental health status of participants by evaluating their perceptions of depression, anxiety, and stress using. Data were analyzed using the Statistical Analysis System. RESULTS: The study revealed a signifi
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
Land Transport regards a main element in the In Fra – structure of the national economy where distance and time shortness, open new opportunities of work, develop the different regions and rise the standard of living….
It is necessary to emphasize that the circumastances surrounding Iraq such as wars, economic sanctions, blockade occupation effected negatively upon economic Indicators of land Transportion including Value of output Value added contraction of Investment allocation and Investment expend tuer and the period of implementation and fulfillment of the projects of Land Transport to be ready to offer their service in underdeveloped country Like Iraq aiming to satisfy Fast and acomprehensi
... Show MoreThe research aims to identify the importance of using the style of the cost on the basis of activity -oriented in time TDABC and its role in determining the cost of products more equitably and thus its impact on the policy of allocation of resources through the reverse of the changes that occur on an ongoing basis in the specification of the products and thus the change in the nature and type of operations . The research was conducted at the General Company for Textile Industries Wasit / knitting socks factory was based on research into the hypothesis main of that ( possible to calculate the cost of activities that cause the production through the time it takes to run these activities can then be re- distributed product cost
... Show MoreIn this paper, the system of the power plant has been investigated as a special type of industrial systems, which has a significant role in improving societies since the electrical energy has entered all kinds of industries, and it is considered as the artery of modern life.
The aim of this research is to construct a programming system, which could be used to identify the most important failure modes that are occur in a steam type of power plants. Also the effects and reasons of each failure mode could be analyzed through the usage of this programming system reaching to the basic events (main reasons) that causing each failure mode. The construction of this system for FMEA is dependi
... Show MoreIn this paper, the speed control of the real DC motor is experimentally investigated using nonlinear PID neural network controller. As a simple and fast tuning algorithm, two optimization techniques are used; trial and error method and particle swarm optimization PSO algorithm in order to tune the nonlinear PID neural controller's parameters and to find best speed response of the DC motor. To save time in the real system, a Matlab simulation package is used to carry out these algorithms to tune and find the best values of the nonlinear PID parameters. Then these parameters are used in the designed real time nonlinear PID controller system based on LabVIEW package. Simulation and experimental results are compared with each other and showe
... Show More