Preferred Language
Articles
/
alkej-593
Feature - Based Approach to Automatic Fixturing System Planning For Uniform Polyhedra Workpiece

This paper demonstrates the design of an algorithm to represent the design stages of fixturing system that serve in increasing the flexibility and automation of fixturing system planning for uniform polyhedral part. This system requires building a manufacturing feature recognition algorithm to present or describe inputs such as (configuration of workpiece) and built database system to represents (production plan and fixturing system exiting) to this algorithm. Also knowledge – base system was building or developed to find the best fixturing analysis (workpiece setup, constraints of workpiece and arrangement the contact on this workpiece) to workpiece.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Project Planning & Scheduling: بحث تطبيقي لمشاريع / مديرية الابنية المدرسية /دائرة المشاريع /مشروعالوزارةرقم (1)

Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholder needs , However, there is increasing concern about whether know-how effectively improves  understanding of underlying theories of project management processes for construction organizations and their project managers  Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance , but many worldwide construction projects appear to give insufficient attention to effective management and definition of  project  planning, including pre planning stages . Indeed, some planning issues indeed, some planning issues have been completely ove

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jul 09 2022
Journal Name
Wireless Communications And Mobile Computing
An Optimized Approach for Industrial IoT Based on Edge Computing

The Internet of Things (IoT) is an information network that connects gadgets and sensors to allow new autonomous tasks. The Industrial Internet of Things (IIoT) refers to the integration of IoT with industrial applications. Some vital infrastructures, such as water delivery networks, use IIoT. The scattered topology of IIoT and resource limits of edge computing provide new difficulties to traditional data storage, transport, and security protection with the rapid expansion of the IIoT. In this paper, a recovery mechanism to recover the edge network failure is proposed by considering repair cost and computational demands. The NP-hard problem was divided into interdependent major and minor problems that could be solved in polynomial t

... Show More
View Publication
Scopus (2)
Scopus Clarivate Crossref
Publication Date
Fri Apr 01 2011
Journal Name
Al-mustansiriyah Journal Of Science
A Genetic Algorithm Based Approach For Generating Unit Maintenance Scheduling

Publication Date
Fri May 31 2019
Journal Name
Journal Of Engineering
A Comparative Study of Various Intelligent Algorithms based Path Planning for Mobile Robots

In general, path-planning problem is one of most important task in the field of robotics. This paper describes the path-planning problem of mobile robot based on various metaheuristic algorithms. The suitable collision free path of a robot must satisfies certain optimization criteria such as feasibility, minimum path length, safety and smoothness and so on. In this research, various three approaches namely, PSO, Firefly and proposed hybrid FFCPSO are applied in static, known environment to solve the global path-planning problem in three cases. The first case used single mobile robot, the second case used three independent mobile robots and the third case applied three follow up mobile robot.  Simulation results, whi

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Wed Apr 20 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Text image secret sharing with hiding based on color feature

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Sat Oct 31 2020
Journal Name
International Journal Of Intelligent Engineering And Systems
Automatic Computer Aided Diagnostic for COVID-19 Based on Chest X-Ray Image and Particle Swarm Intelligence

View Publication
Scopus (23)
Crossref (5)
Scopus Crossref
Publication Date
Fri Mar 01 2019
Journal Name
Al-khwarizmi Engineering Journal
Design and Implementation of a Telemetry System for Environmental Applications

The Environmental Data Acquisition Telemetry System is a versatile, flexible and economical means to accumulate data from multiple sensors at remote locations over an extended period of time; the data is normally transferred to the final destination and saved for further analysis.

This paper introduces the design and implementation of a simplified, economical and practical telemetry system to collect and transfer the environmental parameters (humidity, temperature, pressure etc.) from a remote location (Rural Area) to the processing and displaying unit.

To get a flexible and practical system, three data transfer methods (three systems) were proposed (including the design and implementation) for rural area services, the fi

... Show More
View Publication Preview PDF
Publication Date
Wed Mar 01 2017
Journal Name
2017 Annual Conference On New Trends In Information & Communications Technology Applications (ntict)
Automatic Iraqi license plate recognition system using back propagation neural network (BPNN)

View Publication
Scopus (9)
Crossref (7)
Scopus Crossref
Publication Date
Mon Dec 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Material Requirements Planning (MRP) for Electric Geyser Product by Using Goal Programming\ applicative research in the general company of electrical industrialization

Material Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.

The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products and\or purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Ieee Access
Fuzzy-Based Ensemble Feature Selection for Automated Estimation of Speaker Height and Age Using Vocal Characteristics

View Publication
Scopus Clarivate Crossref