The primary objective of this study was to identify the mechanisms for the development and propagation of longitudinal cracks that initiate at the surface of composite pavement. In this study the finite element program ANSYS version (5.4) was used and the model worked out using this program has the ability to analyze a composite pavement structure of different layer properties. Also, the aim of this study was modeling and analyzing of the composite pavement structure with the physical presence of crack induced in concrete underlying layer. The results obtained indicates that increasing the thickness of the asphalt layer tends to decrease the stress intensity factor, which may be attributed to the rapidly decrease of horizontal tensile stress in the asphalt layer. The cracks initiate at the surface due to high vertical stress and shear stress from wheel loads tends to propagate downward due tensile stress generated at the bottom of the asphalt layer or near crack tip, and the whole process occur at the same location of the existing cracks in underlying concrete layer rather than travel up from existing crack. As the load position varies from the crack zone, this result in tensile stresses or tension at the crack tip, leading to increase the stress intensity factor and intern result in crack propagation further into the depth of the pavement.
Topology and its applications occupy the interest of many researching centers in the advanced world. From this point of view and because the near open sets play a very important role in general topology and they are now the research topics of many topologists worldwide and its sets doesn’t enter in fibrewise topology yet. Therefore, we use some of the near open sets to be model for introduce results and new spaces in fibrewise topological spaces. Also, there is a very important role of closure operators in constructing a topological spaces, so we introduce a new closure operators on the power set of vertices on graphs and conclusion theorems and new spaces from it. Furthermore, we discuss the relationships of connectedness between some ty
... Show MoreIntelligent or smart completion wells vary from conventional wells. They have downhole flow control devices like Inflow Control Devices (ICD) and Interval Control Valves (ICV) to enhance reservoir management and control, optimizing hydrocarbon output and recovery. However, to explain their adoption and increase their economic return, a high level of justification is necessary. Smart horizontal wells also necessitate optimizing the number of valves, nozzles, and compartment length. A three-dimensional geological model of the As reservoir in AG oil field was used to see the influence of these factors on cumulative oil production and NPV. After creating the dynamic model for the As reservoir using the program Petrel (2017.4), we
... Show MoreThe objective of this study was to assess the nutritional status of childs of nurseries in Baghdad city so that an early detection of malnutrition cases could be carried out. The results revealed that the daily consumption of food calories, protein, fat and carbohydrate were 1180.5 calories, 27.2gm, 38gm and 180gm, respectively, which were less than the RDA values and the percentages of these nutrients supplied by the food intake were 90.8, 83.7, 87.3 and 90.3%, respectively. It was also demonstrated that the highest percentages of stunting, underweight and wasting, which amounted to 32, 22.7 and 1.5%, respectively, were among those childs who obtained inadequate calories, while the percentages of the forementioned malnutrition cases amon
... Show MoreMany problems were encountered during the drilling operations in Zubair oilfield. Stuckpipe, wellbore instability, breakouts and washouts, which increased the critical limits problems, were observed in many wells in this field, therefore an extra non-productive time added to the total drilling time, which will lead to an extra cost spent. A 1D Mechanical Earth Model (1D MEM) was built to suggest many solutions to such types of problems. An overpressured zone is noticed and an alternative mud weigh window is predicted depending on the results of the 1D MEM. Results of this study are diagnosed and wellbore instability problems are predicted in an efficient way using the 1D MEM. Suitable alternative solutions are presented
... Show MoreThe research focuses on determination of best location of high elevated tank using the required head of pump as a measure for this purpose. Five types of network were used to find the effect of the variation in the discharge and the node elevation on the best location. The most weakness point was determined for each network. Preliminary tank locations were chosen for test along the primary pipe with same interval distance. For each location, the water elevation in tank and pump head was calculated at each hour depending on the pump head that required to achieve the minimum pressure at the most weakness point. Then, the sum of pump heads through the day was determined. The results proved that there is a most economical lo
... Show MoreThe political situation experienced by Iraq before the events of 2003 that led to the collapse of infrastructure. rebuilding costs were estimated after 2003 by187(million USD) according to the estimates of the basic needs as stated in Five-Year Plan 2010-2014. The difficult in financing projects and the continuous demands for maintenance and operating cost, and working by contemporary styles in different countries, the strategic option is to adopt the government entering the private sector as a partner in the development process. Since public _private partnership (PPP's) is at a germinating stage of development in Iraq, it has been studied the critical success factors(CSF's) in the experiences of countries that have implemented the style
... Show More