Multi-point forming (MPF) is an advanced flexible manufacture technology, and the technology results from the idea that the whole die is separated into small punches that can be adjusted height. This idea is applied to the traditional rigid blank-holder, so flexible blank-holder (FBH) idea can be obtained. In this work, the performance of a multi-point die is investigated with pins in square matrix and suitable blank holder. Each pin in the punch holder can be a significant moved according to the die high and at different load that applied with spring with respect to spring stiffness. The results shows the reduction in setting time with respect to traditional single point incremental forming process that lead to (90%). and also show during the forming process, the deformation of the interpolator can induce a shape error in the formed work-piece and the blank holder can reduce/eliminate dimples that sometimes arise in the work-piece. The minimum force applied using multi-point die is 28.556KN, while the load when complete the forming process is 30.8KN that caused displacement of die to 32.8mm.
Optical Mark Recognition (OMR) is the technology of electronically extracting intended data from marked fields, such as squareand bubbles fields, on printed forms. OMR technology is particularly useful for applications in which large numbers of hand-filled forms need to be processed quickly and with a great degree of accuracy. The technique is particularly popular with schools and universities for the reading in of multiple choice exam papers. This paper proposed OMRbased on Modify Multi-Connect Architecture (MMCA) associative memory, its work in two phases: training phase and recognition phase. The proposed method was also able to detect more than one or no selected choice. Among 800 test samples with 8 types of grid answer sheets and tota
... Show MoreThis paper proposed a new method for network self-fault management (NSFM) based on two technologies: intelligent agent to automate fault management tasks, and Windows Management Instrumentations (WMI) to identify the fault faster when resources are independent (different type of devices). The proposed network self-fault management reduced the load of network traffic by reducing the request and response between the server and client, which achieves less downtime for each node in state of fault occurring in the client. The performance of the proposed system is measured by three measures: efficiency, availability, and reliability. A high efficiency average is obtained depending on the faults occurred in the system which reaches to
... Show MoreBackground: Immediate postpartum contraceptive and post abortion contraception methods are effective safe methods and are becoming a standard practice in many countries, yet it is not widely used in Iraq.
Aims: this study: is designed to assess the attitude and willingness of women to immediate contraception after giving birth or abortion and their satisfaction to previous use.
Methods and Material: Four hundred thirty-four women were surveyed in the labor word immediately after giving birth/ abortion. Their knowledge, attitude and contraception use were assessed according to the response they reported to a given questionnaire.
Results: women were not sure abo
... Show MoreThe emphasis of Master Production Scheduling (MPS) or tactic planning is on time and spatial disintegration of the cumulative planning targets and forecasts, along with the provision and forecast of the required resources. This procedure eventually becomes considerably difficult and slow as the number of resources, products and periods considered increases. A number of studies have been carried out to understand these impediments and formulate algorithms to optimise the production planning problem, or more specifically the master production scheduling (MPS) problem. These algorithms include an Evolutionary Algorithm called Genetic Algorithm, a Swarm Intelligence methodology called Gravitational Search Algorithm (GSA), Bat Algorithm (BAT), T
... Show MoreThe study objectives were to (1) describe the characteristics of the pharmacy professionals and (2) explore the association between job satisfaction and factors, such as work control, work stress, workload and organization and professional commitments.
This study was a cross-sectional design. The survey items were mainly adapted from the US National Pharmacist Workforce Survey. An electronic (Qualtrics) questionnaire was posted on pharmacist social media in several A
In this research, the multi-period probabilistic inventory model will be applied to the stores of raw materials used in the leather industry at the General Company for Leather Industries. The raw materials are:Natural leather includes cowhide, whether imported or local, buffalo leather, lamb leather, goat skin, chamois (raw materials made from natural leather), polished leather (raw materials made from natural leather), artificial leather (skai), supplements which include: (cuffs - Clocks - hands - pockets), and threads.This model was built after testing and determining the distribution of demand during the supply period (waiting period) for each material and completely independently from the rest of the materials, as none of the above mate
... Show MoreOptimizing the Access Point (AP) deployment is of great importance in wireless applications owing the requirement to provide efficient and cost-effective communication. Highly targeted by many researchers and academic industries, Quality of Service (QOS) is an important primary parameter and objective in mind along with AP placement and overall publishing cost. This study proposes and investigates a multi-level optimization algorithm based on Binary Particle Swarm Optimization (BPSO). It aims to an optimal multi-floor AP placement with effective coverage that makes it more capable of supporting QOS and cost effectiveness. Five pairs (coverage, AP placement) of weights, signal threshol
Within this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Late Work, and Maximum Earliness Time (∑𝐶𝑗, ∑𝑉𝑗, 𝐸𝑚𝑎𝑥), and the second problem, minimizing the multi-objective functions ∑𝐶𝑗 + ∑𝑉𝑗 +𝐸𝑚𝑎𝑥 are the problems at hand in this paper. In this study, a mathematical model is created to address the research problems, and some rules provide efficient (optimal) solutions to these problems. It has also been proven that each optimal solution for ∑𝐶𝑗 + ∑𝑉𝑗 + 𝐸𝑚𝑎𝑥 is an effic
... Show More