Preferred Language
Articles
/
alkej-170
Estimation of SNR Including Quantization Error of Multi-Wavelength Lidar Receiver
...Show More Authors

 This paper comprises the design and operation of mono-static backscatter lidar station based on a pulsed Nd: YAG laser that operates at multiple wavelengths. The three-color lidar laser transmitter is based on the collinear fundamental 1064 nm, second harmonic 532 nm and a third harmonic 355nm output of a Nd:YAG laser. The most important parameter of lidar especially daytime operations is the signal-to-noise ratio (SNR) which gives some instructions in designing of lidar and it is often limit the effective range. The reason is that noises or interferences always badly affect the measured results. The inversion algorithms have been developed for the study of atmospheric aerosols. Signal-to-noise ratio (SNR) of three-color channel receivers were presented while averaging together 1, 20, 50 and 100 lidar returns and combined to the signal to noise ratio associated with the quantization process for each channel.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
American Journal Of Pharmaceutical Education
Academic Entitlement Among Pharmacy Students in the Arab World: A Multi-National Exploratory Study
...Show More Authors

View Publication Preview PDF
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sun Dec 03 2017
Journal Name
Baghdad Science Journal
Network Self-Fault Management Based on Multi-Intelligent Agents and Windows Management Instrumentation (WMI)
...Show More Authors

This paper proposed a new method for network self-fault management (NSFM) based on two technologies: intelligent agent to automate fault management tasks, and Windows Management Instrumentations (WMI) to identify the fault faster when resources are independent (different type of devices). The proposed network self-fault management reduced the load of network traffic by reducing the request and response between the server and client, which achieves less downtime for each node in state of fault occurring in the client. The performance of the proposed system is measured by three measures: efficiency, availability, and reliability. A high efficiency average is obtained depending on the faults occurred in the system which reaches to

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Fri Sep 30 2022
Journal Name
Iraqi Journal Of Science
Distributed Multi-Ant Colony System Algorithm using Raspberry Pi Cluster for Travelling Salesman Problem
...Show More Authors

     The traveling salesman problem is addressed in this paper by introducing a distributed multi-ant colony algorithm that is implemented on a Raspberry Pi cluster. The implementation of a master and eight workers, each running on Raspberry Pi nodes, is the central component of this novel technique. Each worker is responsible for managing their own colony of ants, while the master coordinates communications among workers’ nodes and assesses the most optimal approach. To put the newly built cluster through its paces, several datasets of traveling salesman problem are used to test the created cluster. The findings of the experiment indicate that a single board computer cluster, which makes use of multi-ant colony algorithm, is a via

... Show More
View Publication Preview PDF
Scopus (2)
Crossref (2)
Scopus Crossref
Publication Date
Sat Jan 23 2021
Journal Name
Neural Computing And Applications
Multi-objectives TLBO hybrid method to select the related risk features with rheumatism disease
...Show More Authors

View Publication
Scopus (9)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Wed Nov 01 2017
Journal Name
Journal Of Computational And Theoretical Nanoscience
Solution for Multi-Objective Optimisation Master Production Scheduling Problems Based on Swarm Intelligence Algorithms
...Show More Authors

The emphasis of Master Production Scheduling (MPS) or tactic planning is on time and spatial disintegration of the cumulative planning targets and forecasts, along with the provision and forecast of the required resources. This procedure eventually becomes considerably difficult and slow as the number of resources, products and periods considered increases. A number of studies have been carried out to understand these impediments and formulate algorithms to optimise the production planning problem, or more specifically the master production scheduling (MPS) problem. These algorithms include an Evolutionary Algorithm called Genetic Algorithm, a Swarm Intelligence methodology called Gravitational Search Algorithm (GSA), Bat Algorithm (BAT), T

... Show More
View Publication Preview PDF
Scopus (13)
Crossref (11)
Scopus Crossref
Publication Date
Wed Mar 10 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
A hybrid Grey Wolf optimizer with multi-population differential evolution for global optimization problems
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Fri Apr 01 2022
Journal Name
International Journal Of Pharmacy Practice
Exploring job satisfaction among pharmacy professionals in the Arab world: a multi-country study
...Show More Authors
Abstract<sec> <title>Objectives

The study objectives were to (1) describe the characteristics of the pharmacy professionals and (2) explore the association between job satisfaction and factors, such as work control, work stress, workload and organization and professional commitments.

Methods

This study was a cross-sectional design. The survey items were mainly adapted from the US National Pharmacist Workforce Survey. An electronic (Qualtrics) questionnaire was posted on pharmacist social media in several A

... Show More
View Publication
Scopus (8)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Wed Jan 01 2020
Journal Name
International Conference Of Numerical Analysis And Applied Mathematics Icnaam 2019
Functionalized multi-walled carbon nanotubes network sensor for NO2 gas detection at room temperature
...Show More Authors

View Publication
Scopus (6)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Mon May 01 2023
Journal Name
Periodicals Of Engineering And Natural Sciences
Solving the multi-criteria: total completion time, total late work, and maximum earliness problem
...Show More Authors

Within this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Late Work, and Maximum Earliness Time (∑𝐶𝑗, ∑𝑉𝑗, 𝐸𝑚𝑎𝑥), and the second problem, minimizing the multi-objective functions ∑𝐶𝑗 + ∑𝑉𝑗 +𝐸𝑚𝑎𝑥 are the problems at hand in this paper. In this study, a mathematical model is created to address the research problems, and some rules provide efficient (optimal) solutions to these problems. It has also been proven that each optimal solution for ∑𝐶𝑗 + ∑𝑉𝑗 + 𝐸𝑚𝑎𝑥 is an effic

... Show More
View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Fri Jan 01 2021
Journal Name
International Journal Of Agricultural And Statistical Sciences
DYNAMIC MODELING OF TIME-VARYING ESTIMATION FOR DISCRETE SURVIVAL ANALYSIS FOR DIALYSIS PATIENTS IN BASRAH, IRAQ
...Show More Authors

Survival analysis is widely applied to data that described by the length of time until the occurrence of an event under interest such as death or other important events. The purpose of this paper is to use the dynamic methodology which provides a flexible method, especially in the analysis of discrete survival time, to estimate the effect of covariate variables through time in the survival analysis on dialysis patients with kidney failure until death occurs. Where the estimations process is completely based on the Bayes approach by using two estimation methods: the maximum A Posterior (MAP) involved with Iteratively Weighted Kalman Filter Smoothing (IWKFS) and in combination with the Expectation Maximization (EM) algorithm. While the other

... Show More
View Publication Preview PDF
Scopus (1)
Scopus