In the present investigation two different types of fiber reinforced polymer composites were prepared by hand lay-up method using three different parameters (curing temperature, pressing load and fiber volume fraction). These composites were prepared from the polyester resin as the matrix material reinforced with glass fibers as first group of samples and mat Kevlar fibers as the second group, both with different volume fractions (4%, 8%, and 12%) of fibers. They were then tested by tensile strength and impact strength. The main objective in this study is to use Taguchi method for predicting the better parameters that give the better tensile and impact strength to the composites, and then preparing composites at these parameters and comparing them with the randomly used once. The experimental and analytical results showed that the Taguchi method was successful in optimizing the parameters that give the highest properties and it can find the most influential parameter regardless of the material used. Also it showed that the volume fraction was the most influential parameter on the tensile and impact strength. The difference between these composites was in the properties values and that the Kevlar composites have higher tensile and impact strength.
Breast cancer is the most diagnosed form of malignant tumour in Iraqi women. Tamoxifen and trastuzumab are highly effective adjuvant therapy for breast cancer.
This study's objectives were to define the patient's belief in tamoxifen or trastuzumab when used as adjuvant therapy and to determine the variation in belief between the two medications in a sample of Iraqi breast cancer patients.
The cross-section survey was conducted using the BMQ-Specific questionnaire. Ninety-seven participants (sixty-seven tamoxifen, thirty trastuzumab) participated in this study.
The mean of specific-necessity scale for tamoxifen was (3.7) and for trastuzumab (4). The findings showed a high necessity for both medicines, and there wer
... Show MoreThis work deals with the nematode parasitesfrom the midgut of (16) specimens of Green
toad (Bufo viridis) Laurenti, 1768 collected from Baghdad area,central Iraq.
The parasites are:Cosmocercoides variabilis (Cosmocercidae) that considered as the first
report in Iraq on it and Oswaldocruzia filiformis (Molineidae).
The investigation of determining solutions for the Diophantine equation over the Gaussian integer ring for the specific case of is discussed. The discussion includes various preliminary results later used to build the resolvent theory of the Diophantine equation studied. Our findings show the existence of infinitely many solutions. Since the analytical method used here is based on simple algebraic properties, it can be easily generalized to study the behavior and the conditions for the existence of solutions to other Diophantine equations, allowing a deeper understanding, even when no general solution is known.
Thirty-four dolomite and dolomitic limestone samples were collected from Aqra – Bekhma (It is difficult to separate the two formations as they are intervening) Formation in Bekhma Gorge area near Shaqlawa in northern Iraq. Alizarin red - s was used to distinguish calcite from dolomite. The saddle dolomite was recognized as a virtually rough crystalline material with milky-white or rosy color when seen in outcrop. In addition, we observed a pearl luster and a characteristically marred crystal building that is, in principle, described as damaged crystal faces with cleavage planes, while microscopically it appeared as a widespread extinction. The crystal faces, although well advanced, are frequently pavement-like facets.
In project management process, the objective is to define and develop a model for planning, scheduling, controlling, and monitoring different activities of a particular project. Time scheduling plays an important role in successful implementation of various activities and general outcome of project. In practice, various factors cause projects to suffer from time delay in accomplishing the activities. One important reason is imprecise knowledge about time duration of activities. This study addresses the problem of project scheduling in uncertain resource environments, which are defined by uncertain activity durations. The study presents a solution of the levelling and allocation problems for projects that have some uncertain ac
... Show More