In this paper, the human robotic leg which can be represented mathematically by single input-single output (SISO) nonlinear differential model with one degree of freedom, is analyzed and then a simple hybrid neural fuzzy controller is designed to improve the performance of this human robotic leg model. This controller consists from SISO fuzzy proportional derivative (FPD) controller with nine rules summing with single node neural integral derivative (NID) controller with nonlinear function. The Matlab simulation results for nonlinear robotic leg model with the suggested controller showed that the efficiency of this controller when compared with the results of the leg model that is controlled by PI+2D, PD+NID, and FPD-ID controllers.
This paper proposes a hybrid artificial intelligence (AI) model that combines an Artificial Neural Network (ANN) and Particle Swarm Optimization (PSO) to predict the Quality of Service (QoS) in 5G networks. The model utilizes radio channel indicators such as Reference Signal Received Power (RSRP), Reference Signal Received Quality (RSRQ), Received Signal Strength Indicator (RSSI), and Channel Quality Indicator (CQI) to forecast throughput and latency levels. These indicators are critical factors affecting network performance; however, the nonlinear relationship among them makes traditional analytical models inadequate for accurate QoS prediction. The importance of the current study lies in estimating QoS in 5G networks by combining
... Show MoreIt is important that real time stability in smart grids is ensured as the integration of renewables and the complexity of the systems grows. In this paper, we provide a solid architecture, which combines a Residual CNNLSTM deep neural network predictor, FPGA-accelerated Model Predictive Control (MPC), and SHAP-based explainability. The proposed method predicted with 99.8% accuracy using the Electrical grid Stability Simulated Dataset (UCI) and minimized the instability rates surpassing 85 percent in all operating conditions. Meeting real-time operating needs, FPGA deployment on a Xilinx Zynq UltraScale+ provided 3.1 ms latency and 5 times reduced energy consumption against CPU processing. By emphasizing bus voltage and frequency as major in
... Show MoreIn this research two algorithms are applied, the first is Fuzzy C Means (FCM) algorithm and the second is hard K means (HKM) algorithm to know which of them is better than the others these two algorithms are applied on a set of data collected from the Ministry of Planning on the water turbidity of five areas in Baghdad to know which of these areas are less turbid in clear water to see which months during the year are less turbid in clear water in the specified area.
In this research two algorithms are applied, the first is Fuzzy C Means (FCM) algorithm and the second is hard K means (HKM) algorithm to know which of them is better than the others these two algorithms are applied on a set of data collected from the Ministry of Planning on the water turbidity of five areas in Baghdad to know which of these areas are less turbid in clear water to see which months during the year are less turbid in clear water in the specified area.
Reliability is an essential measure and important component of all power system planning and operation procedures. It is one of the key design factors when designing complex, critical and expensive systems. This paper presents a fuzzy logic approach for reliability improvement planning purposes. Evaluating the reliability of the complex and large planned Iraqi super grid ;as Al- Khairat generating station with its tie set is intended to be compact to that grid; and determination of the given reliability improvement project are the major goals of the paper. Results show that the Iraqi super grid reliability is improved by 9.64%. In the proposed technique, fuzzy set theory is used to include imprecise indices of different components in normal
... Show MoreThis paper deals with constructing mixed probability distribution from mixing exponential
The exploitation of all available resources and benefiting from them is one of the most important problems facing the decision makers at the present time. In order to exploit these resources, it is necessary to organize the conflicting objectives, which is the main work in the project management, which enables the development of a plan that decision makers can use to shorten the total completion time and reduce the total cost of the project. Through the use of modern scientific techniques, and therefore the researcher using the critical path method using the technology of programming goals to find more efficient ways to make appropriate decisions where the researcher worked to solve the problems in the construction of the Departm
... Show More