Through the last decade, Integrated Project Delivery (IPD) methodology considers one of the new contractual relations that are also on the way to further integrate the process of combining design and instruction. On the other hand, Building Information Modeling (BIM) made significant advancements in coordinating the planning and construction processes. It is being used more often in conjunction with traditional delivery methods. In this paper, the researcher will present the achievement of IPD methodology by using BIM through applying on the design of the financial commission building in Mayssan Oil Company in Iraq. The building has not been constructed yet and it was designed by usin
An evaluation the performance of the irrigation system for the Al-Ishaqi irrigation project for the Eastern Canal was conducted to identify management strategies that can be used to improve the operation and performance of the irrigation system. The study area is located in Salah al-Din G.0overnorate, Iraq. The field work included determining the moisture content of the soil before and after irrigation, measuring the inflow of the field to find the depth of the applied water, field monitoring, and measuring the depth of the root zone for each irrigation process. Field measurements showed that the average efficiency of water application for the two fields (A, and B) are 59.81% and 38.6%, respectively. The results of the efficiency of
... Show MoreThis study came for the reason that some project administrations still do not follow the appropriate scientific methods that enable them to perform their work in a manner that achieves the goals for which those projects arise, in addition to exceeding the planned times and costs, so this study aims to apply the methods of network diagrams in Planning, scheduling and monitoring the project of constructing an Alzeuot intersection bridge in the city of Ramadi, as the research sample, being one of the strategic projects that are being implemented in the city of Ramadi, as well as being one of the projects that faced during its implementation Several of problems, the project problem was studied according to scientific methods through the applica
... Show MoreThe research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability
... Show MoreThe research study of the possibility of the application of the quality management system under the international standard ISO ISO9001: 2008 in the station project Rustumiya wastewater treatment of the Department of SEWER BAGHDAD - Baghdad MOREALITY as the first step in the right direction towards the implementation of total quality management (TQM), and the research Find the gap between the international standard and the quality system used in the organization surveyed through the use of checklists to analyze the gap, the checklist have included (191) items distributed on five basic requirements, according to the appearance in the international standard, namely, (quality management system, management responsibility, resource man
... Show MoreGovernment-sponsored projects in Iraq significantly improve the economic situation and provide services but face high rates of troubling blocks. This work aims to identify indicative factors of the Troubled Project using periodic health check reports based on a literature review and interviews with Iraqi experts. As a result, a questionnaire was prepared that included four sections. The first is personal information; the second section is information about knowing the level of institutions’ implementation of project management through prepared documents. The third section is about indicative factors for the project's trouble, including 25 workers; the fourth section is about the questions in the periodic reports to che
... Show MoreThis paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t
... Show More
Focused research aims to provide a framework cognitive analytical nature of real estate investments and how they evaluated in the light of the assessment tools of modern theory of real options, and the possibility to rely on that theory in the detection of the true value of projects, real estate investments that would maximize the value of the investment decision taken, and the analysis of those projects that arise in the real estate markets and environments is the organization, which she was to make sure cases and high-risk, compared with entrances techniques, discounted cash flow (net present value). Based on the assumption lies in the possibility of the application of the implic
... Show MoreIn this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show More