It is well known that drilling fluid is a key parameter for optimizing drilling operations, cleaning the hole, and managing the rig hydraulics and margins of surge and swab pressures. Although the experimental works represent valid and reliable results, they are expensive and time consuming. In contrast, continuous and regular determination of the rheological fluid properties can perform its essential functions during good construction. The aim of this study is to develop empirical models to estimate the drilling mud rheological properties of water-based fluids with less need for lab measurements. This study provides two predictive techniques, multiple regression analysis and artificial neural networks, to determine the rheological
... Show MoreExperimental model was done for pile model of L / D = 25 installed into a laminar shear box contains different saturation soil densities (loose and dense sand) to evaluate the variation of pore water pressure before and after apply seismic loading. Two pore water pressure transducers placed at position near the middle and bottom of pile model to evaluate the pore water pressure during pullout tests. Seismic loading applied by uniaxial shaking table device, while the pullout tests were conducted through pullout device. The results of changing pore water pressure showed that the variation of pore water pressure near the bottom of pile is more than variation near the middle of pile in all tests. The variation of pore water
... Show MoreIn this study, field results data were conducted, implemented in 64 biofilm reactors to analyses extract organic matter nutrients from wastewater through a laboratory level nutrient removal process, biofilm layer moving process using anaerobic aerobic units. The kinetic layer biofilm reactors were continuously operating in Turbo 4BIO for BOD COD with nitrogen phosphorous. The Barakia plant is designed to serve 200,000 resident works on biological treatment through merge two process (activated sludge process, moving bed bio reactio MBBR) with an average wastewater flow of 50,000 m3/day the data were collected annually from 2017-2020. The water samples were analysis in the central labor
Water quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their performance is evaluated usin
... Show MoreExtracorporeal shock wave lithotripsy (ESWL) is considered a standard treatment for nephrolith or kidney stones measuring less than 20 mm. Anatomical, machine-related, and stone factors play pivotal roles in treatment outcomes, the latter being the leading role. This paper examined the relationship between stone density on native CT scans and ESWL treatment to remove renal stones concerning several treatments. One hundred and twenty patients (64 males and 56 females) were enrolled and completed the study from April 2019 to September 2020. Inclusion criteria were a single renal pelvis stone of 5–20 mm to be treated for the first time in adult patients with no urinary or musculoskeletal anatomical abnormalities. We assessed patients
... Show MoreBreast cancer (BC) is first of the top 10 malignancies in Iraq. Dose‐volume histograms (DVHs) are most commonly used as a plan evaluation tool. This study aimed to assess DVH statistics using three‐dimensional conformal radiotherapies in BC in an adjuvant setting.
A retrospective study of 70 histologically confirmed women diagnosed with BC was reviewed. The study was conducted between November 2020 and May 2021, planning for treatment with adjuvant three‐dimensional conformal radiotherapies. The treatment plan used for each woman was based on an analysis of the volumetric dose, inclu
Water quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their perfor
... Show More--The objective of the current research is to identify: 1) Preparing a scale level for e-learning applications, 2) What is the relationship between the applications of e-learning and the students of the Department of Chemistry at the Faculty of Education for Pure Sciences/ Ibn Al-Haytham – University of Baghdad. To achieve the research objectives, the researcher used the descriptive approach because of its suitability to the nature of the study objectives. The researcher built a scale for e-learning applications that consists of (40) items on the five-point Likrat scale (I agree, strongly agree, neutral, disagree, strongly disagree). He also adopted the scale of scientific values, and it consists of (40) items on a five-point scale as wel
... Show More