Dam break is series phenomenon that can result in fatal consequences and loss of properties. Unfortunately, the observed consequences can only be available after the dam breaks. Therefore, it is important to anticipate what will happen prior to dam break to issue suitable warning and locate the possible risk areas. This study attempts to simulate the case of dam break in Blue Nile at Roseires dam and see its consequences downstream. Roseires dam lies at a distance of 630 km south of Khartoum, Sennar dam lies at about 260 km downstream of Roseires dam. In this study hydraulic model is developed based of Hydraulic Engineering Centre (HEC), River Analysis System (RAS), and HEC- RAS. The HEC-RAS based model is calibrated and validated using observed data of the Blue Nile for several flood years. The calibrated and validated model is used to analyze the impact of flood wave due to dam break failure of Roseires dam to provide the following information: the maximum discharge, the maximum water level, the maximum velocity, the velocity and depth profiles, the flooding extent, etc. Several dam break scenarios that cover the possible failure modes were considered and the scenario that gives the worst situation is present in this paper. Piping is considered as failure mode with different failure parameters. It was found that failure of Roseires dam result in overtopping failure of Sennar dam due to the inability of the Sennar reservoir and dam to withstand the flood wave. The results also indicated that the maximum flood wave resulting from the failure of Roseires dam reaches Khartoum in 4, 6, 7 and 9 days when the maximum flow is 33105, 14724, 13249 and 12443 m3/s respectively the cities (Roseires, Sennar, Wad Medani and Khartoum ). The respective water surface level of flood wave is 481.01, 428.37 and 382.5 m in Roseires, Sennar and Khartoum and the wave speed at Khartoum is 8.97 m/s.
The Aim of this paper is to investigate numerically the simulation of ice melting in one and two dimension using the cell-centered finite volume method. The mathematical model is based on the heat conduction equation associated with a fixed grid, latent heat source approach. The fully implicit time scheme is selected to represent the time discretization. The ice conductivity is chosen
to be the value of the approximated conductivity at the interface between adjacent ice and water control volumes. The predicted temperature distribution, percentage melt fraction, interface location and its velocity is compared with those obtained from the exact analytical solution. A good agreement is obtained when comparing the numerical results of one
In this paper a two dimensional numerical simulation have been applied using
MATLAB program for generating Fraunhofer diffraction pattern from different
apertures. This pattern is applied for three types of apertures, including, circular,
square, and rectangular functions, and it's could be generated any wavelength in the
visible light. The studying demonstrated the capability and the efficiency of optical
imaging systems to observe a point source at very long distance. The circular
aperture shows better results across the shape of Fraunhofer pattern and optical
transfer function (otf). Also, the minimum values of the normalized irradiance of
different diffracted apertures have been computed at different dimension
Varied uses of international rivers in the past few decades dramatically, resulting in this multiplicity of uses and all associated with it for the occurrence of freshwater scarcity activities, and thus an increase in conflicts and disputes around on the rights of each of the riparian countries to benefit from the waters of the river at various purposes, particularly the establishment of dams on some of them as is the case (Renaissance Ethiopian) big impact on downstream countries Dam (Egypt and Sudan), due to the Oukuahma at the end of the Nile Valley made them vulnerable to environmental fluctuations, political crises facing the Nile basin countries, and any reduction in the proportion of water is not only the Nile River, but for all r
... Show MorePredicting the network traffic of web pages is one of the areas that has increased focus in recent years. Modeling traffic helps find strategies for distributing network loads, identifying user behaviors and malicious traffic, and predicting future trends. Many statistical and intelligent methods have been studied to predict web traffic using time series of network traffic. In this paper, the use of machine learning algorithms to model Wikipedia traffic using Google's time series dataset is studied. Two data sets were used for time series, data generalization, building a set of machine learning models (XGboost, Logistic Regression, Linear Regression, and Random Forest), and comparing the performance of the models using (SMAPE) and
... Show MoreGypseous soil covers approximately 30% of Iraqi lands and is widely used in geotechnical and construction engineering as it is. The demand for residential complexes has increased, so one of the significant challenges in studying gypsum soil due to its unique behavior is understanding its interaction with foundations, such as strip and square footing. This is because there is a lack of experiments that provide total displacement diagrams or failure envelopes, which are well-considered for non-problematic soil. The aim is to address a comprehensive understanding of the micromechanical properties of dry, saturated, and treated gypseous sandy soils and to analyze the interaction of strip base with this type of soil using particle image
... Show MoreThe study aimed to explaining the concepts of water footprint and virtual water and how these two concepts could use to achieve water savings at the local level to meet the water supply deficit in Iraq, which is expected to increase in the coming years and influence of that on food security in Iraq by using these concepts when drawing production, irrigated and import plans in Iraq. The study aimed to studying the water footprint and virtual water and their impact on the foreign trade for wheat and rice crops during the period 2000-2022 and estimating the most important indicators of virtual water and the water footprint of the study crops due to the importance of these criteria in det
In order to implement the concept of sustainability in the field of construction, it is necessary to find an alternative to the materials that cause pollution by manufacturing, the most important of which is cement. Because factory wastes provide siliceous and aluminous materials and contain calcium such as fly ash and slag that are used in the production of high-strength geopolymer concrete with specifications similar to ordinary concrete, it was necessary for developing this type of concrete that is helping to reduce CO2 (dioxide carbon) in the atmosphere. Therefore, the aim of this study was to study the influence of incorporating various percentages of slag as a replacement for fly ash and the effect of sl
... Show MoreIn the last years, the research of extraction the movable object from video sequence in application of computer vision become wide spread and well-known . in this paper the extraction of background model by using parallel computing is done by two steps : the first one using non-linear buffer to extraction frame from video sequence depending on the number of frame whether it is even or odd . the goal of this step is obtaining initial background when over half of training sequence contains foreground object . in the second step , The execution time of the traditional K-mean has been improved to obtain initial background through perform the k-mean by using parallel computing where the time has been minimized to 50% of the conventional time
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc