Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essentially based on the repetitive construction projects’ composition of identical production units. This study develops a mathematical model to forecast repetitive construction projects using the Support Vector Machine (SVM) technique. The software (WEKA 3.9.1©2016) has been used in the process of developing the mathematical model. The number of factors affecting the planning and scheduling of the repetitive projects has been identified through a questionnaire that analyzed its results using SPSS V22 software. Three accuracy measurements, correlation coefficient (R), Root Mean Square Error (RMSE) and Mean Absolute Error (MAE), were used to check the mathematical model and to compare the actual values with predicted values. The results showed that the SVM technique was more precise than those calculated by the conventional methods and was found the best generalization with R 97 %, MAE 3.6 %, and RMSE 7 %.</p>
Clarivate Crossref
View Publication
Publication Date
Thu Dec 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Usage of non-linear programming in building a mathematical model for production planning according to discount constraints put on bought amount
...Show More Authors

Abstract

 This research deals will the declared production planning operation in the general company of planting oils, which have  great role in production operations management who had built mathematical model for correct non-linear programming according to discounting operation during raw materials or half-made materials purchasing operation which concentration of six main products by company but discount included just three products of raw materials, and there were six months taken from the 1st half of 2014 as a planning period has been chosen . Simulated annealing algorithm  application on non-linear model which been more difficulty than possible solution when imposed restric

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
mathematical model for segmentation of the overall planning of puplic redemption company- ministry of industry and minerals
...Show More Authors

Abstract

The study presents a mathematical model with a disaggregating approach to the problem of production planning of a fida Company; which belongs to the ministry of Industry. The study considers disaggregating the entire production into 3 productive families of (hydraulic cylinders, Aldblatt (dampers), connections hydraulics with each holds similar characteristics in terms of the installation cost, production time and stock cost. The Consequences are an ultimate use of the available production capacity as well as meeting the requirements of these families at a minimal cost using linear programming. Moreover, the study considers developing a Master production schedule that drives detailed material and production requi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (3)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Wed Mar 10 2021
Journal Name
Baghdad Science Journal
Comparison of HF and HCl Chemical Laser Parameters by using Mathematical Model
...Show More Authors

A simplified theoretical comparison of the hydrogen chloride (HCl) and hydrogen fluoride (HF) chemical lasers is presented by using computer program. The program is able to predict quantitative variations of the laser characteristics as a function of rotational and vibrational quantum number. Lasing is assumed to occur in a Fabry-Perot cavity on vibration-rotation transitions between two vibrational levels of hypothetical diatomic molecule. This study include a comprehensive parametric analysis that indicates that the large rotational constant of HF laser in comparison with HCl laser makes it relatively easy to satisfy the partial inversion criterion. The results of this computer program proved their credibility when compared with th

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
An Applying the Delphi Technique for Eliciting Criteria in Equipment and Materials Used in Highway Construction Projects
...Show More Authors

This article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Journal Of Engineering
Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)
...Show More Authors

The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill  the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe

... Show More
View Publication Preview PDF
Publication Date
Mon Jul 18 2022
Journal Name
International Journal Of Early Childhood Special Education
The effectiveness of a proposed teaching strategy according to The Common Knowledge Construction Model in Mathematical Proficiency for middle school student
...Show More Authors

This research aims to know the effectiveness of teaching with a proposed strategy according to the common Knowledge construction modelin mathematical proficiency among students of the second middle class. The researchers adopted the method of the experimental approach, as the experimental design was used for two independent and equal groups with a post-test. The experiment was applied to a sample consisting of (83) students divided into two groups: an experimental comprising (42) students and a control group, the second comprising (41) students., from Badr Shaker Al-Sayyab Intermediate School for Boys, for the first semester of the academic year (2021-2022), the two groups were rewarded in four variables: (chronological age calculated in mo

... Show More
Publication Date
Tue Aug 01 2023
Journal Name
Baghdad Science Journal
Mathematical Models Used for Brachytherapy Treatment Planning Dose Calculation Algorithms
...Show More Authors

Brachytherapy treatment is primarily used for the certain handling kinds of cancerous tumors. Using radionuclides for the study of tumors has been studied for a very long time, but the introduction of mathematical models or radiobiological models has made treatment planning easy. Using mathematical models helps to compute the survival probabilities of irradiated tissues and cancer cells. With the expansion of using HDR-High dose rate Brachytherapy and LDR-low dose rate Brachytherapy for the treatment of cancer, it requires fractionated does treatment plan to irradiate the tumor. In this paper, authors have discussed dose calculation algorithms that are used in Brachytherapy treatment planning. Precise and less time-consuming calculations

... Show More
View Publication Preview PDF
Scopus (1)
Scopus Crossref
Publication Date
Sun Apr 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Designing and Application of Mathematical Model A Multi – Objectives for Assessment The Quality Of The Project : A Case Study at Saad Public Construction Company
...Show More Authors

Abstract

This research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Sep 01 2013
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The contractual budget: the ideal technique in planning and implementing capital budgeting projects: a strategy of preparing the contractual budget for Baghdad local government
...Show More Authors

Public budget is the government's tool in achieving the objectives of economic and social development is the accounting curriculum to estimate state revenues and expenditures for years to come, as well as to have legal status as it is after the adoption of an official statement of government units to spend funds on items planned at the same time is a statement collect resources to finance these appropriations, if the primary objective of the budget initially limited to the achievement of financial and legislative control have evolved this function in the area of public administration turned attention from mere imposition of control over the money, which provides information to assist the Department to utilize available resources and prog

... Show More
View Publication Preview PDF