The purpose of this article is to introduce reverse engineering procedure (REP). It can achieved by developing an industrial mechanical product that had no design schemes throughout the 3D-Scanners. The aim of getting a geometric CAD model from 3D scanner is to present physical model. Generally, this used in specific applications, like commercial plan and manufacturing tasks. Having a digital data as stereolithography (STL) format. Converting the point cloud be can developed as a work in programming by producing triangles between focuses, a procedure known as triangulation. Then it could be easy to manufacture parts unknown documentation and transferred the information to CNC-machines. In this work, modification was proposed and used in RE program, which is from CAD-CAM software's that used to redesign and modify on point of cloud in 3D modeling. This paper presents reverse engineering (RE) of the flange of water pump. Used mechanical and damaged parts have been selected which had as holes, slots, groove that are considered complex parts in RE to reach a match between original and tradition parts after manufacturing.
Basrah is the richest town and the economic capital of Iraq. It suffers from lack of drinking water. This project is a dream to supply drinking water to Basrah citizens within WHO standards. Water should pass sedimentation and filtration stages before interring reverse osmosis unit. The design is carried out using lewaplus2 software. Several parameters should be selected in the design step membrane type, number of stages, number per element in each stage, and the recovery percentage. An optimization is carried out using Minitab ver. 18 for the acceptable limit of TDS and minimum cost and it was found that the optimum conditions were 52% for first stage, the numbers of vessels are 20 for both the first and second stage. In addition,
... Show MoreIn some cases, surgeons need to navigate through the computer system for reconfirmation patients’ details and unfortunately surgeons unable to manage both computer system and operation at the same time. In this paper we propose a solution for this problem especially designed for heart surgeon, by introducing voice activation system with 3D visualization of Angiographic images, 2D visualization of Echocardiography processed video and selected patient’s details. In this study, the processing, approximation of the 3D angiography and the visualization of the 2D echocardiography video with voice recognition control are the most challenging work. The work involve with predicting 3D coronary three from 2D angiography image and also image enhan
... Show MoreThe study includes building a 3-D geological model, which involves get the Petrophysical properties as (porosity, permeability and water saturation). Effective Porosity, water saturation results from log interpretation process and permeability from special correlation using core data and log data. Clay volume can be calculated by six ways using IP software v3.5 the best way was by using gamma Ray. Also, Water Resistivity, flushed zone saturation and bulk volume analysis determined through geological study. Lithology determined in several ways using M-N matrix Identification, Density-Neutron and Sonic-Neutron cross plots. The cut off values are determined by Using EHC (Equivalent Hydra
Building a geological model is an essential and primary step for studying the reservoir’s hydrocarbon content and future performance. A three-dimensional geological model of the Asmari reservoir in Abu- Ghirab oil field including structure, stratigraphy, and reservoir petrophysical properties, has been constructed in the present work. As to underlying Formations, striking slip faults developed at the flank and interlayer normal. Abu Ghirab oilfields are located on the eastern anticlinal band, which has steadily plunged southward. 3D seismic interpretation results are utilized to build the fault model for 43 faults of the Asmari Formation in Abu Ghirab Oilfield. A geographic facies model with six different rock facies types
... Show MoreThe Zubair reservoir in the Abu-Amood field is considered a shaly sand reservoir in the south of Iraq. The geological model is created for identifying the facies, distributing the petrophysical properties and estimating the volume of hydrocarbon in place. When the data processing by Interactive Petrophysics (IP) software is completed and estimated the permeability reservoir by using the hydraulic unit method then, three main steps are applied to build the geological model, begins with creating a structural, facies and property models. five zones the reservoirs were divided (three reservoir units and two cap rocks) depending on the variation of petrophysical properties (porosity and permeability) that results from IP software interpr
... Show MoreDiabetes is one of the increasing chronic diseases, affecting millions of people around the earth. Diabetes diagnosis, its prediction, proper cure, and management are compulsory. Machine learning-based prediction techniques for diabetes data analysis can help in the early detection and prediction of the disease and its consequences such as hypo/hyperglycemia. In this paper, we explored the diabetes dataset collected from the medical records of one thousand Iraqi patients. We applied three classifiers, the multilayer perceptron, the KNN and the Random Forest. We involved two experiments: the first experiment used all 12 features of the dataset. The Random Forest outperforms others with 98.8% accuracy. The second experiment used only five att
... Show MoreMany risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
The production function forms one of the techniques used in evaluation the production the process for any establishment or company, and to explain the importance of contribution of element from the independent variable and it's affect on the dependent variable. Then knowing the elements which are significant or non-significant on the dependent variable.
So the importance of this study come from estimating the Cobb-Douglas production function for Al- Mansoor General Company for Engineering industries in Iraq during the period (1989-2001)
To explain the importance which effects the independent variable such as
(N