A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section. The design philosophy is discussed and methods for wind tunnel calculation are outlined. Simulation of wind tunnel using ANSYS shows no separation of flow along wind tunnel. Construction steps are also included in present work
Praise be to God, Lord of the worlds, and prayers and peace be upon our master Muhammad and upon his family and companions.
We see human societies differ from one society to another in organizing social life, and each according to the foundations and rules prepared by the main thing in the welfare and prosperity.
That is why we see eastern societies differ from western societies in many patterns and various ways of reaching that sophistication, until Islam came and gave the proper model in raising society at that time to the best and highest social levels, because it is based on heavenly rules and foundations and not status as in previous civilizations.
And when the Islamic community has
Abstract
The research aims at achieving a set of objectives, which is to study a vital variable in the organizations which is the talent management and its impact on encouraging and empowering employees to take part in making appropriate decisions with their heads in the Iraqi Cement State Company. The problem of this research is in finding solutions to the weaknesses that face the managers in attracting talented employees and keep them in the company, and this leads to a weak capacity of the company on authorizing talented employees and giving them the needed confidence to participate in decision making process. The research sample was included (45) managers in the researched company. Th
... Show MoreAdopting a policy of attracting investments in all countries, whether developing or developed prevailed, especially after the global crisis, and this trend is imposed by considerations of political and development (urban, economic, and social) can be formulated as a rational policy to solve many problems related to patterns of urban growth, economic, social, and including the problem of housing. As the reality of the housing sector in Iraq will require the allocation of substantial resources to promote it by the research problem is the lack of financial resources and the inability of investments to meet the various requirements including the requirements of economic sectors, particularly in the field of housing, infrastructure an
... Show MoreThe research team seeks to study the phenomena of random housing in Iraqi society in general and Baghdad city in particular by standing on the causes behind this phenomena and its relation with security situation in Baghdad. The researchers adopted a theoretical and practical framework. The main objective is to diagnose the risks caused by the escalation of slums in Baghdad city.
The world went through turmoil before the sixth century AD, and human societies were in conflict and rivalry, each strong state is a weak state-dependent, but the dominant societies made the slave societies to them .. And thus made many societies or civilizations system of classes, and differentiation between members of one community, Weakened its strength and go alone. As the Islamic society in the present weak and weak and falling to the lowest levels of civilizational underdevelopment in the organization of society and social security contrary to what it was Islamic civilization, because of our distance from the heavenly instructions, and this prompted many to walk behind Western ideas aimed at the demolition of Islamic civilization,
... Show MoreGenetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreThe main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show More