Preferred Language
Articles
/
ZBYJn4oBVTCNdQwCpqEI
Performance Estimation and System Modeling for Refractive Index Structure Constant Cn2
...Show More Authors

Scopus Crossref
View Publication
Publication Date
Mon Mar 01 2010
Journal Name
Al-khwarizmi Engineering Journal
Modeling and Simulation of Sensorless Speed Control of a Buck Converter Controlled Dc Motor
...Show More Authors

This paper investigate a sensorless speed control of a separately excited dc motor fed from a buck type dc-dc converter. The control system is designed in digital technique by using a two dimension look-up table. The performance of the drive system was evaluated by digital simulation using Simulink toolbox of Matlab.

View Publication Preview PDF
Publication Date
Tue Dec 26 2017
Journal Name
Al-khwarizmi Engineering Journal
Experimental Modeling and Optimization of Fatigue Life and Hardness of Carbon Steel CK35 under Dynamic Buckling
...Show More Authors

Abstract

 

The aim of this paper is to model and optimize the fatigue life and hardness of medium carbon steel CK35 subjected to dynamic buckling. Different ranges of shot peening time (STP) and critical points of slenderness ratio which is between the long and intermediate columns, as input factors, were used to obtain their influences on the fatigue life and hardness, as main responses. Experimental measurements of shot peening time and buckling were taken and analyzed using (DESIGN EXPERT 8) experimental design software which was used for modeling and optimization purposes. Mathematical models of responses were obtained and analyzed by ANOVA variance to verify the adequacy of the models. The resul

... Show More
View Publication Preview PDF
Publication Date
Thu Apr 27 2023
Journal Name
Civileng
Numerical Modeling and Analysis of Strengthened Steel–Concrete Composite Beams in Sagging and Hogging Moment Regions
...Show More Authors

Strengthening of composite beams is highly needed to upgrade the capacities of existing beams. The strengthening methods can be classified as active or passive techniques. Therefore, the main purpose of this study is to provide detailed FE simulations for strengthened and unstrengthened steel–concrete composite beams at the sagging and hogging moment regions with and without profiled steel sheeting. The developed models were verified against experimental results from the literature. The verified models were used to present comparisons between the effect of using external post-tensioning and CFRP laminates as strengthening techniques. Applying external post-tensioning at the sagging moment regions is more effective because of the e

... Show More
View Publication
Scopus (5)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Thu Jun 01 2023
Journal Name
Journal Of Engineering
Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most ef

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue Feb 12 2019
Journal Name
Iraqi Journal Of Physics
Calculated the diffuse and direct parts of global solar radiation in Baghdad city for the period (1983-2005) depending on clearness index by applying the two world models of Liu -Jordan
...Show More Authors

In this paper solar radiation was studied over a region of Baghdad (Latitude 33.3o and longitude 44.4o). The two parts of global solar radiation: diffuse and direct solar radiation were estimated depending on the clearance index of measured data (Average Monthly mean global solar radiation). Metrological data of measured (average monthly mean diffuse and direct solar radiation) were used to comparison the results and show the agreement between them. Results are determined by applying Liu and Jordan two models (1960). Excel 2007program is used in calculation, graphics and comparison the results.

View Publication Preview PDF
Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Integration The Cost Techniques with Balanced Scorecard for The Purposes of Measuring and Evaluating Performance
...Show More Authors

The effective application of the method of measuring and evaluating performance according to the Balanced  Scorecard the need for an information system a comprehensive and integrated for internal and external environment, Which requires the need to develop accounting information system in general and cost management information systems to suit the particular requirements of the environment in terms of the development of modern methods of measurement to include the use of some methods that have proven effective in measuring and evaluating performance.

The research problem in need of management to develop methods of measuring and evaluating performance through the use of both financial measures and non

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Dec 18 2017
Journal Name
Al-khwarizmi Engineering Journal
Experimental and Theoretical Study for Performance Enhancement of Air Solar Collectors by Using Different Absorbers
...Show More Authors

An experimental and theoretical study has been done to investigate the thermal performance of different types of air solar collectors, In this work air solar collector with a dimensions of (120 cm x90 cm x12 cm) , was tested under climate condition of  Baghdad city with a (43° tilt angel)  by using  the absorber plate (1.45 mm thickness, 115 cm height x 84 cm width), which was manufactured from iron painted with a black matt.

The experimental test deals with five types of absorber:-

 Conventional smooth flat plate absorber , Finned absorber , Corrugated absorber plate, Iron wire mesh on absorber And matrix of porous media  on absorber .

The hourly and average efficiency of the collectors

... Show More
View Publication Preview PDF
Publication Date
Fri Dec 01 2017
Journal Name
International Journal Of Electrical And Computer Engineering (ijece)
Performance Evaluation of UDP, DCCP, SCTP and TFRC for Different Traffic Flow in Wired Networks
...Show More Authors

<p>The demand for internet applications has increased rapidly.  Providing quality of service (QoS) requirements for varied internet application is a challenging task. One important factor that is significantly affected on the QoS service is the transport layer. The transport layer provides end-to-end data transmission across a network. Currently, the most common transport protocols used by internet application are TCP (Transmission Control Protocol) and UDP (User Datagram Protocol). Also, there are recent transport protocols such as DCCP (data congestion control protocol), SCTP (stream congestion transmission protocol), and TFRC (TCP-friendly rate control), which are in the standardization process of Internet Engineering Task

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Sep 30 2002
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Modeling of a Sulfonation Reactor in a Detergent Factory
...Show More Authors

View Publication Preview PDF