Preferred Language
Articles
/
ZBY0SYcBVTCNdQwCvEKB
Sustainability and recovery project management implementation on construction projects in Iraq
...Show More Authors

Scopus
Publication Date
Wed Jan 01 2025
Journal Name
International Journal Of Hydrogen Energy
A comprehensive review of battery thermal management systems for electric vehicles: Enhancing performance, sustainability, and future trends
...Show More Authors

View Publication
Scopus (8)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Evaluation of real estate investment projects with framework theory of real options: A case study in the shopping center project (Baghdad Mall)
...Show More Authors

 

Focused research aims to provide a framework cognitive analytical nature of real estate investments and how they evaluated in the light of the assessment tools of modern theory of real options, and the possibility to rely on that theory in the detection of the true value of projects, real estate investments that would maximize the value of the investment decision taken, and the analysis of those projects that arise in the real estate markets and environments is the organization, which she was to make sure cases and high-risk, compared with entrances techniques, discounted cash flow (net present value). Based on the assumption lies in the possibility of the application of the implic

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Studies In Systems, Decision And Control
The Effect of Using an Accounting Information System Based on Artificial Intelligence in Detecting Earnings Management to Enhance the Sustainability of Economic Units
...Show More Authors

This research aims to clarify the importance of an accounting information system that uses artificial intelligence to detect earnings manipulation. The research problem stems from the widespread manipulation of earning in economic entities, especially at the local level, exacerbated by the high financial and administrative corruption rates in Iraq due to fraudulent accounting practices. Since earning manipulation involves intentional fraudulent acts, it is necessary to implement preventive measures to detect and deter such practices. The main hypothesis of the research assumes that an accounting information system based on artificial intelligence cannot effectively detect the manipulation of profits in Iraqi economic entities. The researche

... Show More
View Publication
Scopus Crossref
Publication Date
Tue Mar 01 2022
Journal Name
Process Safety And Environmental Protection
Safety and health management response to COVID-19 in the construction industry: A perspective of fieldworkers
...Show More Authors

View Publication
Scopus (50)
Crossref (49)
Scopus Clarivate Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Review Of International Geographical Education
Evaluating the performance of project management using network diagrams methods: A case study in the Ramadi Municipality
...Show More Authors

This study came for the reason that some project administrations still do not follow the appropriate scientific methods that enable them to perform their work in a manner that achieves the goals for which those projects arise, in addition to exceeding the planned times and costs, so this study aims to apply the methods of network diagrams in Planning, scheduling and monitoring the project of constructing an Alzeuot intersection bridge in the city of Ramadi, as the research sample, being one of the strategic projects that are being implemented in the city of Ramadi, as well as being one of the projects that faced during its implementation Several of problems, the project problem was studied according to scientific methods through the applica

... Show More
Scopus (1)
Scopus
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
The Possibility of Applying Quality Management System ISO9001: 2008 in Station Project Al Rustumiya - A Case Study
...Show More Authors

The research study of the possibility of the application of the quality management system under the international standard ISO ISO9001: 2008 in the station project Rustumiya wastewater treatment of the Department of SEWER BAGHDAD - Baghdad MOREALITY as the first step in the right direction towards the implementation of total quality management (TQM), and the research Find the gap between the international standard and the quality system used in the organization surveyed through the use of checklists to analyze the gap, the checklist have included (191) items distributed on five basic requirements, according to the appearance in the international standard, namely, (quality management system, management responsibility, resource man

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
PROJECT MANAGEMENT OF BALAD`S MAJOR SEWERAGE SYSTEM BY USING THE GOAL PROGRAMMING METHOD
...Show More Authors

Abstract

          The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the     life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's  management  experience is how to achieve thes

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
The Effect of Age and occupation on the Type and the Number of workers injuries in construction sector in Iraq
...Show More Authors

World statistics proved that the most of work dangerous accidents, which causes death, are occurred in the construction works. These accidents related to many causes such as loss of workers experience and ignoring rules of safety requirements, especially young workers. Due to the risk of accidents that may occur in the site of work, the idea of this study crystallized to show the relationship between the age of worker and number of injuries and accidents, to identify the causes of these injuries, and to put the appropriate solutions to avoid or reduce the risk of work injuries. Also, the research shows the main principles of safety requirements to forming a clear picture about the subject of the study. A questioner form was prepared to c

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Engineering
Application of Building Information Modeling (3D and 4D) in Construction Sector in Iraq
...Show More Authors

ABSTRACT

Building Information Modeling (BIM) is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC) industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world.

The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a fr

... Show More
View Publication Preview PDF