Serial tendering is better than other types of tendering when it comes to cost reduction, where civil infrastructure projects need a significant increase in the amount of tough planning, financial expenditures, engineering work, and resources of a different character than other types of construction projects. The effects of a lack of funding cause decrease in the completion speed of the project on time. The need to reduce the cost of bidding on recurrent civil infrastructure projects is critical. To achieve the desired goals of this research, this article will provide an overview of the type of bids used in the construction of schools implemented in the current financial perspective in Iraq, the extent of benefit, and the amount of possible reduction if continuous and serial tendering are used.
The primary aim of this study was to find out the effect of a training program on the development of physical abilities in football goalkeepers. The current study was conducted on goalkeepers of the Academy of Espanyol Sports Club in the premises of Haifa Sports Club Stadium. The study was completed by the researchers within the timeline of May 2021 to August 2021. A total of 7 goalkeepers falling within the age group of 15-17 years were recruited as the sample participants for the study. Out of 7 goalkeepers, 5 goalkeepers were included in the primary experiment and 2 of them were excluded. The training program applied had a positive effect on the development of physical abilities in the football goalkeepers of the sa
... Show MoreReactive Powder Concrete (RPC) could be considered as the furthermost significant modern high compressive strength concrete. In this study, an experimental investigation on the impact of micro steel fiber volume fraction ratio and gamma ray irradiation duration influence upon the compressive strength of RPC is presented. Three volume fraction ratios (0.0, 1.0 and 1.5) % was implemented. For each percentage of the adopted fiber ratios, six different irradiation duration was considered; these are (1, 2, 3, 4, 5 and 6) days. Gamma source (Cs-137) of energy (0.662) MeV and activity (6) mci was used. In a case of zero volume fraction ratio, the experimental results showed that gamma ray had a significant influence on the reducing of the
... Show MoreThe aim: In this study, we present and evaluate the vest-over-pants technique as a simple way to correct urethrocutaneous fistulas after hypospadias. Materials and methods: Between October 2018 and June 2020, twenty male patients aged 5 to 20 years came to us with post hypospadias repair fistula, these patients underwent vest-over-pant repair of their fistula. The size of fistula was ranging between 2.5-5 mm. The distribution of fistula was coronal (3 patients), distal penile (9 patients), midshaft (2 patients) and proximal penile (6 patients). In 14 patients there were single fistula and 6 patients had more than one fistula. Eleven of patients were exposed to a previous failed fistula repair procedure. Results: Six months after the operati
... Show MoreX-ray emission contains some of the gaseous properties is produced when the particles of the solar wind strike the atmosphere of comet ISON and PanSTARRS Comets. The data collected with NASA Chandra X-ray Observatory of the two comets, C/2012 S1 (also known as Comet ISON) and C/2011 S4 (Comet PanSTARRS) are used in this study.
The real abundance of the observed X-ray spectrum elements has been extracted by a new simple mathematic model. The study found some physical properties of these elements in the comet’s gas such as a relationship between the abundance with emitted energy. The elements that have emission energy (2500-6800) eV, have abundance (0.1-0.15) %, while the elements
... Show MoreThe current study involves placing 135 boreholes drilled to a depth of 10 m below the existing ground level. Three standard penetration tests (SPT) are performed at depths of 1.5, 6, and 9.5 m for each borehole. To produce thematic maps with coordinates and depths for the bearing capacity variation of the soil, a numerical analysis was conducted using MATLAB software. Despite several-order interpolation polynomials being used to estimate the bearing capacity of soil, the first-order polynomial was the best among the other trials due to its simplicity and fast calculations. Additionally, the root mean squared error (RMSE) was almost the same for the all of the tried models. The results of the study can be summarized by the production
... Show MorePhysical model tests were simulated non-aqueous phase liquid (NAPL) spill in two-dimensional
domain above the water table. Four laboratory experiments were carried out in the sand-filled
tank. The evolution of the plume was observed through the transparent side of this tank and the
contaminant front was traced at appropriate intervals. The materials used in these experiments
were Al-Najaf sand as a porous medium and kerosene as contaminant.
The results of the experiments showed that after kerosene spreading comes to a halt (ceased) in
the homogeneous sand, the bulk of this contaminant is contained within a pancake-shaped lens
situated on top of the capillary fringe.
Cadmium element is one of the group IIB and classified as heavy metal and effects on human health and environment. The present work concerns with the biosorption of Cd(II) ions from aqueous solution using the outer layer of onions. Adsorption of the used ions was found to be pH dependent and maximum removal of the ions by outer layer of onions and was found to be 99.7%.
The dewatering arrangement is required in execution works and it needs more attention due to the additional vertical settlement produced on the adjacent pile foundations. Raft foundations are being increasingly utilized for construction in cases of subsoil conditions with a high water table. Also, soil displacements in adjacent un-braced deep open pit may be a reason for high damages to the close buildings and foundations systems. The aim of this study is to examine the behaviour of piled raft foundations considering different pile locations under the effect of line drain and stage drilling of nearby open foundation pit. The line drain was used as dewatering process through the soil i