The goal of the research is to develop a sustainable rating system for roadway projects in Iraq for all of the life cycle stages of the projects which are (planning, design, construction and operation and maintenance). This paper investigates the criteria and its weightings of the suggested roadway rating system depending on sustainable planning activities. The methodology started in suggesting a group of sustainable criteria for planning stage and then suggesting weights from (1-5) points for each one of it. After that data were collected by using a closed questionnaire directed to the roadway experts group in order to verify the criteria weightings based on the relative importance of the roadway related impacts
... Show MoreThe study aims to identify the impact of the round-robin strategy on the logical thinking of fourth-year middle school students in chemistry. Two groups were employed: an experimental group consisted of (30) students who were taught according to the round-robin strategy, and the control group consisted of (30) students who were taught according to the traditional method. The researcher adopted the experimental design with partial control by preparing the visual thinking test tool, which consists of (20) multiple-choice items, it was applied as a post-test on the research sample. The result showed that there was a statistically significant difference in favor of the experimental group, which was taught according to the Round Robin s
... Show MoreThe goal of current research to know the according of scientific values in the curriculum of chemistry sixth - grade science To achieve this goal wasa to build aalistaofa scientifica values toa be included in the curriculum of chemistry sixth - grade science after seeing a group of literature and previous studies, the list presented to a group of arbitrators and specialists in educational and psychological sciences and methods of teaching science, and curricula and teaching methods , Arbitrators and specialists have expressed their views and comments on the tool, and that the list was formed in final form (9) values Head of scientific includes ( 35) sub - value, then the researcher analyzed the chemistry curriculum for sixth grade Scient
... Show MoreKnowledge of permeability, which is the ability of rocks to transmit the fluid, is important for understanding the flow mechanisms in oil and gas reservoirs.
Permeability is best measured in the laboratory on cored rock taken from the reservoir. Coring is expensive and time-consuming in comparison to the electronic survey techniques most commonly used to gain information about permeability.
Yamama formation was chosen, to predict the permeability by using FZI method. Yamama Formation is the main lower cretaceous carbonate reservoir in southern of Iraq. This formation is made up mainly of limestone. Yamama formation was deposited on a gradually rising basin floor. The digenesis of Yamama sediments is very important due to its direct
A large number of researchers had attempted to identify the pattern of the functional relationship between fertility from a side and economic and social characteristics of the population from another, with the strength of effect of each. So, this research aims to monitor and analyze changes in the level of fertility temporally and spatially in recent decades, in addition to estimating fertility levels in Iraq for the period (1977-2011) and then make forecasting to the level of fertility in Iraq at the national level (except for the Kurdistan region), and for the period of (2012-2031). To achieve this goal has been the use of the Lee-Carter model to estimate fertility rates and predictable as well. As this is the form often has been familiar
... Show MorePrimary productivity and chlorophyll-a were used in this study to monitor the restoration process of southern Iraqi marshes (Al-Hewaizeh, central marshes, and Al-Hammar). The phytoplankton primary productivity was based on oxygen light/dark bottle method. Two different depths samples were taken monthly from six studied marshes stations (two stations for each marsh) during November 2005 to October 2006, while chlorophyll-a samples taken from surface water. The phytoplankton primary productivity values ranged 9.38 – 249.79 mg C/m3.hr for all marshes, its values for surface water sample ranged 11.71 – 256.24 mg C/m3.hr, while for 1m depth ranged 9.38 – 142.5 mg C/m3.hr. Chlorophyll-a values ranged between (1.1 – 21.26) µg/l indicating
... Show MoreProduction logging is used to diagnose well production problems by evaluating the flow profile, entries of unwanted fluids and downhole flow regimes. Evaluating wells production performance can be easily induce from production logs through interpretation of production log data to provide velocity profile and contribution of each zone on total production. Production logging results supply information for reservoir modeling, provide data to optimize the productivity of existing wells and plan drilling and completion strategies for future wells. Production logging was carried out in a production oil well from Mishrif formation of West Qurna field, with the objective to determine the flow profile and fluid contributions from the perforations af
... Show MoreProduction logging is used to diagnose well production problems by evaluating the flow profile, entries of unwanted fluids and downhole flow regimes. Evaluating wells production performance can be easily induce from production logs through interpretation of production log data to provide velocity profile and contribution of each zone on total production. Production logging results supply information for reservoir modeling, provide data to optimize the productivity of existing wells and plan drilling and completion strategies for future wells. Production logging was carried out in a production oil well from Mishrif formation of West Qurna field, with the objective to determine the flow profile and fluid contributions from the perforations af
... Show MoreThe reserve estimation process is continuous during the life of the field due to risk and inaccuracy that are considered an endemic problem thereby must be studied. Furthermore, the truth and properly defined hydrocarbon content can be identified just only at the field depletion. As a result, reserve estimation challenge is a function of time and available data. Reserve estimation can be divided into five types: analogy, volumetric, decline curve analysis, material balance and reservoir simulation, each of them differs from another to the kind of data required. The choice of the suitable and appropriate method relies on reservoir maturity, heterogeneity in the reservoir and data acquisition required. In this research, three types of rese
... Show More