We propose a novel strategy to optimize the test suite required for testing both hardware and software in a production line. Here, the strategy is based on two processes: Quality Signing Process and Quality Verification Process, respectively. Unlike earlier work, the proposed strategy is based on integration of black box and white box techniques in order to derive an optimum test suite during the Quality Signing Process. In this case, the generated optimal test suite significantly improves the Quality Verification Process. Considering both processes, the novelty of the proposed strategy is the fact that the optimization and reduction of test suite is performed by selecting only mutant killing test cases from cumulating t-way test cases. As such, the proposed strategy can potentially enhance the quality of product with minimal cost in terms of overall resource usage and time execution. As a case study, this paper describes the step-by-step application of the strategy for testing a 4-bit Magnitude Comparator Integrated Circuits in a production line. Comparatively, our result demonstrates that the proposed strategy outperforms the traditional block partitioning strategy with the mutant score of 100% to 90%, respectively, with the same number of test cases.
Increasing hydrocarbon recovery from tight reservoirs is an essential goal of oil industry in the recent years. Building real dynamic simulation models and selecting and designing suitable development strategies for such reservoirs need basically to construct accurate structural static model construction. The uncertainties in building 3-D reservoir models are a real challenge for such micro to nano pore scale structure. Based on data from 24 wells distributed throughout the Sadi tight formation. An application of building a 3-D static model for a tight limestone oil reservoir in Iraq is presented in this study. The most common uncertainties confronted while building the model were illustrated. Such as accurate estimations of cut-off permeab
... Show MoreIncreasing hydrocarbon recovery from tight reservoirs is an essential goal of oil industry in the recent years. Building real dynamic simulation models and selecting and designing suitable development strategies for such reservoirs need basically to construct accurate structural static model construction. The uncertainties in building 3-D reservoir models are a real challenge for such micro to nano pore scale structure. Based on data from 24 wells distributed throughout the Sadi tight formation. An application of building a 3-D static model for a tight limestone oil reservoir in Iraq is presented in this study. The most common uncertainties confronted while building the model were illustrated. Such as accurate estimations of cut-off
... Show MoreThe goal of the research is to develop a sustainable rating system for roadway projects in Iraq for all of the life cycle stages of the projects which are (planning, design, construction and operation and maintenance). This paper investigates the criteria and its weightings of the suggested roadway rating system depending on sustainable planning activities. The methodology started in suggesting a group of sustainable criteria for planning stage and then suggesting weights from (1-5) points for each one of it. After that data were collected by using a closed questionnaire directed to the roadway experts group in order to verify the criteria weightings based on the relative importance of the roadway related impacts
... Show MoreElectrical distribution system loads are permanently not fixed and alter in value and nature with time. Therefore, accurate consumer load data and models are required for performing system planning, system operation, and analysis studies. Moreover, realistic consumer load data are vital for load management, services, and billing purposes. In this work, a realistic aggregate electric load model is developed and proposed for a sample operative substation in Baghdad distribution network. The model involves aggregation of hundreds of thousands of individual components devices such as motors, appliances, and lighting fixtures. Sana’a substation in Al-kadhimiya area supplies mainly residential grade loads. Measurement-based
... Show MoreAbstract
A surface fitting model is developed based on calorimeter data for two famous brands of household compressors. Correlation equations of ten coefficient polynomials were found as a function of refrigerant saturating and evaporating temperatures in range of (-35℃ to -10℃) using Matlab software for cooling capacity, power consumption, and refrigerant mass flow rate.
Additional correlations equations for these variables as a quick choice selection for a proper compressor use at ASHRAE standard that cover a range of swept volume range (2.24-11.15) cm3.
The result indicated that these surface fitting models are accurate with in ± 15% for 72 compressors model of cooling cap
... Show MoreKeys for 22 species representing ten genera Thripidae collection carried out during 1999-2001 in different localities in the middle of Iraq. Of them four species are described as new to science, Frankliniella megacephala sp. nov; Retithrips bagdadensis sp. nov; Chirothrips imperatus sp. nov; Taeniothrips tigridis sp. nov; Another thirteen species are recorded for the first time in Iraq; Thrips meridionalis (Pri.); Microcephalothrips abdominils (Crawford); Scolothrips pallidus (Beach); Scritothrips mangiferae Pri.; Frankliniella tritici Bagnall; Frankliniella schultzie Trybom; Frankliniella unicolor Morgan; Retithrips aegypticus Mar
... Show MoreEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show Moreأن لعبة كرة السلة في تقدم وتطور مستمر حالها في ذلك حال الألعاب الرياضية الأخرى حيث أن الفضل في ذلك يعود إلى المعرفة بالعلوم المختلفة وكذلك البحث العلمي من اجل تحقيق نتائج متقدمة تنشدها معظم الدول ومنها العراق على الصعيد المحلي والعربي والدولي. ومما لاشك فيه أن متطلبات تطور مستوى نتائج القدرات البدنية في أيُة لعبة مرتبطة بالبرمجة والتخطيط الصحيح للمناهج التدريبية إذ تقودنا هذه الحقيقة إلى إجراء المزيد من الا
... Show MoreAbstract
This research aims to define the roles of auditors by clarifying the concept and risks of cyber security in protecting information and financial data in economic units. Najaf, Babylon and Karbala, then the results were analyzed and the results were presented and analyzed to show that adopting cyber security improves the quality of reports Finance through what it achieves in displaying information with credibility and transparency, in a way that suits the needs of users, and cyber security has a role in managing economic resources more effectively to obtain benefits that would have been lost in the event of an
... Show MoreThe research deals with the relationship between supplier evaluation (single variable) and family brand strategy (single variable) a case study in the battery factory\Al-Waziriya, and the fact that the industrial sector represents a cornerstone for building the country’s economy of and their development. The research has been selected on this basis. The problem stems from the lack of business understanding of the real role played by the assessment of the suppliers' and its strong impact on its reputation and position in the market. The research gains its importance by moving away from traditional marketing style in terms of characteristics related to the resource itself, and the service provided by the factory to c
... Show More