ABSTRACT: BACKGROUND: Left ventricular hypertrophy is a significant risk factor for cardiovascular complications such as ischemic heart disease, heart failure, sudden death, atrial fibrillation, and stroke. A proper non-expensive tool is required for detection of this pathology. Different electrocardiographic (ECG) criteria were investigated; however, the results were conflicting regarding the accuracy of these criteria. OBJECTIVE: To assess the accuracy of three electrocardiographic criteria in diagnosis of left ventricular hypertrophy in adult patients with hypertension using echocardiography as a reference test. PATIENTS AND METHODS: This is a hospital-based cross sectional observational study which included 340 adult patients with a history of hypertension (240 patients with left ventricular hypertrophy and 100 patients without depending on Echocardiographic results). Three electrocardiographic criteria including Sokolow Lyon Voltage, Cornell voltage, and Cornell voltage duration were evaluated for their sensitivity and specificity in detection of left ventricular hypertrophy in those patients. RESULTS: Each of older ages (over 50 years) (OR= (OR=6.25, 95%CI=3.75-10.39, p<0.001), male gender (OR=0.58, 95% CI= 0.36-0.93, p= 0.018) and type 2 diabetes mellitus (OR=8.14, 95%CI= 4.04-16.41, p<0.001) were significantly associated with development of left ventricular hypertrophy in patients with hypertension. The sensitivity and specificity of Sokolow Lyon Voltage, Cornell voltage, and Cornell voltage duration were 17.5% and 96%; 13.33% and 97%; and 10% and 98%, respectively. CONCLUSION: Older ages, male gender, and type 2 diabetes mellitus can increase the risk of left ventricular hypertrophy in hypertensive patients. All the studied criteria have low sensitivity and high specificity in recognition of the left ventricular hypertrophy in patients with hypertension, with no advantage of definite criterion over the others.
KE Sharquie, AA Noaimi, SD Hameed, Journal of Cosmetics, Dermatological Sciences and Applications, 2013 - Cited by 15
This study presents an adaptive control scheme based on synergetic control theory for suppressing the vibration of building structures due to earthquake. The control key for the proposed controller is based on a magneto-rheological (MR) damper, which supports the building. According to Lyapunov-based stability analysis, an adaptive synergetic control (ASC) strategy was established under variation of the stiffness and viscosity coefficients in the vibrated building. The control and adaptive laws of the ASC were developed to ensure the stability of the controlled structure. The proposed controller addresses the suppression problem of a single-degree-of-freedom (SDOF) building model, and an earthquake control scenario was conducted and simulat
... Show MoreIn aspect-based sentiment analysis ABSA, implicit aspects extraction is a fine-grained task aim for extracting the hidden aspect in the in-context meaning of the online reviews. Previous methods have shown that handcrafted rules interpolated in neural network architecture are a promising method for this task. In this work, we reduced the needs for the crafted rules that wastefully must be articulated for the new training domains or text data, instead proposing a new architecture relied on the multi-label neural learning. The key idea is to attain the semantic regularities of the explicit and implicit aspects using vectors of word embeddings and interpolate that as a front layer in the Bidirectional Long Short-Term Memory Bi-LSTM. First, we
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa