Preferred Language
Articles
/
Uheuoo4BVTCNdQwC51b6
The Prospective of Artificial Neural Network (ANN’s) Model Application to Ameliorate Management of Post Disaster Engineering Projects
...Show More Authors

Currently and under the COVID-19 which is considered as a kind of disaster or even any other natural or manmade disasters, this study was confirmed to be important especially when the society is proceeding to recover and reduce the risks of as possible as injuries. These disasters are leading somehow to paralyze the activities of society as what happened in the period of COVID-19, therefore, more efforts were to be focused for the management of disasters in different ways to reduce their risks such as working from distance or planning solutions digitally and send them to the source of control and hence how most countries overcame this stage of disaster (COVID-19) and collapse. Artificial intelligence should be used when there is no practical solution for a problem occurring in a projects starting from individual self-development ending to the adaptation to information technology sector with a continuous posting in this world of information industry where as metaphor “needs is a cause of creativity”. This study focuses on the use of artificial neural networks ANN to find a solution to issues in projects delays and furthermore when there is no physical or mathematical solution found so far. ANN’s were used to build a model that helps in finding a solution for delays in some selected projects in Baghdad (as case study), and discussing the strategies of rebuilding plus delays in time and cost due to delay factors. 35 construction projects were chosen in Baghdad greater area, vary in sizes and types. Crew and laborers were targeted in sampling collection methodology basically throughout questionnaire forms of field survey as they were filled by them. ANN’s helped in modelling delays factors to help decision makers in an appropriate management of projects. External factors which includes disasters mentioning COVID-19 as the most important disaster ever happened in the last decades, were the most important factor that caused delay in time and cost of projects implementation processes where this factor was controlling the other major factors such as contractor failure, redesigning, changing orders, security issues, low prices, besides weather issues and owner failure.

Crossref
View Publication
Publication Date
Thu Oct 01 2020
Journal Name
Bulletin Of Electrical Engineering And Informatics
Traffic management inside software-defined data centre networking
...Show More Authors

In recent years, data centre (DC) networks have improved their rapid exchanging abilities. Software-defined networking (SDN) is presented to alternate the impression of conventional networks by segregating the control plane from the SDN data plane. The SDN presented overcomes the limitations of traditional DC networks caused by the rapidly incrementing amounts of apps, websites, data storage needs, etc. Software-defined networking data centres (SDN-DC), based on the open-flow (OF) protocol, are used to achieve superior behaviour for executing traffic load-balancing (LB) jobs. The LB function divides the traffic-flow demands between the end devices to avoid links congestion. In short, SDN is proposed to manage more operative configur

... Show More
View Publication
Scopus (16)
Crossref (13)
Scopus Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Professional Safety
How Technology Can Improve OSH Management in Construction
...Show More Authors

Publication Date
Wed Jun 01 2022
Journal Name
Bulletin Of Electrical Engineering And Informatics
Global virtual teams management system: project manager guide
...Show More Authors

Global virtual teams (GVTs) are a recent organizational adaptation created to meet the needs of globalizatized marketplace. GVTs are essentially teams that are distributed across national boundaries and concerned through advanced information and communication technology (ICT) such as email, instant messaging, and video conferencing. The research on GVTs is important in the information system (IS) field because GVTs are dependent on information communication technology and the use of other technologies; GVTs also consists of people from different cultures. This paper tried to answer two research questions. The first one is: what are the GVTs problems facing the project manager (PM). A literature review was conducted to answer the fir

... Show More
View Publication
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Mon Apr 05 2021
Journal Name
Solid State Technology
Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem

... Show More
View Publication Preview PDF
Publication Date
Mon Aug 01 2022
Journal Name
Bulletin Of Electrical Engineering And Informatics
Solid waste recycling and management cost optimization algorithm
...Show More Authors

Solid waste is a major issue in today's world. Which can be a contributing factor to pollution and the spread of vector-borne diseases. Because of its complicated nonlinear processes, this problem is difficult to model and optimize using traditional methods. In this study, a mathematical model was developed to optimize the cost of solid waste recycling and management. In the optimization phase, the salp swarm algorithm (SSA) is utilized to determine the level of discarded solid waste and reclaimed solid waste. An optimization technique SSA is a new method of finding the ideal solution for a mathematical relationship based on leaders and followers. It takes a lot of random solutions, as well as their outward or inward fluctuations, t

... Show More
View Publication Preview PDF
Scopus (5)
Crossref (5)
Scopus Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Wed Jul 31 2019
Journal Name
Journal Of Engineering
A Comparative Study of Various Intelligent Optimization Algorithms Based on Path Planning and Neural Controller for Mobile Robot
...Show More Authors

In this paper, a cognitive system based on a nonlinear neural controller and intelligent algorithm that will guide an autonomous mobile robot during continuous path-tracking and navigate over solid obstacles with avoidance was proposed. The goal of the proposed structure is to plan and track the reference path equation for the autonomous mobile robot in the mining environment to avoid the obstacles and reach to the target position by using intelligent optimization algorithms. Particle Swarm Optimization (PSO) and Artificial Bee Colony (ABC) Algorithms are used to finding the solutions of the mobile robot navigation problems in the mine by searching the optimal paths and finding the reference path equation of the optimal

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Mon Feb 25 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Planning and implementation of the audit process by using the styles of time management and its impact on the quality of the audit process: Applied Research in the Federal Board of Supreme Audit
...Show More Authors

Witnessing the global arena many changes in the political, economic, social, scientific and technological have left their mark on the world as a whole, these changes require necessarily Advancement of the profession of auditing, and improve their performance, especially after the mixer skepticism the health of approach and the method followed by a check in the major audit firms global view as for the external audit of an active role in providing services to members of the community in various sectors, were to be provide these services to the highest level of quality.To ensure the quality of the audit process to be a proper planning is based on a scientific basis to be the substrate a strong underlying different audit works, and if planni

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jun 01 2013
Journal Name
Int. J. Nanoelectronics And Materials
The response of a window glass to the frequencies of sound
...Show More Authors

Preview PDF
Publication Date
Wed Apr 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Identifying the Phenomenon of monopoly according to the vision of Accounting
...Show More Authors

The research seeks to identify the factors affecting the monopoly and the possibility of measuring the phenomenon of economic ( monopolistic profit) accounted for and that the importance of research topic arising from the transformation of the majority of developing countries to the market economy, which represents the image of the capitalist economy, which is a monopoly, a stages that economy in its various forms, whether Market Worldwide sales monopoly or monopoly, which generates absolute monopolistic profits, which more or less affect on the overall economy of those countries than they should study the phenomenon of monopoly and its impact on the economies of those countries that still love to find her site reinforces its pos

... Show More
View Publication Preview PDF
Crossref