Preferred Language
Articles
/
URZcR4gBVTCNdQwCtHa4
How Technology Can Improve OSH Management in Construction
...Show More Authors

Publication Date
Sat Oct 29 2022
Journal Name
Computers
Intelligent Robotic Welding Based on a Computer Vision Technology Approach
...Show More Authors

Robots have become an essential part of modern industries in welding departments to increase the accuracy and rate of production. The intelligent detection of welding line edges to start the weld in a proper position is very important. This work introduces a new approach using image processing to detect welding lines by tracking the edges of plates according to the required speed by three degrees of a freedom robotic arm. The two different algorithms achieved in the developed approach are the edge detection and top-hat transformation. An adaptive neuro-fuzzy inference system ANFIS was used to choose the best forward and inverse kinematics of the robot. MIG welding at the end-effector was applied as a tool in this system, and the wel

... Show More
View Publication
Scopus (18)
Crossref (17)
Scopus Clarivate Crossref
Publication Date
Sat Oct 29 2022
Journal Name
Computers
Intelligent Robotic Welding Based on a Computer Vision Technology Approach
...Show More Authors

Robots have become an essential part of modern industries in welding departments to increase the accuracy and rate of production. The intelligent detection of welding line edges to start the weld in a proper position is very important. This work introduces a new approach using image processing to detect welding lines by tracking the edges of plates according to the required speed by three degrees of a freedom robotic arm. The two different algorithms achieved in the developed approach are the edge detection and top-hat transformation. An adaptive neuro-fuzzy inference system ANFIS was used to choose the best forward and inverse kinematics of the robot. MIG welding at the end-effector was applied as a tool in this system, and the wel

... Show More
View Publication Preview PDF
Scopus (18)
Crossref (17)
Scopus Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
KNOWLEDGE SHARING REQUIREMENTS TO IMPROVE THE QUALITY OF THE AUDIT WORKS IN THE FEDERAL BOARD OF SUPREME AUDIT OF IRAQ
...Show More Authors

The research studies the main variables for the concept of sharing in knowledge in one of the most important control agencies in Iraq, which is (The Federal Board of Supreme Audit). Also, the quality of the controlling businesses by the Board in light of the major challenges that facing the fight against signs of cheating and administrative and financial corruption for offices submitted to controlled and auditing, with the increasing and intensification of these appearances. In order to enable the Board to cope with this situation, has to be thinking hard about how to achieve excellence, progress and development to face these situations, through the application of sharing in knowledge for the financial controller, and then achiev

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Apr 06 2020
Journal Name
Asian Journal Of Civil Engineering
Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq
...Show More Authors

View Publication
Scopus (23)
Crossref (24)
Scopus Crossref
Publication Date
Fri Aug 01 2025
Journal Name
Journal Of Structural Design And Construction Practice
Value of Safety Incentives and Rewards on Construction Outcomes
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Wed Jul 05 2017
Journal Name
International Journal Of Science And Research (ijsr)
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Construction Research Congress
Risk Perception of Construction Personnel: A Social Construct Outlook
...Show More Authors

Scopus (1)
Scopus
Publication Date
Fri Nov 09 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Construction of the School Physical Environment Standardized Features Tool
...Show More Authors

Objective: A descriptive design, using the methodological approach, is carried throughout the present
study from April 1st 2012 to May 20th 2013 to construct the school physical environment standardized
features tool.
Methodology: An instrument of (141) item is constructed for the purpose of the study. A purposive
sample of (44) school; (22) public and (22) private ones is selected. Content Validity of the instrument is
determined through the use of panel of (11) expert who are specialists in Community Health Nursing and
Community Medicine. Internal consistency reliability, using the split-half technique, is employed through
the computation of Cronbach alpha correlation coefficient of (0.93) for internal scale. Data

... Show More
View Publication Preview PDF
Publication Date
Sat Jun 30 2012
Journal Name
Al-kindy College Medical Journal
Management of Chronic Osteomylitis
...Show More Authors

Background : Bone infections is one of the most challenging orthopaedic complications, with considerable morbidity. There is significant impact on the life of the patients; socially, financially, physically, and mentally and it could be a limb-threatening complication. Osteomyelitis is a bone infection usually caused by bacteria, including mycobacteria, but mainly Staphylococcus aureus which is the most commonly responsible bacteria . Aim of study: To evaluate our management policy of chronic osteomylitis (C.O.M).
Methods : 32 patients presented with different types &forms of chronic osteomyelitis in many sites of long & flat bones such as tibia , femur, ,humerus ,iliac bones and knee joint , which are not response to previous

... Show More
View Publication Preview PDF