In this paper, a robust invisible watermarking system for digital video encoded by MPEG-4 is presented. The proposed scheme provides watermark hidden by embedding a secret message (watermark) in the sprite area allocated in reference frame (I-frame). The proposed system consists of two main units: (i) Embedding unit and (ii) Extraction unit. In the embedding unit, the system allocates the sprite blocks using motion compensation information. The allocated sprite area in each I–frame is used as hosting area for embedding watermark data. In the extraction unit, the system extracts the watermark data in order to check authentication and ownership of the video. The watermark data embedding method is Blocks average modulation applied on RGB domain. The applied modulation technique is based on making uniform quantization to the block mean value of the color bands. The tests indicated that the proposed block mean modulation method of the sprite blocks showed robust watermark embedding; it was capable to withstand against lossy JPEG.
Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo
In this work, the study of
The large number of failure in electrical power plant leads to the sudden stopping of work. In some cases, the necessary reserve materials are not available for maintenance which leads to interrupt of power generation in the electrical power plant unit. The present study, deals with the determination of availability aspects of generator in unit 5 of Al-Dourra electric power plant. In order to evaluate this generator's availability performance, a wide range of studies have been conducted to gather accurate information at the level of detail considered suitable to achieve the availability analysis aim. The Weibull Distribution is used to perform the reliability analysis via Minitab 17, and Artificial Neural Networks (ANNs) by approaching o
... Show MoreIn this work, the fractional damped Burger's equation (FDBE) formula = 0,
In this work, the fractional damped Burger's equation (FDBE) formula = 0,
The laser micro-cutting process is the most widely commonly applied machining process which can be applied to practically all metallic and non-metallic materials. While this had challenges in cutting quality criteria such as geometrical precision, surface quality and numerous others. This article investigates the laser micro-cutting of PEEK composite material using nano-fiber laser, due to their significant importunity and efficiency of laser in various manufacturing processes. Design of experiential tool based on Response Surface Methodology (RSM)-Central Composite Design (CCD) used to generate the statistical model. This method was employed to analysis the influence of parameters including laser speed,
... Show More