The work is devoted to the study of the plastics features in modern construction use. The plastics classification in modern construction is generalized. This classification includes: the field of building products application, the features of the materials properties and products, a backup group that includes those products that are not included in the previous groups. The classification considered is the basis for choosing the basic materials properties that affect the quality and durability of products. To improve the plastics types in the construction, the Venn diagram is used. The main materials types for manufacturing a product of the "window profile" type are analyzed; the result of the studies is a comparative diagram.
In this work, a large part of Baghdad University campus has been selected. The determination of Geoidal height for the local area requires Ground Control Points which both Ellipsoidal and Orthometric heights are known to compute the difference between them. The first step of the leveling process began by selected the Ground Control Points (GCPs) around the area of the work, and then divided them into two groups of the network traverse stations. They were leveled and adjusted depend on the number of the Bench Marks (B.M.s). Total Station TS (Nikon Nivo 5C) and Global Positioning System (GPS-Garmin 78 map) are used to do this application. The aim of the proposed work was to determine the height of the Geoid surface in the study area. The Geoi
... Show MoreThe research problem identified to impose question followingDoes the abstract style role in the backs of visual attraction in modern textile designs?The research aims to reveal the role of the external design in modern women's textile designs printed, design and develop foundations for practical purposes to achieve visual attraction through abstract style used in the design of modern women's fabricsIn regard to the second quarter, which contained the theoretical framework and previous studies, it was included in the board three sections, the first section included the concept of abstraction, while the second section included in place of attraction and infrastructure design, In regard to the third topic was concerned with the concept of m
... Show MoreDr. Qahtan Al-Madfa’i’s architecture has been characterized by a particular characteristic that may be unique and extreme at the same time, that is the use of the distinctive three-dimensional structural coverings and the exploitation of structural construction to give an extra aesthetic touch to the composition of the building, to achieve the application of his universal ideas, which he strongly believed and defended.
In the period of the marked urban decline that the country undergoes now, which urges us toward making a comparison between the beginning of the modern Iraqi architecture and its ascending path up to its peak and the periods of its decline until it reached a very
... Show MoreZnO-nanoflowers on a transparent conductive tin-doped In2O3 (ITO) glass substrate have been successfully prepared via a simple and efficient growth approach that is combining of dip coating and hydrothermal processes. One thin layer of ZnO nanoparticles is prepared by dip coating method followed by hydrothermally grown of ZnO nanoflowers at low temperature. The morphology and structure of ZnO-nanoflowers were inspected by field-emission scanning electron microscopy (FE-SEM) and X-ray diffraction (XRD), respectively. The optical absorption and photoluminescence spectra of ZnO-nanoflowers are also investigated. The ZnO-nanoflowers photoanode sho
The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show More