Preferred Language
Articles
/
TxZbR4gBVTCNdQwCKna0
Construction Safety Personnel Qualifications: The Impact of Education, Experience, and Certificate Programs
...Show More Authors

Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Dec 31 2021
Journal Name
Iraqi Geological Journal
Construction of Comprehensive Geological Model for an Iraqi Oil Reservoir
...Show More Authors

The paper generates a geological model of a giant Middle East oil reservoir, the model constructed based on the field data of 161 wells. The main aim of the paper was to recognize the value of the reservoir to investigate the feasibility of working on the reservoir modeling prior to the final decision of the investment for further development of this oilfield. Well log, deviation survey, 2D/3D interpreted seismic structural maps, facies, and core test were utilized to construct the developed geological model based on comprehensive interpretation and correlation processes using the PETREL platform. The geological model mainly aims to estimate stock-tank oil initially in place of the reservoir. In addition, three scenarios were applie

... Show More
Preview PDF
Scopus (7)
Crossref (2)
Scopus Crossref
Publication Date
Sun Jan 01 2012
Journal Name
Conference
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jun 01 2015
Journal Name
Conference: 8th International Conference And Exhibition On Design And Production Of Machines And Dies/molds
Design, Construction, and Controlling of A Shaped Metal Deposition Machine Using Arc Metal-Wire System
...Show More Authors

Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Tue Jan 01 2013
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.

Publication Date
Wed Apr 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
A specimen of the internal control system on the stock in light of the application JIT system In construction companies
...Show More Authors

Suffer most of the facilities of the high cost of inventory , which affects the high cost of the product and thus affects many administrative decisions , as well as suffer the facilities of the systems developed by the provisions of inventory control , and this problem is exacerbated in the construction sector where the inventory in the form of Construction spin of the Year for another it becomes difficult to control the cost effectively , and is the research problem in question follows: What are the implications of the use of the system in time inventory accounting system for the contracting company does kills Alrkaah to the provisions of the cost of inventory and what is the optimal approach to inventory control ? Find assumed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jan 10 2019
Journal Name
International Journal Of Research In Social Sciences And Humanities
PHYSICAL AND FUNCTIONAL CONSTRUCTION INDICATORS AND THEIR RELATIONSHIP TO SOME ELEMENTS OF FITNESS FOR BUDDING BASKETBALL PLAYERS
...Show More Authors

Basketball is a popular game in many parts of the world and many developed countries are making continuous efforts to prepare and develop their emerging players on scientific and clear bases as the basis for reaching high levels The researchers used the descriptive approach in the method of correlative studies to suit the nature of the study The readymade software (IBM SPSS Statistics Version24) was used to perform statistical treatments The researchers concluded that there was a significant relationship between body size indicators (height and weight) with the fitness elements of the emerging basketball players The researchers recommended conducting a similar study to determine the type of relationship to the indicators of the physical str

... Show More
Publication Date
Sat Mar 01 2025
Journal Name
Acta Marisiensis - Seria Medica
Transcatheter balloon valvuloplasty for children with severe pulmonary valve stenosis: A single-center experience
...Show More Authors
Abstract<p> <bold>Objectives</bold>: this study aim to assess the effectiveness of the Transcatheter balloon valvoplasty (BVP) of severe Pulmonary stenosis (PS) and identify possible complications and predictors for the outcome.</p><p> <bold>Methods</bold>: A retrospective study was conducted at the Iraqi Center of Cardiac Diseases for a 2-year duration in the period from 2021 to the end of 2023; the patients with confirmed severe PS of both genders within the age equal to or less than 18 years were included. For every patient included in the present study, the following data were collected: Demographic data, Echoc</p> ... Show More
View Publication
Scopus (1)
Scopus Crossref