Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postponement of delay of interim payments is at the forefront of delay factors caused by the employer’s decision. Even the least one is to leave the job site caused by the contractor’s second part of the contract, the repeated unjustified stopping of the work at the site, without permission or notice from the client’s representatives. The developed model was applied to about 97 projects and used as a prediction model. The decision tree model shows higher accuracy in the prediction.</p>
Scopus Clarivate Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Journal Of Engineering
Significant Safety Factors Affecting the Safety Performance in Iraqi Construction Projects
...Show More Authors

Despite recent attempts to improve safety in the construction sector, this sector is considered dangerous and unsafe. Iraq is one of the emerging nations that suffers from a lack of construction safety management. In 2018, the construction sector in Iraq was responsible for 38% of all industrial accidents. Creating a safety program minimizes this problem by making safety an intrinsic part of construction projects. As a result, this article aims to identify the crucial safety factors that affect the safety performance in Iraqi construction projects. After conducting a critical literature review of the related literature, a list of 35 sub-factors classified into nine categories of main factors was chosen to rank each facto

... Show More
View Publication Preview PDF
Scopus (4)
Crossref (3)
Scopus Crossref
Publication Date
Sat Apr 12 2025
Journal Name
Mustansiriyah Journal Of Sports Science
A Review of the Use of Artificial Intelligence Algorithms for Predicting Injuries and Performance in Football Players
...Show More Authors

The purpose of this study is to investigate the research on artificial intelligence algorithms in football, specifically in relation to player performance prediction and injury prevention. To accomplish this goal, scholarly resources including Google Scholar, ResearchGate, Springer, and Scopus were used to provide a systematic examination of research done during the last ten years (2015–2025). Through a systematic procedure that included data collection, study selection based on predetermined criteria, categorisation based on AI applications in football, and assessment of major research problems, trends, and prospects, almost fifty papers were found and analysed. Summarising AI applications in football for performance and injury p

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Wed Apr 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
A specimen of the internal control system on the stock in light of the application JIT system In construction companies
...Show More Authors

Suffer most of the facilities of the high cost of inventory , which affects the high cost of the product and thus affects many administrative decisions , as well as suffer the facilities of the systems developed by the provisions of inventory control , and this problem is exacerbated in the construction sector where the inventory in the form of Construction spin of the Year for another it becomes difficult to control the cost effectively , and is the research problem in question follows: What are the implications of the use of the system in time inventory accounting system for the contracting company does kills Alrkaah to the provisions of the cost of inventory and what is the optimal approach to inventory control ? Find assumed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
The Effect of Age and occupation on the Type and the Number of workers injuries in construction sector in Iraq
...Show More Authors

World statistics proved that the most of work dangerous accidents, which causes death, are occurred in the construction works. These accidents related to many causes such as loss of workers experience and ignoring rules of safety requirements, especially young workers. Due to the risk of accidents that may occur in the site of work, the idea of this study crystallized to show the relationship between the age of worker and number of injuries and accidents, to identify the causes of these injuries, and to put the appropriate solutions to avoid or reduce the risk of work injuries. Also, the research shows the main principles of safety requirements to forming a clear picture about the subject of the study. A questioner form was prepared to c

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Mar 01 2023
Journal Name
Journal Of Engineering
Design, Construction, and Control Tracking of Solar Thermal Concentrator by Using PLC in Erbil
...Show More Authors

This paper demonstrates the construction designing analysis and control strategies for fully tracking concentrated solar thermal by using programmable logic control in the city of Erbil-Iraq. This work used the parabolic dish as a concentrated solar thermal. At the focal point, the collected form of energy is used for heating a (water) in the receiver, analyzing this prototype in real-time with two different shapes of the receiver and comparing the results. For tracking the parabolic dish, four light-dependent resistors are used to detect the sun's position in the sky so that the tracking system follows it to make the beam radiation perpendicular to the collector surface all of the time during the day for maximum solar p

... Show More
View Publication Preview PDF
Scopus (2)
Scopus Crossref
Publication Date
Mon Dec 29 2025
Journal Name
Journal Of Applied Engineering And Technological Science (jaets)
Using Fuzzy Cognitive Maps For Modeling Environmental Aspect of Sustainable Development in Construction Projects
...Show More Authors

The pillars of sustainable development are representing the interface between environmental, economic, and social sustainability. Sustainable development is a method of planning and managing construction projects to reduce the effect of the construction process on the environment so that there is a balance between environmental capabilities and the human needs of present and future generations. Usually, Environmental sustainability is most important and effective in construction projects. The environment suffers from significant negative impacts as a result of the implementation of construction projects; therefore, this study aims to identify the effecting factors on environmentally sustainable development. The methodology of this s

... Show More
View Publication Preview PDF
Scopus (1)
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
8th Engineering And 2nd International Conference For College Of Engineering – University Of Baghdad: Coec8-2021 Proceedings
Prediction of pore and fracture pressure using well logs in Mishrif reservoir in an Iraqi oilfield
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
Journal Of Economics And Administrative Sciences
Comparison Between Maximum Likelihood and Bayesian Methods For Estimating The Gamma Regression With Practical Application
...Show More Authors

In this paper, we will illustrate a gamma regression model assuming that the dependent variable (Y) is a gamma distribution and that it's mean ( ) is related through a linear predictor with link function which is identity link function g(μ) = μ. It also contains the shape parameter which is not constant and depends on the linear predictor and with link function which is the log link and we will estimate the parameters of gamma regression by using two estimation methods which are The Maximum Likelihood and the Bayesian and a comparison between these methods by using the standard comparison of average squares of error (MSE), where the two methods were applied to real da

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue Jun 30 2026
Journal Name
Journal Of Economics And Administrative Sciences
Nonparametric Control Charts Estimation Using Hybrid Cyber-Intelligence Algorithms for Stock Market Monitoring
...Show More Authors

This paper introduces a novel nonparametric hybrid cyber-intelligence-based statistical process control and anomaly detection framework in time series data. It is developed to overcome the shortcomings of the classical control schemes in dealing with complex, abnormal, and noisy input data, especially when it is autocorrelated. The proposed methodology combines three technical pillars: First, it utilizes a bidirectional long-short-term memory architecture (Bi-LSTM) to capture long-term time dependency and learn nonlinear patterns, leaving only true deviations as residuals that remove trends and noises from the market. Second, it adopts the Golden Eagle Optimizer (GEO) algorithm for optimal parameter selection. This intelligent algor

... Show More
View Publication
Crossref
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc