One of the most important human diseases that need to be considered in terms of development of the medical engineering devices is cardiovascular disease which is a significant cause of death globally recently. Valvular heart disease is normally treated by restoring or altering heart valves with an artificial one. But the new prosthetic valve designs necessitate testing for durability estimate and failure method. It is significant to simulate the circulation system by the building of a pulse duplicator system. This study is stated by clarifying the parameter and implementation steps of the pulse duplicator system in which the different researchers have utilized the system and tried to explain the design steps of using this system without going into the system design by steps or what are the main part of this system and how can be implemented, tested, and developed individually. In this design, a DC motor produces, through a hydraulic piston, a flow pulse to the left ventricle chamber model, which is linked with two interchangeable prosthetic heart valves. The computer is used to control and process data from volumetric flow rate and image. The findings show that the linear displacement, the velocity of the piston and the linear acceleration regularly become significant particularly and follows a sinusoidal wave shape during one cycle, when (crank length/connecting rod length) value is equal 0.2 or less. Several sets of measured flow rate readings were obtained by using flow meter sensor YF-S201, results after calibration showed the error rate falls within permissible limits
The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show MoreThe five-a- Side Soccer for simple mental disability is as interesting and caring as many other sporting events. Therefore, the researchers believe that their basic skills tests are compatible with then level of the tested individuals in terms of age and mental ability. As a means of selecting those who are qualified to practice this game in a simple way, the problem of research has been identified in the design and standardization of two scoring skills that belong to this category and are approved by the training staff during the initial selection process. The research community is determined by people with mental disabilities who belong to the governmental and private institutes and the Special Olympics Union in Baghdad and for the year 2
... Show MoreThe management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show MoreThe aim of this research is to design and construct a semiconductor laser range finder
operating in the near infrared range for ranging and designation. The main part of the range finder is the
transmitter which is a semiconductor laser type GaAs of 0.904 mm wavelength with a beam expander,
and the receiver with its collecting optics. The characteristics of transmitter pulse width were 200ns and
threshold current 10 Amp. and maximum operating current 38 Amp. The repetition rate was set at 660 Hz
and maximum output power about 1 watt. The divergence of the beam was 0.268o. A special computer
code was used for optimum optical design and laser spot size analysis and for calculation of atmosphere
attenuation.
In Production and Operations Management the specialists have tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.
The research aims to develop a blu
... Show MoreAlteration of repeat tract length within the SSR of phase variable genes may enhance the persistence of isolates within their host for a long time (a period of months) (Alamro et al.,2014). Alamro et al. (2014) showed there was trend towards selection for OFF state or low expression for five phase variable genes (opc, hmbr, nadA, nalP, hpuAB) in three carriers (V54, V124 and V64) within strains belonging into CC174 and CC167 in first, second and third time points. He concluded that the selection for low or OFF state helped N. meningitidis to persist for a long time (Alamro et al., 2014). The current study aimed to detect the alteration in the repeat tracts of the same five variable genes within the previous three carriers (V54, V124, and V6
... Show MoreAmong the available chaotic modulation schemes, differential chaos shift keying (DSCK) offers the perfect noise performance. The power consumption of DCSK is high since it sends chaotic signal in both of 1 and 0 transmission, so it does not represent the optimal choice for some applications like indoor wireless sensing where power consumption is a critical issue. In this paper a novel noncoherent chaotic communication scheme called differential chaos on-off keying (DCOOK) is proposed as a solution of this problem. With the proposed scheme, the DCOOK signal have a structure similar to chaos on-off keying (COOK) scheme with improved performance in noisy and multipath channels by introducing the concept of differential coherency used in DCS
... Show MoreApplications of nonlinear, time variant, and variable parameters represent a big challenge in a conventional control systems, the control strategy of the fuzzy systems may be represents a simple, a robust and an intelligent solution for such applications.
This paper presents a design of fuzzy control system that consists of three sub controllers; a fuzzy temperature controller (FC_T), a fuzzy humidity controller (FC_H) and a ventilation control system; to control the complicate environment of the greenhouse (GH) using a proposed multi-choice control system approach. However, to reduce the cost of the crop production in the GH, the first choice is using the ventilation system to control the temperature and humidit
... Show More