The electrical and thermal performance of a typical single pass hybrid photovoltaic/thermal (PV/T) air collector is modeled, simulated and analyzed for two selected case studies in Iraq. An improved mathematical thermo-electrical model is derived in terms of design, operating and climatic parameters of the hybrid solar collector to evaluate its important characteristics: collector flow and heat removal factors, PV maximum power point and its temperature coefficient, and overall power and efficiency. Unlike previous PV/T thermal models, the present model is obtained with some additions and corrections in radiation and convection heat coefficients for the top loss and for the air duct with more applicable sky temperature correlation. The well-known 5-parameter electrical model of PV module is solved using improved boundary conditions and translation equations for better convergence and accuracy. The voltage temperature coefficient of the PV module is included in the boundary conditions for convergence stability. The module parameters are taken to be dependent on solar radiation and PV cell temperature for improved accuracy. A Matlab computer simulation program is developed to solve the thermo-electrical model. The developed model is verified with previously published experimental results and theoretical simulations; it is proved to be most accurate in respect to percentage errors and correlation coefficients. Different parameters of the PV/T collector such as cell and air temperatures, thermal gain, PV current and voltage, and fill factor have been investigated. The results identified the effects of most important operating conditions such as sky, inlet and cell temperatures, air flow rate and incident solar radiation on the performance of the hybrid collector. The approved model is applied for a winter day (22 January 2011) in Baghdad city and for a summer day (20 May 2011) in Fallujah city. It is found that the electrical, thermal and overall collector efficiencies for the two case studies were 12.3%, 19.4% and 53.6% respectively for the winter day, while that for the summer day were 9%, 22.8% and 47.8%.
Image classification is the process of finding common features in images from various classes and applying them to categorize and label them. The main problem of the image classification process is the abundance of images, the high complexity of the data, and the shortage of labeled data, presenting the key obstacles in image classification. The cornerstone of image classification is evaluating the convolutional features retrieved from deep learning models and training them with machine learning classifiers. This study proposes a new approach of “hybrid learning” by combining deep learning with machine learning for image classification based on convolutional feature extraction using the VGG-16 deep learning model and seven class
... Show MoreChilled ceilings systems offer potential for overall capital savings. The main aim of the present research is to investigate the thermal performance of the indirect contact closed circuit cooling tower, ICCCCT used with chilled ceiling, to gain a deeper knowledge in this important field of engineering which has been traditionally used in various industrial & HVAC systems. To achieve this study, experimental work were implemented for the ICCCCT use with chilled ceiling. In this study the thermal performances of closed wet cooling tower use with chilled ceiling is experimentally and theoretically investigated. Different experimental tests were conducted by varying the controlling parameters to investigate their effects
... Show MoreIn IRAQ, the air conditioners are the principal cause of high electrical demand. In summer, the outer temperature sometimes exceeds 500C which significantly effects on the A/C system performance and power consumed. In the present work, the improvement in mechanical and electrical performance of split A/C system is investigated experimentally and analytically. In this paper, performance and energy saving enhancement of a split-A/C system was experimentally investigated to be efficiently compatible with elevated temperature weathers. This improvement is accomplished via Smart Control System integrate with Proportional-Integral- Differential PID algorithm. The PIC16F877A micro-controller has been programmed with the PID and PWM c
... Show MoreThis work studies the impact of input machining parameters of Electrical Discharge Machining (EDM) on the machining process performance. Tool steel O1 was selected as the workpiece material, copper as the electrode material, and kerosene as the dielectric medium. Experimental runs have been carried out with a Design of Experiment (DOE) technique. Twenty tests are accomplished with the current range of (18 to 24 Ampere), a pulse duration range of (150 to 200 µs), and a pulse-off time range of (25 to 75 µs). Based upon the experimental study's output results, the EDM parameter's effect (voltage of power supply, discharge current, pulse duration, and pulse pause interval) on the responses of the process represented by sur
... Show MoreIn this work, the performance of the receiver in a quantum cryptography system based on BB84 protocol is scaled by calculating the Quantum Bit Error Rate (QBER) of the receiver. To apply this performance test, an optical setup was arranged and a circuit was designed and implemented to calculate the QBER. This electronic circuit is used to calculate the number of counts per second generated by the avalanche photodiodes set in the receiver. The calculated counts per second are used to calculate the QBER for the receiver that gives an indication for the performance of the receiver. Minimum QBER, 6%, was obtained with avalanche photodiode excess voltage equals to 2V and laser diode power of 3.16 nW at avalanche photodiode temperature of -10
... Show MoreBeen in this gravel study the effect of Alchgag fast neutrons emitted by the source on the electrical properties of silicon solar cells monounsaturated crystal at a constant rate of neutron flow rate of a wide range of neutron flow speed ranges for periods of time ranging from 2-10 hours