Globally, Sustainability is very quickly becoming a fundamental requirement of the construction industry as it delivers its projects; whether buildings or infrastructures. Throughout more than two decades, many modeling schemes, evaluation tools, and rating systems have been introduced en route to realizing sustainable construction. Many of these, however, lack consensus on evaluation criteria, a robust scientific model that captures the logic behind their sustainability performance evaluation, and therefore experience discrepancies between rated results and actual performance. Moreover, very few of the evaluation tools available satisfactorily address infrastructure projects. The research introduces a system engineering model that abstracts the environment, the construction product, and its production system as three interacting systems that exchange materials, energy, and information. The model utilizes this setup to capture and quantify essential flows exchanged between such three systems, to evaluate sustainability. The research walks through the development of a generic case of the model, and then demonstrates its utility in evaluating the sustainability performance of civil infrastructure projects. The developed model will address an identified gap within the current body of knowledge by considering infrastructure projects. Through the ability to simulate different scenarios, the model will enable identifying which activities, products, and processes impact the environment more, and hence potential areas for optimization and improvement.
The aim of the research is to determine the impact of evaluating the investment projects in the development and preparation of investment budgets prepared by the economic units, since the investment projects are of an important and vital nature of the economic units, because these projects include the length of time for preparation and implementation and the accompanying period of this risk and uncertainties as well as need To the many funds to complete the project , The process of evaluating the implemented projects, which have been prepared an investment budget previously will contribute to the extent of matching the estimated data with the actual results or deviations, which is a step to avoid these errors in future p
... Show MoreMany risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected
Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
Currently and under the COVID-19 which is considered as a kind of disaster or even any other natural or manmade disasters, this study was confirmed to be important especially when the society is proceeding to recover and reduce the risks of as possible as injuries. These disasters are leading somehow to paralyze the activities of society as what happened in the period of COVID-19, therefore, more efforts were to be focused for the management of disasters in different ways to reduce their risks such as working from distance or planning solutions digitally and send them to the source of control and hence how most countries overcame this stage of disaster (COVID-19) and collapse. Artificial intelligence should be used when there is no practica