The aim of the research is to determine the impact of evaluation of investment projects after the preparation of investment budgets taking into consideration within the investment budgets the concept of competitive strategy, as the harmony between the preparation of investment budgets and competitive strategy will contribute to the success of economic unity and achieve profits well and achieve a competitive advantage. Strategies for economic units because the most important factor to them is the costs produced and the progress of the research problem is focused on "Is it possible to include a strategy of competition, especially within the investment budget when prepared The study concluded that the investment plan prepared by the
... Show MoreEstablishing sustainable cities and residential neighborhoods requires the development of new planning strategies, as adopting sustainable planning strategies when planning urban land uses for residential neighborhoods is necessary due to the large number of urban land use problems that have emerged during urbanization. The most prominent modern concept concerned with the land was the concept of sustainability, as sustainable planning aspires to link knowledge with sustainability through measures to achieve it. Therefore, sustainable planning works to apply the principles of sustainability in planning.
And in view of the circumstances that our country went through, which negatively affected various sectors and aspects of life, in
... Show MoreA fixed firefighting system is a key component of fire safeguarding and reducing fire danger. It is installed as a permanent component in a structure to protect the entire or a portion of the building and its contents. The study aims to review the previous studies that deal with the evaluation of fire safety measures and their use in resolving problems associated with fire threats in buildings. For this reason, a number of previous studies in this field were reviewed compared with the NFPA code. The findings revealed that regulatory developments over the last several decades had created an atmosphere conducive to innovation. This has resulted in a growth in the number of fixed firefighting system types now obtainable. Th
... Show Morehave suffered from deteriorating residential neighborhoods, poor economic, social and urban living conditions of the population and deteriorating the infrastructural and superior services. These problems were the secretions of these cities' rapid urbanization. Based on the principles of sustainable urban planning and in order to achieve adequate opportunities for the lives of the population and provide them with sustainable livelihoods, policies have emerged to upgrade along the lines of community participation and programmes to reform and develop those neighbourhoods, raise their efficiency and make them livable. Thus, the problem of research was identified "The absence of a comprehensive cognitive perception of the most prominent facto
... Show MoreHuge yearly investments were made by organizations for the development and maintenance. However, it has been reported that most of the IT projects fails as it is delayed, over budget and discontinued quality. A systematic literature review (SLR) was conducted to identify the critical success factors (CSFs) for the IT projects. Nine (9) CSFs was identified from the SLR. An online survey was conducted among 103 respondents from developers and IT managers. The data was analyzed using the Statistical Package for Social Science (SPSS 22). The findings showed that the highest CSFs of IT projects is commitment and motivation. Project monitoring was found the lowest score ranked by respondents.
The purpose of this study is to avoid delays and cost changes that occur in emergency reconstruction projects especially in post disaster circumstances. This study is aimed to identify the factors that affect the real construction period and the real cost of a project against the estimated period of construction and the estimated cost of the project. The case study is related to the construction projects in Iraq. Thirty projects in different areas of construction in Iraq were selected as a sample for this study. Project participants from the projects authorities provided data about the projects through a data collection distributed survey made by the authors. Mathematical data analysis was used to construct a model to predict change
... Show MoreThe sustainability of the individual and society get great interest in contemporary studies,
Considering the rebuilding of the society cultural values as the most important goals, which
prompted many researchers to explore ways and social elements of sustainability and the most
important urban and architectural vocabulary achieving it, thus, the search will be directed
towards the human being within the social dimensions of sustainability, his belonging and
awareness of identity through the employment of local heritage in the contemporary product.
The literatures confirmed the continuity of heritage vocabulary in the contemporary product, accordingly the research problem was defined as: "The visual continuity of the her
This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show More