Concrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was corrosion of tendons, making it a relevant case study to evaluate the effect of corrosion on bridge safety. Uncertainties associated with material properties, geometry, loads and corrosion parameters are taken into account. The probabilistic models of the uncertainties are combined with a non-linear finite element analysis to study the effect of tendons pitting corrosion on the post-tensioned concrete bridge. The limit state function considered is flexural strength. The Monte-Carlo simulation (MCS) method is used to compute the statistical parameters of the resisting bending moment through a MATLAB code running ABAQUS. It was found that the reliability index for the first year of bridge service life is below the minimum value acceptable for structures. The study confirmed that this bridge was a high risk structure due to its design and location. The proposed framework can be used by engineers and researchers as a tool to support decision for segmental post-tensioned (PT) bridges maintenance since they need for a regular inspection due to their risk to corrosion.
The research aims at the possibility of measuring the technical and scale efficiency (SE) of the departments of the College of Administration and Economics at the University of Baghdad for a period lasting 8 years, from the academic year 2013-2014 to 2018-2019 using the method of Applied Data Analysis with an input and output orientation to maintain the distinguished competitive position and try to identify weaknesses in performance and address them. Nevertheless, the research problem lies in diagnosing the most acceptable specializations in the labor market and determining the reasons for students’ reluctance to enter some departments. Furthermore, the (Win4DEAp) program was used to measure technical and scale efficiency (SE) and rely on
... Show MoreIn this study, the effect of the combination of micro steel fibers and additives (calcium hydroxide and sodium carbonate) on the size of cracks formation and healing them were investigated. This study aims to apply the use of self-healing phenomenon to repair cracks and to enhance the service life of the concrete structures. Micro steel fibers straight type were used in this research with 0.2% and 0.4% by volume of concrete. A weight of 20 and 30 kg/m3 of Ca(OH)2 and 2 and 3 kg/m3 of Na2CO3 were used as a partial cement replacement. The results confirm that the concrete cracks were significantly self-healed up to 30 days re-curing. Cracks width up to 0.2 mm were comp
... Show MoreThe purpose of this research shed light on the analysis of the relationship between the knowledge gap and the strategic performance gap and diagnose the level of impact this relationship in building a learning organization, and sought search to achieve a number of goals, cognitive and Applied been tested nature of the relationship and effect between variables in a sample size (62) of the managers of banks civil in Baghdad (Baghdad, Gulf, Assyria, Union, Elaf) and focused research problem in question is bold is whether the analysis of the relationship between the knowledge gap and the performance gap strategic leads to recognize organizations need to shift to organizations educated, either in the side of the field was the pr
... Show MoreImproving the accuracy of load-deformation behavior, failure mode, and ultimate load capacity for reinforced concrete members subjected to in-plane loadings such as corbels, wall to foundation connections and panels need shear strength behavior to be included. Shear design in reinforced concrete structures depends on crack width, crack slippage and roughness of the surface of cracks.
This paper illustrates results of an experimental investigation conducted to investigate the direct shear strength of fiber normal strength concrete (NSC) and reactive powder concrete (RPC). The tests were performed along a pre-selected shear plane in concrete members named push-off specimens. The effectiveness of concrete compressiv
... Show MoreThis paper describes flexural behavior of two spans continuous rectangular concrete beams reinforced with mild steel and partially prestressing strands, to evaluate using different prestressing level and prestressing area in continuous prestressed beams at serviceability and ultimate stages. Six continuous concrete beams with 4550 mm length reinforced with mild steel reinforcement and partially prestressed with two prestressing levels of (0.7fpy or 0.55fpy.) of and different amount of 12.7 mm diameter seven wire steel strand were used. Test results showed that the partially prestressed reinforced beams with higher prestressing level exhibited the narrowest crack width, smallest deflection and strain in both steel and concrete at ul
... Show MoreFour different spectrophotometric methods are used in this study for the determination of Sulfamethoxazole and sulfanilamide drugs in pharmaceutical compounds, synthetic samples, and in their pure forms. The work comprises four chapters which are shown in the following: Chapter One: Includes a brief for Ultraviolet-Visible (UV-VIS) Absorption spectroscopy, antibacterial drugs and sulfonamides with some methods for their determination. The chapter lists two methods for optimization; univariate method and multivariate method. The later includes different types, two of these were mentioned; simplex method and design of experiment method. Chapter Two: Includes reaction of the two studied drugs with sodium nitrite and hydrochloric acid for diazo
... Show MoreConstruction joints are stopping places in the process of placing concrete, and they are required because in many structures it is impractical to place concrete in one continuous operation. The amount of concrete that can be placed at one time is governed by the batching and mixing capacity and by the strength of the formwork. A good construction joint should provide adequate flexural and shear continuity through the interface.
In this study, the effect of location of construction joints on the performance of reinforced concrete structural elements is experimentally investigated.
Nineteen beam specimens with dimensions of 200×200×950 mm were tested. The variables investigated are the location of the construction joints
... Show MoreThe aim of this study is to propose reliable equations to estimate the in-situ concrete compressive strength from the non-destructive test. Three equations were proposed: the first equation considers the number of rebound hummer only, the second equation consider the ultrasonic pulse velocity only, and the third equation combines the number of rebound hummer and the ultrasonic pulse velocity. The proposed equations were derived from non-linear regression analysis and they were calibrated with the test results of 372 concrete specimens compiled from the literature. The performance of the proposed equations was tested by comparing their strength estimations with those of related existing equations from literature. Comparis
... Show More