Concrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was corrosion of tendons, making it a relevant case study to evaluate the effect of corrosion on bridge safety. Uncertainties associated with material properties, geometry, loads and corrosion parameters are taken into account. The probabilistic models of the uncertainties are combined with a non-linear finite element analysis to study the effect of tendons pitting corrosion on the post-tensioned concrete bridge. The limit state function considered is flexural strength. The Monte-Carlo simulation (MCS) method is used to compute the statistical parameters of the resisting bending moment through a MATLAB code running ABAQUS. It was found that the reliability index for the first year of bridge service life is below the minimum value acceptable for structures. The study confirmed that this bridge was a high risk structure due to its design and location. The proposed framework can be used by engineers and researchers as a tool to support decision for segmental post-tensioned (PT) bridges maintenance since they need for a regular inspection due to their risk to corrosion.
One of the most important challenges facing the designers of the sewerage system is the corrosion of sewers due to the influence of sewerage contaminates which lead to failure of the main lines of sewers. In this study, a reference mix of 1: 1.5: 3 was used and the 4% Flocrete PC200 by weight of cement was added to the same mixing ratio in the second mixture. Twenty-four samples were tested for each mixture, 12 of which were used to compression strength test in ages (7, 14 and 28) day and six samples were submerged after 28 days of wet treatment at (5 and 10) % concentrations of sulfuric acid. The other six samples were painted after 28 days of wet treatment with coating Polyurethane and after 24 hours were flooded with a concentrat
... Show MoreAs human societies grow, the problem of waste management becomes one of the pressing issues that need to be addressed. Recycling and reuse of waste are effective waste management measures that prevent pollution and conserve natural resources. In this study, the possibility of using glass waste as an alternative was used as a partial weight substitute for fine aggregates with replacement ratios of 10, 20, 30, and 40% by the weight, and formed into test models (15 cm * 15 cm ) cube and (15 cm * 30 cm) cylinder, then matured and tested their strength compression and tensile strength at the age of 7 and 28 days and compared with a reference or conventional concrete with a mixing ratio (1: 1.5: 3) as well as testing its worka
... Show MoreMoisture-induced damage is one of the primary causes of premature distress in asphalt pavements, leading to reduced service life and increased maintenance costs. Although nanomaterials have shown potential in enhancing asphalt performance, the underlying composite interaction mechanisms among nanomaterials, asphalt binder, and aggregate phases under moisture exposure are still not fully understood. In addition, comparative evaluations under consistent experimental conditions remain limited. This study investigates the influence of five nanomaterials: nano-silica (NS), nano-alumina (NA), nano-titanium dioxide (NT), nano-zinc oxide (NZ), and carbon nanotubes (CNT) on the physical and mechanical properties of asphalt binders and mixtur
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreThis paper provides a review of scholarly research on the depiction of hostility in critical media discourse analysis. The study is intended to analyze how hostility is differently portrayed and manifested in media discourse. The review begins by defining the multifaceted concept of hostility, encompassing cognitive, emotive, and behavioral dimensions. It then outlines the systematic process used to identify, gather and purposely select 30 relevant articles to hostility in media discourse. The method involves selecting 100 initial articles and gradually refining them to 30 articles that specifically address the themes of racism, anger, hate speech, prejudice, and aggression. These articles are sourced from diverse academic journals
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event
The spatial variation of regional development means that some regions to be a center of activities and services and job opportunities and economic development, and are usually in major urban centers, while lacking in other regions to such activities and services. Perhaps the studies of spatial variation SPATIAL INEQUALITY, regional development, REGIONAL DEVELOPMENT has had the greatest impact on the operations of regional planning in particular the study of the regional dimension of any city requires that you review the basis and theoretical framework, which refers to the inevitability of the existence of disparities across regions, due to the properties of the regions population and economic political and environmental The study
... Show MoreTransient displacement of laminated plates under combined load based on Mantari' s displacement field are investigated. The solution is implemented under transient mechanical load (sinusoidal, step and triangular sinusoidal distributed pressures pulse) and thermal buckling for plates with different layer orientation and thickness ratio. Equations of motion based on higher-order theory are derived through Hamilton' s principle, and solved using Naviertype solution for simply supported laminated plates. The results are presented for many effective parameters such as the number of laminate and orientation on the dynamic response of plates. Results show the validity of this displacement field in studying response of laminated thick and
... Show More