Concrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was corrosion of tendons, making it a relevant case study to evaluate the effect of corrosion on bridge safety. Uncertainties associated with material properties, geometry, loads and corrosion parameters are taken into account. The probabilistic models of the uncertainties are combined with a non-linear finite element analysis to study the effect of tendons pitting corrosion on the post-tensioned concrete bridge. The limit state function considered is flexural strength. The Monte-Carlo simulation (MCS) method is used to compute the statistical parameters of the resisting bending moment through a MATLAB code running ABAQUS. It was found that the reliability index for the first year of bridge service life is below the minimum value acceptable for structures. The study confirmed that this bridge was a high risk structure due to its design and location. The proposed framework can be used by engineers and researchers as a tool to support decision for segmental post-tensioned (PT) bridges maintenance since they need for a regular inspection due to their risk to corrosion.
Water absorbent polymers (WAP) are new component in producing building materials. They provide internal curing which reduces autogenous cracking, eliminates autogenous shrinkage, mortar strength increased, enhance early age strength to withstand strain, improve the durability, introduce higher early age compressive strength, have higher performance and reduce the effect of insufficient external curing. This research used different percent of polymer balls to choose the percent that provides good development in compressive strength with time for both water and air curing. The water absorption polymer balls in this research have the ability to absorb water and after usage in concrete they spill out the water (internal curing) and shri
... Show MoreThis paper provides a review of scholarly research on the depiction of hostility in critical media discourse analysis. The study is intended to analyze how hostility is differently portrayed and manifested in media discourse. The review begins by defining the multifaceted concept of hostility, encompassing cognitive, emotive, and behavioral dimensions. It then outlines the systematic process used to identify, gather and purposely select 30 relevant articles to hostility in media discourse. The method involves selecting 100 initial articles and gradually refining them to 30 articles that specifically address the themes of racism, anger, hate speech, prejudice, and aggression. These articles are sourced from diverse academic journals
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event
The spatial variation of regional development means that some regions to be a center of activities and services and job opportunities and economic development, and are usually in major urban centers, while lacking in other regions to such activities and services. Perhaps the studies of spatial variation SPATIAL INEQUALITY, regional development, REGIONAL DEVELOPMENT has had the greatest impact on the operations of regional planning in particular the study of the regional dimension of any city requires that you review the basis and theoretical framework, which refers to the inevitability of the existence of disparities across regions, due to the properties of the regions population and economic political and environmental The study
... Show MoreThere are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even
... Show MoreTo achieve sustainability in the field of civil engineering, there has become a great interest in developing reactive powder concrete RPC through the use of environmentally friendly materials to reduce the release of CO2 gas produced from cement factories as well as contribute to the recycling of industrial wastes that have a great impact on environmental pollution.
In this study, reactive powder concrete was prepared using total binder content of 800 kg/m3, water to binder ratio (0.275), and micro steel fibers 1% by volume of concrete. The experimental program included replacing fly ash with (8, 12, 16) % by cement weight to find the optimal ratio, which achieved the best mechanical proper
... Show More