The Dynamic Load Factor (DLF) is defined as the ratio between the maximum dynamic and static responses in terms of stress, strain, deflection, reaction, etc. DLF adopted by different design codes is based on parameters such as bridge span length, traffic load models, and bridge natural frequency. During the last decades, a lot of researches have been made to study the DLF of simply supported bridges due to vehicle loading. On the other hand, fewer works have been reported on continuous bridges especially with skew supports. This paper focuses on the investigation of the DLF for a highly skewed steel I-girder bridge, namely the US13 Bridge in Delaware State, USA. Field testing under various load passes of a weighed load vehicle was used to validate full-scale three-dimensional finite element models and to evaluate the dynamic response of the bridge more thoroughly. The results are presented as a function of the static and dynamic tensile and compressive stresses and are compared to DLF code provisions. The result shows that most codes of practice are conservative in the regions of the girder that would govern the flexural design. However, the DLF sometimes exceeds the code-recommended values in the vicinity of skewed supports. The discrepancy of the DLF determined based on the stress analysis of the present study, exceeds by 13% and 16% the values determined according to AASHTO (2002) for tension and compression stresses respectively, while, in comparison to BS5400, the differences reach 6% and 8% respectively.
The steel industry sector is witnessing an obvious growth in most worldwide nations and gulf countries. We wish that Iraq would be one of these superiors that go on along field to develop the construction industry in Iraq. Hence we need to notify that the government attention should be equivalent to the importance of steel industry and other industries would depend on this one, it should be presented the full support to the general sector, which is represented by ministry of industry and its institutions throughout the suitable legislation and facilities for the private companies are already into that, and they might record progress in this field. this study aims to use scrap steel as raw materials in manufacturing iron steel such war remai
... Show MoreIn diabetes, impaired wound healing and other tissue abnormalities are considered major concerns. Many factorsaffect the time and quality of wound healing. One of the purposes of medical sciences is wound healing in a short time withreduced side effects. The herbal products are more precious in both prophylaxis as well as curative in delayed diabetic woundhealing activity when compared to synthetic drugs.A wide range of evidence has shown that capers plant possesses differentbiological effects, including antioxidant, anticancer and antibacterial effects. Phytochemical analysis shows thatC. spinosahashigh quantities of bioactive constituents, including polyphenolic compounds, which are responsible for its health-promotingeffects. The healing
... Show Moreمن أجل فهم دور سلطنة عُمان في المفاوضات الإقليمية والوساطة وحل النزاعات يجب تقدير سياستها الخارجية، والتي سيتم تقييمها من أجل فهم كيفية نشأتها وتشكلها وأثر ذلك على مواقفها السياسية طوال سنوات حكم السلطان الراحل قابوس بن سعيد. وتقع عُمان في منطقة مضطربة، وقد طُلب منها في عدة مناسبات أن تعمل كمفاوض أو وسيط في الصراعات الإقليمية. سيبحث هذا البحث في كيفية قيام السلطنة بالوساطة الدولية، خاصة في الصراع الأمريكي
... Show MoreBaghdad Metro is a vital project to fulfill the rapidly increased traffic volume requirements. The proposed metro will connect both sides of Baghdad City, passing under the Tigris River. This study is employed finite elements software (PLAXIS 3D) to evaluate the seepage force developed around the sub-river segment during different construction stages and for other water levels of Tigris. The study found that when the water level changes from maximum to minimum, the developed seepage force decreases by (8 to 13%) and (22 to 27%) respectively. The seepage forces were found to be maximum during the excavation stage. The concrete lining process led to a noticeable reduction in seepage forces at all locations. The study also
... Show MoreAn essential tool for studying the web is its ability to show how energy moves through an ecosystem. Understanding and elucidating the relationship between species variety and their placement within the inclusive trophic dynamics is also beneficial. A food web ecological model with prey and two rival predators under fear and wind flow conditions is developed in this article. The boundedness and positivity of the system’s solution are established mathematically. The stability and existence constraints of the system’s equilibria are examined. The proposed system’s persistence limitations are established. Additionally, the bifurcation analysis of every potential equilibrium is examined using the Sotomayor theorem. To describe the
... Show MoreThe load shedding scheme has been extensively implemented as a fast solution for unbalance conditions. Therefore, it's crucial to investigate supply-demand balancing in order to protect the network from collapsing and to sustain stability as possible, however its implementation is mostly undesirable. One of the solutions to minimize the amount of load shedding is the integration renewable energy resources, such as wind power, in the electric power generation could contribute significantly to minimizing power cuts as it is ability to positively improving the stability of the electric grid. In this paper propose a method for shedding the load base on the priority demands with incorporating the wind po
... Show MoreConcrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was c
... Show More