The purpose of this paper is to study the instability of the zero solution of some type of nonlinear delay differential equations of fourth order by using the Lyapunov-Krasovskii functional approach; we obtain some conditions of instability of solution of such equation.
As the reservoir conditions are in continuous changing during its life, well production rateand its performance will change and it needs to re-model according to the current situationsand to keep the production rate as high as possible.Well productivity is affected by changing in reservoir pressure, water cut, tubing size andwellhead pressure. For electrical submersible pump (ESP), it will also affected by numberof stages and operating frequency.In general, the production rate increases when reservoir pressure increases and/or water cutdecreases. Also the flow rate increase when tubing size increases and/or wellhead pressuredecreases. For ESP well, production rate increases when number of stages is increasedand/or pump frequency is
... Show Moreأدى التغير السريع في البيئة الخارجية للمنظمة إلى ظهور حالة من التنافس الشديد مما زاد تخوف الشركات من فقدان الحصة السوقية والخسارة . مما حدا بالمنظمات إلى الاهتمام بوجود مدير يحمل صفات وخصائص قيادية لما فيه من ميزات في تنظيم الإنتاج ومقابلة الطلب وتقليل التكاليف وتطوير الأداء للحصول على ميزة تنافسية تحافظ او تزيد من حصتها السوقية وإرباحها .
تسعى الدراسة الى تحديد عدد من الاهداف كان اهمها معرفة الع
... Show MoreThe topic of the research on the Observatory of the Walls on Jurisprudential Matters in the Hanafi Fiqh, by Imam San’a Allah bin Ali bin Khalil Al-Ala’iyya Wai al-Naqshbandi, al-Rumi, who died in 1137 AH, which includes seven chapters, the first section of it concerning division and related matters, and the second section in the adaptation It is the apportionment of benefits in common objects, the third section, which pertains to lines, surfaces, and bodies, the fourth section, which concerns the inclined wall and certification, and the fifth section, which concerns the provisions of the walls and its claims, and the sixth section, which concerns the door of roads and doors, the opening of the skylight, the sails of the wing, the can
... Show MoreThe main objective of this research is to find the coefficient of permeability (k) of the soil and especially clayey soil by finding the degree of consolidation (rate of consolidation). New modify procedure is proposed by using the odometer (consolidation) device. The ordinary conventional permeability test usually takes a long time by preparing and by testing and this could cause some problems especially if there is a need to do a large number of this test and there were a limited number of technicians and/or apparatus. From this point of view the importance of this research is clear, since the modified procedure will require a time of 25 minute only. Derivation made to produce an equation which could be used to fined the permeabi
... Show MoreThe aim of this study was to investigate the effectiveness of binary solvent for regeneration of spent lubricating oil by extraction-flocculation process. The regeneration was investigated by bench scale experiments by using locally provided solvents (Heavy Naphtha, n-Butanol, and iso-Butanol). Solvents to used oil, mixing time, mixing speed and temperatures were studied as operating parameters. The performance on three estimated depended key parameters, namely the percentage of base oil recovered (Yield), percent of oil loss (POL), and the percent of sludge removal (PSR) were used to evaluate the efficiency of the employed binary solvent on extraction process. The best solvent to solvent ratio for binary system were 30:70 for Heavy Naph
... Show MoreMany problems are facing the installation of piles group in laboratory testing and the errors in results of load and settlement are measured experimentally may be happened due to select inadequate method of installation of piles group. There are three main methods of installation in-flight, pre-jacking and hammering methods. In order to find the correction factor between these methods the laboratory model tests were conducted on small-scale models. The parameters studied were the methods of installation (in-flight, pre-jacking and hammering method), the number of piles and in sandy soil in loose state. The results of experimental work show that the increase in the number of piles value led to increase in load carrying capacity of piled raft
... Show More