Preferred Language
Articles
/
NhY-IIcBVTCNdQwCnjmN
Geological Modeling and Resource Estimation for Mishrif Formation in Nasiriyah Oilfield
...Show More Authors

Resource estimation is an essential part of reservoir evaluation and development planning which highly affects the decision-making process. The available conventional logs for 30 wells in Nasiriyah oilfield were used in this study to model the petrophysical properties of the reservoir and produce a 3D static geological reservoir model that mimics petrophysical properties distribution to estimate the stock tank oil originally in place (STOOIP) for Mishrif reservoir by volumetric method. Computer processed porosity and water saturation and a structural 2D map were utilized to construct the model which was discretized by 537840 grid blocks. These properties were distributed in 3D Space using sequential Gaussian simulation and the variation in OWC depth was represented by 3 initialization regions for better characterization. The total STOOIP of Mishrif reservoir in Nasiriyah oilfield was estimated to be 8951 MMSTB which is divided between two reservoir units: MB1 and MB2 in which the first contains approximately 75% of total STOOIP and the latter has the remaining 25%.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Engineering And Sustainable Development
NEW TRENDS FOR ANGLE OF ARRIVAL ESTIMATION
...Show More Authors

View Publication
Crossref
Publication Date
Tue Mar 01 2011
Journal Name
Journal Of Economic And Administrative Science
On Shrinkage Estimation for Generalized Exponential Distribution
...Show More Authors

Preview PDF
Publication Date
Wed May 10 2023
Journal Name
Journal Of Engineering
Cross Dipole Antennas Solution for Angle of Arrival Estimation
...Show More Authors

The Multiple Signal Classification (MUSIC) algorithm is the most popular algorithm to estimate the Angle of Arrival (AOA) of the received signals. The analysis of this algorithm (MUSIC) with typical array antenna element ( ) shows that there are two false direction indication in the plan
aligned with the axis of the array. In this paper a suggested modification on array system is proposed by using two perpendiculars crossed dipole array antenna in spite of one array antenna. The suggested modification does not affect the AOA estimation algorithm. The simulation and results shows that the proposed solution overcomes the MUSIC problem without any effect on the performance of the system.

View Publication Preview PDF
Crossref
Publication Date
Thu Nov 29 2018
Journal Name
Al-khwarizmi Engineering Journal
Surface Roughness Prediction for Steel 304 In Edm Using Response Graph Modeling
...Show More Authors

Electrical Discharge Machining (EDM) is a non-traditional cutting technique for metals removing which is relied upon the basic fact that negligible tool force is produced during the machining process. Also, electrical discharge machining is used in manufacturing very hard materials that are electrically conductive. Regarding the electrical discharge machining procedure, the most significant factor of the cutting parameter is the surface roughness (Ra). Conventional try and error method is time consuming as well as high cost. The purpose of the present research is to develop a mathematical model using response graph modeling (RGM). The impact of various parameters such as (current, pulsation on time and pulsation off time) are studied on

... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Thu Jan 01 2015
Journal Name
Mj Journal On Applied Mathematics
Mathematical models for estimation the concentration of heavy metals in soil
...Show More Authors

Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Jun 30 2016
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Modelling and Optimization of Carbon Steel Corrosion in CO2 Containing Oilfield Produced Water in Presence of HAc
...Show More Authors

Previously, many empirical models have been used to predict corrosion rates under different CO2 corrosion parameters conditions. Most of these models did not predict the corrosion rate exactly, besides it determined effects of variables by holding some variables constant and changing the values of other variables to obtain the regression model. As a result the experiments will be large and cost too much. In this paper response surface methodology (RSM) was proposed to optimize the experiments and reduce the experimental running. The experiments studied effects of temperature (40 – 60 °C), pH (3-5), acetic acid (HAc) concentration (1000-3000 ppm) and rotation speed (1000-1500 rpm) on CO2 corrosion performance of t

... Show More
View Publication Preview PDF
Publication Date
Wed Jan 07 2015
Journal Name
World Journal Of Experimentalbiosciences
Biofilm formation and antibiotic susceptibility for clinical and environmental isolates of Pseudomonas aeruginosa
...Show More Authors

Pseudomonas aeruginosa is emerging opportunistic clinical pathogens. Clinical isolates of P. aeruginosaresist wide spectrum of antibiotics and form biofilm. The comparison study between clinical and environmental of P. aeruginosa in terms of biofilm formation and antibiotic resistance is very scanty. Thus, in current study microtiter plate technique was used to measure the biofilm formation by several clinical and environmental isolates. Moreover, the antibiotic susceptibility of these bacteria was evaluated by VITIK 2 techniques. The relationship between the antibiotic susceptibility and biofilm formation was evaluated for clinical and environmental isolates. Clinical and environm

... Show More
Publication Date
Mon Jul 31 2023
Journal Name
Iraqi Geological Journal
Building of a Static Model for Jeribe Formation in Jambour Oil Field
...Show More Authors

The Jeribe Formation, the Jambour oil field, is the major carbonate reservoir from the tertiary reservoirs of the Jambour field in northern Iraq, including faults. Engineers have difficulty organizing carbonate reserves since they are commonly tight and heterogeneous. This research presents a geological model of the Jeribe reservoir based on its facies and reservoir characterization data (Permeability, Porosity, Water Saturation, and Net to Gross). This research studied four wells. The geological model was constructed with the Petrel 2020.3 software. The structural maps were developed using a structural contour map of the top of the Jeribe Formation. A pillar grid model with horizons and layering was designed for each zone. Followin

... Show More
View Publication
Scopus (5)
Crossref (1)
Scopus Crossref
Publication Date
Tue Jan 21 2025
Journal Name
Procedia Environmental Science, Engineering And Management
Optimizing Radiofrequency Parameters for Effective Lesion Formation in Patients with Supraventricular Tachycardia
...Show More Authors

Radiofrequency catheter ablation is now widely recognized as a primary treatment for a range of arrhythmias and serves as the first-line therapy fo...

View Publication
Scopus