At a time of increasing human potential in the face of crises and risks through the use of technology on a large scale and steadily in various fields of life, and the vulnerability of business organizations as a result of mistakes. The failure of a sudden these errors or omissions or symptoms. Also, some crises occur outside the control of management, others caused by leakage of important information and sometimes secret may be a strategy or a new plan or new project occurs outside the organization to the opposite of what is planned. Therefore, the crisis management are critical to all organizations, because the active management of the crisis helps to ensure the continued prosperity of the organization. Here comes from the resea
... Show MoreArtificial roughness on the absorber plate of a Solar Air Heater (SAH) is a popular technique for increasing its effective efficiency. The study investigated the effect of geometrical parameters of discrete multi-arc ribs (DMAR) installed below the SAH absorber plate on the effective efficiency. The effects of major roughness factors, such as number of gaps (Ng = 1-4), rib pitch (p/e = 4-16), rib height (e/D = 0.018-0.045), gab width (wg/e = 0.5-2), angle of attack ( = 30-75), and Reynolds number (Re= 2000-20000) on the performance of a SAH are studied. The performance of the SAH is evaluated using a top-down iterative technique. The results show that as Re rises, SAH-effective DMAR's efficiency first ascends to a specified value o
... Show MoreIn the geotechnical and terramechanical engineering applications, precise understandings are yet to be established on the off-road structures interacting with complex soil profiles. Several theoretical and experimental approaches have been used to measure the ultimate bearing capacity of the layered soil, but with a significant level of differences depending on the failure mechanisms assumed. Furthermore, local displacement fields in layered soils are not yet studied well. Here, the bearing capacity of a dense sand layer overlying loose sand beneath a rigid beam is studied under the plain-strain condition. The study employs using digital particle image velocimetry (DPIV) and finite element method (FEM) simulations. In the FEM, an experiment
... Show MoreThis search seeks to know the trends of academics in the field of Press and audio, video and read press about paper press compared with continued development and widespread deployment of web journalism. This research belongs to descriptive studies which depends on sample survey approach adopted by five-meter design measuring trends. It contains 28 items having applied honesty and reliability transaction and the scale form is distributed to the sample studied of about 110 professors and then the researcher collects them and then applying the appropriate statistical program to get the results. This search seeks to know the trends of academics in the field of Press and audio, video and read press about paper press compared with continu
... Show MoreAl-Rustamiya sewage treatment plant (WWTP) serves the east side of Baghdad city (Rusafa) and is considered one of the largest projects.It consists of three parts (old project F0, first extension F1, and second extension F2) that treat wastewater and the 
effluent is discharged into Diyala river and thus into the Tigris River. These plants are designed and constructed with an aim to manage wastewater to reachIraqi effluent standard for BOD5, COD, TSS and chloride concentrations of 40, 100, 60 and 600 
mg/L respectively. The data recordedfrom March till December 2011 provided from Al-RustamiyaWWTP, were considered in this study to evaluate the performance of the plant. The results indicated that the strength of the wastewater enterin
Warm mix asphalt (WMA) is relatively a new technology which enables the production and compaction of asphalt concrete mixtures at temperatures 15-40 °C lower than that of traditional hot mix asphalt HMA. In the present work, six asphalt concrete mixtures were produced in the mix plant (1 ton each) in six different batches. Half of these mixes were WMA and the other half were HMA. Three types of fillers (limestone dust, Portland cement and hydrated lime) were used for each type of mix. Samples were then taken from these patches and transferred to lab for performance testing which includes: Marshall characteristics, moisture susceptibility (indirect tension test), resilient modulus, permanent deformation (axial repeated load test)
... Show MoreWarm mix asphalt (WMA) is relatively a new technology which enables the production and compaction of asphalt concrete mixtures at temperatures 15-40 °C lower than that of traditional hot mix asphalt HMA. In the present work, six asphalt concrete mixtures were produced in the mix plant (1 ton each) in six different batches. Half of these mixes were WMA and the other half were HMA. Three types of fillers (limestone dust, Portland cement and hydrated lime) were used for each type of mix. Samples were then taken from these patches and transferred to lab for performance testing which includes: Marshall characteristics, moisture susceptibility (indirect tension test), resilient modulus, permanent deformation (axial repe
... Show MoreIn this research the performance of 5G mobile system is evaluated through the Ergodic capacity metric. Today, in any wireless communication system, many parameters have a significant role on system performance. Three main parameters are of concern here; the source power, number of antennas, and transmitter-receiver distance. User equipment’s (UEs) with equal and non-equal powers are used to evaluate the system performance in addition to using different antenna techniques to demonstrate the differences between SISO, MIMO, and massive MIMO. Using two mobile stations (MS) with different distances from the base station (BS), resulted in showing how using massive MIMO system will improve the performance than the standar
... Show More