Preferred Language
Articles
/
MRZTR4gBVTCNdQwCDHa7
Influential safety technology adoption predictors in construction
...Show More Authors
Purpose

Existing literature suggests that construction worker safety could be optimized using emerging technologies. However, the application of safety technologies in the construction industry is limited. One reason for the constrained adoption of safety technologies is the lack of empirical information for mitigating the risk of a failed adoption. The purpose of this paper is to fill the research gap through identifying key factors that predict successful adoption of safety technologies.

Design/methodology/approach

In total, 26 key technology adoption predictors were identified and classified using a combination of literature review and an expert panel. The level of influence for each identified safety technology adoption predictor was assessed and ranked using the Relative Importance Index. Analysis of variance was performed as well to assess the potential difference in perceived level of importance for the predictors when the study participants were clustered according to work experience and company size.

Findings

Statistical analysis indicates that 12 out of the 26 predictors identified are highly influential regarding technology adoption decision-making in construction. Technology reliability, effectiveness and durability were ranked as the most influential predictors. The participants who work for small companies and who had less than ten years of experience rated individual- and technology-related predictors significantly lower than the experienced participants working for medium and large companies.

Practical implications

The present study provides construction researchers and practitioners with valuable information regarding safety technology predictors and their magnitude, both of which are essential elements of a successful safety technology adoption process. Improved technology adoption can enhance workplace safety and minimize worker injuries, providing substantial benefits to the construction industry.

Originality/value

This study contributes to technology adoption knowledge by identifying and quantifying the influential predictors of safety technologies in relation to different organizational contexts. The study informs the need to develop an integrated conceptual model for safety technology adoption.

Scopus Clarivate Crossref
View Publication
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Effect of Ferric Oxide on Electricity Generation and Waste Water Treatment Using Microbial Fuel Cell Technology
...Show More Authors

The aim of research is to show the effect of Ferric Oxide (Fe2O3) on the electricity production and wastewater treatment, since 2.5% of Ferric Oxide (Fe2O3) (heated and non heated) nanoparticles has been used. Characterization of nanoparticles was done using X-ray Diffraction (XRD) and Scan Electron Microscopy (SEM). The influence of acidity was also studied on both wastewater treatmenton the Chemical Oxygen demand (COD) and Biological Oxygen Demand (BOD) and voltage output was studied. From the results, it was infused that the dosage of 0.025 g/l and an initial pH 7 were founded to be optimum for the effective degradation of effluents. The results concluded that the treatment of anaerobic sludge wastewater using Ferric Oxide (Fe2O3) in

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Jul 18 2022
Journal Name
International Journal Of Early Childhood Special Education
The effectiveness of a proposed teaching strategy according to The Common Knowledge Construction Model in Mathematical Proficiency for middle school student
...Show More Authors

This research aims to know the effectiveness of teaching with a proposed strategy according to the common Knowledge construction modelin mathematical proficiency among students of the second middle class. The researchers adopted the method of the experimental approach, as the experimental design was used for two independent and equal groups with a post-test. The experiment was applied to a sample consisting of (83) students divided into two groups: an experimental comprising (42) students and a control group, the second comprising (41) students., from Badr Shaker Al-Sayyab Intermediate School for Boys, for the first semester of the academic year (2021-2022), the two groups were rewarded in four variables: (chronological age calculated in mo

... Show More
Publication Date
Mon Jan 28 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Managerial Skills and It`s Role in Strengthening the Competitive Edge of Companies: A Case Study in the General Company for Construction Industries
...Show More Authors

This research tries to reveal how to manage and control the competitive edge for business by building managerial skills in various organizational levels. Our research aims at finding out the nature of various technical, human and in tellectual skills of a new president whose superiority is his competitive ness in the application field at general company for construe tioual  industriesand testing the surveyed minor and major changes through a questionnaire to collect information from officials. The sample was composed of (45) director. The data was analyzed  using some methods and statistical programs. The most prominent of these is (SPSS) that was used to extract the arithmetic mean, standard deviation, correlation coefficient

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jan 01 2018
Journal Name
International Journal Of Science And Research (ijsr)
Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization
...Show More Authors

Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost

... Show More
Publication Date
Wed Jan 15 2025
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.

... Show More
View Publication
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Tue Feb 05 2019
Journal Name
Journal Of The College Of Education For Women
The value of work to the Elits of prophets and its influence on cultural construction
...Show More Authors

Praise be to Allah and peace and blessings be upon our Prophet Muhammad and on his family and companions
Yet,
The prophets (peace be upon them) urged all thevalues and one of these is the value of work which is of a great importance, that all nations have gathered against us as the eaters gather at a bowl. One of the reasons of our weakness and the strength of our enemy is that we have neglected the value of work. And rather a large number of ignorant and uneducatedpeople started to believe that the means of living, triumph, gaining power, and establishing a civilization are given by Allah with neithergainingnoreffort from us. While we find in the past that Allah the Almighty narrated to us the story of Mary (Peace be upon her) and

... Show More
View Publication Preview PDF
Publication Date
Sun Jun 05 2011
Journal Name
Baghdad Science Journal
Design and Construction of a Testing Platform and Estimating Attenuation Painting Reflectivity to Laser Beam
...Show More Authors

The project has been described the design and construction of a reliable optical testing platform used for evaluate the reflectivity of metal surfaces treated with special paintings required for laser beam attenuation. The platform comprises an Nd-YAG laser system which has been designed and fabricated with specifications to be compatible with their corresponding in laser range finder transmitters used for various applications. The reflectivity of various attenuating paintings, at different detection angles, has been observed. Moreover, the variation of the reflected energy with painting type and metal type to be painted has been studied experimentally. Results illustrated the existence of a definite angle, at which the reflectivity was max

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(9)
...Show More Authors

  In this work, we construct and classify the projectively distinct (k,3)-arcs in PG(2,9), where k ≥ 5, and prove that the complete (k,3)-arcs do not exist, where 5 ≤ k ≤ 13. We found that the maximum complete (k,3)-arc in PG(2,q) is the (16,3)-arc and the minimum complete (k,3)-arc in PG(2,q) is the (14,3)-arc. Moreover, we found the complete (k,3)-arcs between them.

View Publication Preview PDF
Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

  The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs.         All of these arcs are incomplete.         The number of distinct (12,3)-arcs are six, two of them are complete.         There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete.         There exists one complete (15,3)-arc.
 

View Publication Preview PDF