Increasing hydrocarbon recovery from tight reservoirs is an essential goal of oil industry in the recent years. Building real dynamic simulation models and selecting and designing suitable development strategies for such reservoirs need basically to construct accurate structural static model construction. The uncertainties in building 3-D reservoir models are a real challenge for such micro to nano pore scale structure. Based on data from 24 wells distributed throughout the Sadi tight formation. An application of building a 3-D static model for a tight limestone oil reservoir in Iraq is presented in this study. The most common uncertainties confronted while building the model were illustrated. Such as accurate estimations of cut-off permeability and porosity values. These values directly affect the calculation of net pay thickness for each layer in the reservoir and consequently affect the target of estimating reservoir initial oil in place (IOIP). Also, the main challenge to the static modeling of such reservoirs is dealing with tight reservoir characteristics which cause major reservoir heterogeneity and complexities that are problematic to the process of modeling reservoir simulation. Twenty seven porosity and permeability measurements from Sadi/Tanuma reservoir were used to validate log interpretation data for model construction. The results of the history matching process of the constructed dynamic model is also presented in this paper, including data related to oil production, reservoir pressure, and well flowing pressure due to available production.
As tight gas reservoirs (TGRs) become more significant to the future of the gas industry, investigation into the best methods for the evaluation of field performance is critical. While hydraulic fractured well in TRGs are proven to be most viable options for economic recovery of gas, the interpretation of pressure transient or well test data from hydraulic fractured well in TGRs for the accurate estimation of important reservoirs and fracture properties (e.g. fracture length, fracture conductivity, skin and reservoir permeability) is rather very complex and difficult because of the existence of multiple flow profiles/regimes. The flow regimes are complex in TGRs due to the large hydraulic fractures n
This work includes synthesis of sugar tetrazole derivative, D-ribose reacted with acetone in the presence of sulfuric acid H2SO4 to give 2, 3-O-isopropylidene-D-ribose (1). The Aldol condensation of (1) with formaldehyde in methanolic K2CO3 solution gave 2-hydroxymethyl (2, 3-O-isopropylidene-D-ribose)(2). Which was tosylated by Tosyl chloride in pyridine to yield compound (3), SN2 reaction of (3) with sodium cyanide in DMSO afforded compound (4). The [2+ 3] cycloaddition reaction of (4) with sodium azide gave the targeted compound (5). All prepared compounds have been characterized by: TLC, Specific rotation, Microelemental analysis and [FTIR and 1 H NMR spectroscopy]
In this work, a single pile is physically modeled and embedded in an upper liquefiable loose sand layer overlying a non-liquefiable dense layer. A laminar soil container is adopted to simulate the coupled static-dynamic loading pile response during earthquake motions: Ali Algharbi, Halabjah, El-Centro, and Kobe earthquakes. During seismic events with combined loading, the rotation along the pile, the lateral and vertical displacements at the pile head as well as the pore pressure ratio in loose sandy soil were assessed. According to the experimental findings, combined loading that ranged from 50 to 100% of axial load would alter the pile reaction by reducing the pile head peak ground acceleration, rotation of the pile, and lateral displacem
... Show MoreA modified water injection technique has organized by this study to improve oil recovery of the Mishrif reservoirs using polymerized alkaline surfactant water (PAS-Water) injection. It is planned to modify the existing water injection technology, first to control and balance the hazardous troublemaker reservoir facies of fifty-micron pore sizes with over 500 millidarcies permeability, along with the non-troublemaker types of less than twenty micron pore sizes with 45 to 100 millidarcies permeability. Second to control Mishrif reservoirs rock-wettability. Special core analysis under reservoir conditions of 2250 psi and 90 °C has carried out on tens of standard core plugs with heterogeneous buildup, using the proposed renewal water f
... Show MoreMany oil and gas processes, including oil recovery, oil transportation, and petroleum processing, are negatively impacted by the precipitation and deposition of asphaltene. Screening methods for determining the stability of asphaltenes in crude oil have been developed due to the high cost of remediating asphaltene deposition in crude oil production and processing. The colloidal instability index, the Asphaltene-resin ratio, the De Boer plot, and the modified colloidal instability index were used to predict the stability of asphaltene in crude oil in this study. The screening approaches were investigated in detail, as done for the experimental results obtained from them. The factors regulating the asphaltene precipitation are different fr
... Show MoreAbstract:
The research seeks to identify the role of the International Assurance Standard (3402) in the auditor's procedures, as the importance of the research stems from providing assurance services for control tools through reports that are prepared according to this standard, which contribute to strengthening audit procedures through a proposed assurance program. Many conclusions were reached, the most important of which The assurance operations are considered among the operations with a special assignme
... Show Moreيهدف البحث الى تقديم استراتيجية مقترحة لشركة نفط الشمال ، وأخذت الاستراتيجية المقترحة بنظر الاعتبار الظروف البيئية المحيطة واعتمدت في صياغتها على اسس وخطوات علمية تتسم بالشمولية والواقعية ، اذ انها غطت الانشطة الرئيسية في الشركة (نشاط الانتاج والاستكشاف , نشاط التكرير والتصفية , التصدير ونقل النفط , نشاط البحث والتطوير , النشاط المالي , تقنية المعلومات , الموارد البشرية ) وقد اعتمد نموذج (David) في التحليل البيئي
... Show MoreThe research aims to present a proposed strategy for the North Oil Company, and the proposed strategy took into account the surrounding environmental conditions and adopted in its formulation on the basis and scientific steps that are comprehensive and realistic, as it covered the main activities of the company (production and exploration activities, refining and refining activities, export and transport of oil, research and development activity, financial activity, information technology, human resources) and the (David) model has been adopted in the environmental analysis of the factors that have been diagnosed according to a
... Show MoreA new ligand [3(3(2chloroacetyl) thioureido)pyrazine-2-carboxyliIcacid](CPC)was synthesized by reaction of rized by imicro elmental analysis C.H.N.S.,FT-IR,UV-Vis and 1H-13CNMR spectra, some transition metals complex ofIthis ligand were Prepared and characterized byiFT-IR,UV-Vis spectra conductivity measurements magnetic susceptibility and atomic absorption. From the obtained results the molecular formula of all prepared complexes were[M(CPC)2](M+2i=Mn. Co, Ni, Cu, Zn, Cd and Hg),the proposedi geometrical structure for all complexes were as tetrahedral geometry except copper complex has square planer geometry.