Fire is one of the most critical risks devastating to human life and property. Therefore, humans make different efforts to deal with fire hazards. Many techniques have been developed to assess fire safety risks. One of these methods is to predict the outbreak of a fire in buildings, and although it is hard to predict when a fire will start, it is critical to do so to safeguard human life and property. This research deals with evaluating the safety risks of the existing building in the city of Samawah/Iraq and determining the appropriateness of these buildings in terms of safety from fire hazards. Twelve parameters are certified based on the National Fire Protection Association (NFPA2016) code. The concept of giving weight to each criterion was adopted to classify the criteria according to their importance and then conduct an on-site examination of these existing buildings to test the selected criteria. The result indicates a possible fire risk in these buildings due to the lack of compliance with fire safety instructions in the approved codes.
Nanopesticides are novel plant protection products offering numerous benefits. Because nanoparticles behave differently from dissolved chemicals, the environmental risks of these materials could differ from conventional pesticides. We used soil–earthworm systems to compare the fate and uptake of analytical‐grade bifenthrin to that of bifenthrin in traditional and nanoencapsulated formulations. Apparent sorption coefficients for bifenthrin were up to 3.8 times lower in the nano treatments than in the non‐nano treatments, whereas dissipation half‐lives of the nano treatments were up to 2 times longer. Earthworms in the nano treatments accumulated approximately 50% more b
Abstract
This research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project
... Show MoreFracture pressure gradient prediction is complementary in well design and it is must be considered in selecting the safe mud weight, cement design, and determine the optimal casing seat to minimize the common drilling problems. The exact fracture pressure gradient value obtained from tests on the well while drilling such as leak-off test, formation integrity test, cement squeeze ... etc.; however, to minimize the total cost of drilling, there are several methods could be used to calculate fracture pressure gradient classified into two groups: the first one depend on Poisson’s ratio of the rocks and the second is fully empirical methods. In this research, the methods selected are Huubert and willis, Cesaroni I, Cesaroni II,
... Show MoreThe reduction in the rivers capacity is one the most important issue to give the decision maker an idea during the flood season. The study area included the rivers of the Al Atshan, Al Sabeel and Euphrates, which are surveyed with a length of 21, 5 and 20 km respectively. The Euphrates , the Atshan and Al Sabeel rivers were simulated by using HEC-RAS 5.0.3 software to study the real condition within the city of Assamawa. As well as the simulation was implemented by modifying the cross sections of the Euphrates and Al Sabeel rivers to increase their capacity to 1300 and 1200 m3/s respectively which are a flood discharges100 year return periods. The results showed that the maximum discharge capacity under real conditions o
... Show MoreThis work involves the calculation of the cooling load in Iraqi building constructions taking in account the effect of the convective heat transfer inside the buildings. ASHRAE assumptions are compared with the Fisher and Pedersen model of estimation of internal convective heat transfer coefficient when the high rate of ventilation from ceiling inlet configuration is used. Theoretical calculation of cooling load using the Radiant Time Series Method (RTSM) is implemented on the actual tested spaces. Also the theoretical calculated cooling loads are experimentally compared by measuring the cooling load in these tested spaces. The comparison appears that using the modified Fisher and Pedersen model when large ventilation ra
... Show MoreBackground: A core set of checks have been incorporated into World Health Organization (WHO) WHO surgical safety checklist. Lack of access to basic surgical care remains a major concern in low-income settings.
Objective: We use a WHO surgical safety checklist items to improve team communication and cooperation to help in reduction of morbidity and mortality of surgical procedures.
Methods: This is a prospective study involving 300 patients after applying the 19 items of the surgical safety checklist with different types of operations had been operated in the surgical theater at Al-Kindy Teaching Hospital during the period 1st of September 2016
... Show More