Water quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their performance is evaluated usin
... Show MoreA mathematical method with a new algorithm with the aid of Matlab language is proposed to compute the linear equivalence (or the recursion length) of the pseudo-random key-stream periodic sequences using Fourier transform. The proposed method enables the computation of the linear equivalence to determine the degree of the complexity of any binary or real periodic sequences produced from linear or nonlinear key-stream generators. The procedure can be used with comparatively greater computational ease and efficiency. The results of this algorithm are compared with Berlekamp-Massey (BM) method and good results are obtained where the results of the Fourier transform are more accurate than those of (BM) method for computing the linear equivalenc
... Show Moreلقد كان حرص المؤلف على إصدار هذا الكتاب نابعا ً من قناعة تامة بأن مجال التقويم والقياس بحاجة إلى كتاب علمي حديث يتناول عرض أدوات الاختبار والقياس والمتمثلة بالصدق والثبات ويتسم بالوضوح في التعبير عن المفاهيم والمصطلحات والأنواع لكل منها ليكون وسيلة مبسطة بأيدي الأساتذة والباحثين وطلبتي الدراسات العليا الماجستير والدكتوراه لإستخراج صدق وثبات الاختبارات والمقاييس بطرق إحصائية متقدمة من خلال إستخدام البرنا
... Show MoreThe valley Dwiridj of drainage basins task that lies east of Iraq and thus we have in this study the application of tow models athletes on the three basins of the valley to get Mor e values accurate to Estimate the volume of runoff and peak discharge and time climax and through the use of Technology remote sensing (GIS),has been show through the application of both models, that the maximum value for the amount of Dwiridj valley of (1052/m3/s) According to Equation (SCS-CN) and about (1370.2/m3/s)by approach (GIUH) that difference is the amount of discharge to the Equation (SCS-CN) ar not accurate as(GIUH) approaches Equation ecalling the results of the Field ces Department of damand reservoirs that the volume of runoff to the valley wase
... Show MoreThis paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t
... Show MoreBackground: Bone density is a major factor that affect mini implant primarily stability; no Iraqi studies have evaluated bone density related to mini-implant placement for orthodontic anchorage at age 13 -15 years. The present research aims to evaluate gender, side and site differences in the bone density at various orthodontic implant sites for the maxillary alveolar bone. Materials and methods: Twenty nine individuals (16 males and 13 females) had subjected to clinical examination, then 64-multislice computed tomography scan data were evaluated and bone density was measured in Hounsfield unit at 21 points (9 points for each side and 3 points between the right and left central incisors) . Results: The results obtained showed that there ar
... Show MoreWater quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their perfor
... Show MoreIn this study, a one-dimensional model represented by Butler-Volmer-Monod (BVM) model was proposed to compute the anode overpotential and current density in a mediator-less MFC system. The system was fueled with various organic loadings of real field petroleum refinery oily sludge to optimize the favorable organic loading for biomass to operate the suggested system. The increase in each organic loading showed higher resistance to electrons transport to the anode represented by ohmic loss. On the contrary, both activation and mass transfer losses exhibited a noticeable decrement upon the increased organic loadings. However, current density was improved throughout all increased loads achieving a maximum current density of 5.2 A/m3
... Show More