Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time with the available funds. The model has been tested in multi scenarios, and the results are analyzed. The results show that negative cash flow is minimized from −693,784 to −634,514 in enterprise I and from −2,646,408 to −2,529,324 in enterprise II in the first scenario and also results show that negative cash flow is minimized to −612,768 with a profit of +200,116 in enterprise I and to −2,597,290 with a profit of +1,537,632 in enterprise II in the second scenario.
A field experiment was carried out in the fields of the Field Crops Department - Faculty of Agricultural Engineering Sciences. The study included five inbred lines (ZM43W (ZE), ZM60, ZM49W3E, ZM19, CDCN5), given numbers 1, 2, 3, 4 and 5) to study the hybrid vigor and both general and special combing ability (GCA, SCA) of the half diallel mating method, for the spring and fall seasons (2016). The genetic analysis shows that all crosses gave a positive hybrid vigor for grain yield per unit area at the two population densities. the highest value is 116.20% for cross (3´5 )at low density, and 89.22% for cross( 1´4 )at high density. The hybrid vigor for all crosses is positive at two densities for dry matter yield, crop growth rate an
... Show MoreIt is well-known that the existence of outliers in the data will adversely affect the efficiency of estimation and results of the current study. In this paper four methods will be studied to detect outliers for the multiple linear regression model in two cases : first, in real data; and secondly, after adding the outliers to data and the attempt to detect it. The study is conducted for samples with different sizes, and uses three measures for comparing between these methods . These three measures are : the mask, dumping and standard error of the estimate.
Multiple myeloma (MM) is a heterogenous plasma cell malignancy with various complications. Sclerostin is a Wingless-type (Wnt) inhibitor specifically expressed by osteocytes; it acts as a negative regulator of bone formation.
To assess plasma sclerostin level in MM patients and find its correlations with clinical and laboratory data, including osteolytic bone disease and international staging system (ISS).
This cr
In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.
Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.
Introduction
Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi
... Show MoreThe cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost management, the types of housing cost, the method
... Show MoreThe execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman
... Show MoreThe Objective of the research is to identify the Strategic Vigilance and effect in the Managerial Decision Quality, by knowing the interest of the organization influence the Strategic Vigilance in the Managerial Decision Quality, adopted four dimensions of the Strategic Vigilance is (Environmental Vigilance, Commercial, Competitiveness & Technology) to indicate the extent individually and collectively impact in the Managerial Decision Quality, The questionnaire was used as a main tool to survey the views of a sample of 45 managers, was named Supreme Judicial Council society for research, and the statistical program SPSS, and research found a clear positive impact dimensions Strategic Vigilance in the Manageri
... Show MoreMassive multiple-input multiple-output (massive-MIMO) is considered as the key technology to meet the huge demands of data rates in the future wireless communications networks. However, for massive-MIMO systems to realize their maximum potential gain, sufficiently accurate downlink (DL) channel state information (CSI) with low overhead to meet the short coherence time (CT) is required. Therefore, this article aims to overcome the technical challenge of DL CSI estimation in a frequency-division-duplex (FDD) massive-MIMO with short CT considering five different physical correlation models. To this end, the statistical structure of the massive-MIMO channel, which is captured by the physical correlation is exploited to find sufficiently