Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time with the available funds. The model has been tested in multi scenarios, and the results are analyzed. The results show that negative cash flow is minimized from −693,784 to −634,514 in enterprise I and from −2,646,408 to −2,529,324 in enterprise II in the first scenario and also results show that negative cash flow is minimized to −612,768 with a profit of +200,116 in enterprise I and to −2,597,290 with a profit of +1,537,632 in enterprise II in the second scenario.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Mon May 01 2017
Journal Name
2017 5th International Conference On Information And Communication Technology (icoic7)
Analysis of the number of ants in ant colony system algorithm
...Show More Authors

View Publication
Scopus (29)
Crossref (14)
Scopus Crossref
Publication Date
Sat Dec 01 2018
Journal Name
Al-khwarizmi Engineering Journal
Applying A* Path Planning Algorithm Based on Modified C-Space Analysis
...Show More Authors

In this paper, a modified derivation has been introduced to analyze the construction of C-space. The profit from using C-space is to make the process of path planning more safety and easer. After getting the C-space construction and map for two-link planar robot arm, which include all the possible situations of collision between robot parts and obstacle(s), the A* algorithm, which is usually used to find a heuristic path on Cartesian W-space, has been used to find a heuristic path on C-space map. Several modifications are needed to apply the methodology for a manipulator with degrees of freedom more than two. The results of C-space map, which are derived by the modified analysis, prove the accuracy of the overall C-space mapping and cons

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Thu Oct 01 2015
Journal Name
Applied Mathematics And Computation
Identification of the time-dependent conductivity of an inhomogeneous diffusive material
...Show More Authors

View Publication
Scopus (10)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Wed Jul 12 2023
Journal Name
Energies
Finite Time Disturbance Observer Based on Air Conditioning System Control Scheme
...Show More Authors

A novel robust finite time disturbance observer (RFTDO) based on an independent output-finite time composite control (FTCC) scheme is proposed for an air conditioning-system temperature and humidity regulation. The variable air volume (VAV) of the system is represented by two first-order mathematical models for the temperature and humidity dynamics. In the temperature loop dynamics, a RFTDO temperature (RFTDO-T) and an FTCC temperature (FTCC-T) are designed to estimate and reject the lumped disturbances of the temperature subsystem. In the humidity loop, a robust output of the FTCC humidity (FTCC-H) and RFTDO humidity (RFTDO-H) are also designed to estimate and reject the lumped disturbances of the humidity subsystem. Based on Lyapunov theo

... Show More
View Publication
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Reducing of Manufacturing Lead Time by Implementation of Lean Manufacturing Principles
...Show More Authors

Many organizations today are  interesting to implementing lean manufacturing principles  that should enable them to eliminating the wastes to reducing a  manufacturing lead time.  This paper concentrates on  increasing  the competitive level of the company in globalization markets and improving of the productivity by reducing the manufacturing lead time. This will be by using the main tool of lean manufacturing which is value stream mapping (VSM) to identifying all the activities of manufacturing process (value and non-value added activities) to reducing elimination of wastes (non-value added activities) by converting a manufacturing system to pull instead of push by applying some of pull system strategies a

... Show More
View Publication Preview PDF
Publication Date
Mon May 27 2019
Journal Name
Al-academy
Time Aesthetics in the Documentary Film: حسام الدين محمد عبد المنعم
...Show More Authors

The research dealt with the study of the element of time in the cinematic language and the role it plays in creating the aesthetic meanings in the documentary film by means of the various structural constructions with which time is constructed. The research included the introduction and the problem of research, which was represented by the following question: (Did the documentary film adopt the values of time formats in the fiction film or it created for itself special linguistic formulations and models which achieve the aesthetic concept?). It also included the importance of research, the need for it and its goal in addition to clarifying the limits of research.The theoretical framework included three sections the first of which is the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Dec 22 2025
Journal Name
Baghdad Science Journal
Study the effect of position on the time of astronomical twilight
...Show More Authors

Twilight is that light appear on the horizon before sunrise and after sunset, Astronomically it is known that sunrise and sunset are effected by high above sea level, but the effect of high above sea level on the time of astronomical twilight still not decided and controversy among astronomers, in This research we studies the effect of high above sea level on the time of astronomical twilight, through adding the equation correct high above sea level to equation computation of twilight and then calculate of changing in the time of twilight for different highest (0-10000) meters above sea level , and the ratio of increase for time with high between (15.45-20.5) minutes. It was found that there was an increase in the time of the twilight along

... Show More
View Publication
Publication Date
Wed Sep 21 2016
Journal Name
Applicable Analysis
Retrieving the time-dependent thermal conductivity of an orthotropic rectangular conductor
...Show More Authors

View Publication
Scopus (4)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Thu Dec 01 2016
Journal Name
Optik
Effect of hydrothermal growth time on ZnO nanorod arrays photoelectrode performance
...Show More Authors

View Publication
Scopus (44)
Crossref (37)
Scopus Clarivate Crossref
Publication Date
Tue Nov 09 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Effect Of Time Driven Activity Based Costing in Pricing Decisions
...Show More Authors

The research aims to demonstrate the impact of TDABC as a strategic technology compatible with the rapid developments and changes in the contemporary business environment) on pricing decisions. As TDABC provides a new philosophy in the process of allocating indirect costs through time directives of resources and activities to the goal of cost, identifying unused energy and associated costs, which provides the management of economic units with financial and non-financial information that helps them in the complex and dangerous decision-making process. Of pricing decisions. To achieve better pricing decisions in light of the endeavor to maintain customers in a highly competitive environment and a variety of alternatives, the resear

... Show More
View Publication Preview PDF