Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time with the available funds. The model has been tested in multi scenarios, and the results are analyzed. The results show that negative cash flow is minimized from −693,784 to −634,514 in enterprise I and from −2,646,408 to −2,529,324 in enterprise II in the first scenario and also results show that negative cash flow is minimized to −612,768 with a profit of +200,116 in enterprise I and to −2,597,290 with a profit of +1,537,632 in enterprise II in the second scenario.
RA is a complex chronic disease, primarily affects the lining of the synovial joints and can cause progressive disability, premature death, and socioeconomic burdens. The clinical manifestations of symmetrical joint involvement include arthralgia, swelling, redness, and even limiting the range of motion. The pathogenesis is not known therefore the study included Rheumatoid arthritis (RA) is one of systemic inflammatory diseases that characterized by a progressive disabling course. The study included patients suffering from RA and as healthy controls. immunological and genetic factor were evaluated in each subject by using serum level of cytokine and genetic factor. The etiopathology of the disease is not well known for this reason the study
... Show MoreBackground. Gene polymorphisms affect etanercept’s pharmacokinetics, pharmacodynamics, and side effects. This effect is evidenced by the extensive genetic variation in the drug’s targets. Objectives. This study aims to find the association between different genotypes of the promoter region of the TNF-α gene at -308G/A(rs1800629), -857C/T(rs1799724), -863 C/A(rs1800630), -1031 T/C (rs1799964), -806 C/T (rs4248158) and -376 G/A (rs1800750) and the side effects of ETN that occurred to Iraqi RA patients. Method. The trial included patients with rheumatoid arthritis who had been using ETN for at least six months. The participants were from the Baghdad Teaching Hospital Rheumatology Unit. The PCR was sequenced to determine the polymo
... Show MoreThis study was designed to stand on the most important causes of contamination in sesarean section in women by the aerobic bacteria species the bacteria isolates were diagnosed in the Maternity and Children Hospital in the Qadsiya province and in the special clinics. Sixty five persent of women having cesarean operation were contaminated with different bacteria in different ratios. Staphylococcus aureus showed the higher percentage (62.4) , Pseudomonas.aerogenosa 18% , E.coli 9.5% and Proteus.spp (6,4%).While Streptococcus pyogens showed lowest percentage 3.6% . The results of antibiotic sensitivity test for all bacteria isolates showed Chloramphenicol and Ami
... Show MoreOften times, especially in practical applications, it is difficult to obtain data that is not tainted by a problem that may be related to the inconsistency of the variance of error or any other problem that impedes the use of the usual methods represented by the method of the ordinary least squares (OLS), To find the capabilities of the features of the multiple linear models, This is why many statisticians resort to the use of estimates by immune methods Especially with the presence of outliers, as well as the problem of error Variance instability, Two methods of horsepower were adopted, they are the robust weighted least square(RWLS)& the two-step robust weighted least square method(TSRWLS), and their performance was verifie
... Show MoreForm of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo
... Show MoreIn this research, Mn-doped TiO2 thin films were grown on glass, Si and OIT/glass substrates by R.F magnetron sputtering technique with thicknesses (250 nm) using TiO2:Mn target under Ar gas pressure and power of 100 Watt. Through the results of X-ray diffraction, the prepared thin films are of the polycrystallization type after the process of annealing at 600°C for two hour The average crystalline size were 145.32, 280.97 and 261.23 nm for (TiO2:Mn) thin film on glass, Si and OIT/glass substrates respectively, while the measured surface roughness is between 0.981nm and 1.14 nm. The fabricated (TiO2:Mn) thin film on glass sensors have high sensitivity for hydrogen( H2 reducing gas) compared to the sensitivity for hydrogen gas on Si and OIT/
... Show MoreThis research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show More